How to Fill Out California CPUC Annual Report Form (w/Examples) + FAQs

The California Public Utilities Commission (CPUC) Annual Report is a yearly compliance filing that every CPUC-regulated entity — telephone corporations, water and sewer utilities, electric and gas utilities, transportation network companies (TNCs), passenger and charter-party carriers (TCPs), household goods carriers (HHGs), and rail carriers — must submit to the Commission so the state can track revenue, safety, service quality, supplier diversity, and surcharge remittances. Filing on time and accurately is the single biggest compliance event on a regulated company’s calendar, and the Public Utilities Code §§ 581 through 584 gives the CPUC subpoena-level authority to demand it.

The form solves a real problem: California cannot calibrate the Public Utilities Commission Reimbursement Fee, the Universal Lifeline Telephone Service surcharge, or set just-and-reasonable rates without verified annual data from each regulated company. Get a number wrong, miss a schedule, or file late and the consequences range from a $500 to $50,000 daily penalty under Pub. Util. Code § 2107 to suspension of operating authority. According to the CPUC’s own Annual Reports webpage, the Commission processes more than 1,800 utility and carrier annual reports each year, and roughly 15% are returned for correction because of avoidable filing errors.

Here is what this guide will deliver:

  • 📋 A line-by-line walkthrough of the most common CPUC Annual Report schedules
  • 💧 Tailored guidance for water, energy, telecom, and transportation filers
  • 🧾 Three real-world filled-out scenarios you can copy from
  • ⚖️ The exact statutes, General Orders, and Decisions that govern each field
  • 🚨 The top mistakes that trigger rejection, penalties, or audits

What the Form Is and Who Must File It

The CPUC Annual Report is not one form — it is a family of reports, each tailored to a regulated industry, but all sharing the same legal backbone in Pub. Util. Code § 581, which requires every public utility to furnish information whenever the Commission demands it. The Commission demands it every year. The reporting year is the prior calendar year (January 1 to December 31), and most reports are due between March 31 and May 1 of the following year.

Telephone corporations file the Telephone Corporation Annual Report under GO 104-A. Class A, B, C, and D water utilities file the Water Utility Annual Report on forms keyed to system size. Electric and gas utilities file under GO 65-C and cross-reference FERC Form 1. Transportation network companies file under Decision 20-03-014, and passenger carriers file under GO 157-E. Household goods carriers file under MAX 4.

Every CPUC-regulated entity with active operating authority must file, even if the company had zero revenue for the year. A “zero report” still counts as a filing. Failing to file at all is treated as a willful violation under Pub. Util. Code § 2108, and each day the report is late counts as a separate offense. Affiliates, holding companies, and successor entities that took over operations mid-year must also file for the partial period they controlled.

The Commission also requires a supplier diversity report under GO 156 from utilities with gross California revenues above $25 million. That filing is technically separate, but most companies submit it alongside the main annual report because the data overlaps.

Before You Start: Documents and Information You Need

Pull every document below before you open the form. CPUC reports demand reconciled, audited, and cross-referenced numbers, and trying to source them mid-filing is how filers miss deadlines. Use this pre-filing checklist as your gatekeeper.

  • CPUC Utility ID or Carrier Number. This is the U-number (e.g., U-1234-C), TCP number, or T-number assigned when you got operating authority. Without it, the portal will reject your upload.
  • Prior-year annual report. You will reconcile this year’s opening balances to last year’s closing balances. A mismatch triggers an automatic data-quality flag.
  • Audited or reviewed financial statements. Class A water and energy utilities need a CPA opinion; smaller carriers need at minimum a compiled income statement and balance sheet.
  • General ledger trial balance as of December 31. Every revenue and expense line on the report ties back to a GL account.
  • Federal tax return (Form 1120, 1120-S, or 1065). The Commission cross-checks gross revenues against your federal return.
  • CA Department of Tax and Fee Administration filings. Sales and use tax data supports your intrastate revenue figures.
  • Insurance certificates. Transportation filers must show active liability coverage that meets GO 115-G or GO 157-E minimums.
  • Driver and vehicle rosters. TNCs, TCPs, and HHGs must list every driver and every vehicle operated during the year, by VIN.
  • Plant-in-service ledger. Utilities report additions, retirements, and depreciation by FERC/USOA account.
  • Supplier diversity spend data. Companies above the $25 million threshold need WMDVLGBTBE-certified spend broken out by category.
  • Universal service surcharge remittances. Telecom filers reconcile their CHCF-A, CHCF-B, ULTS, DDTP, CASF, and CRS surcharge payments.

If any of these are missing, do not file with placeholder numbers. Estimates without disclosure are treated as false statements under Pub. Util. Code § 2113.

Where to Get the Form and How to Access It

The CPUC publishes every annual report form on its industry-specific landing pages. There is no single master URL because each industry uses a different schedule and template. The cleanest entry point is the CPUC Annual Reports Hub, which routes you to the right form by entity type.

Telephone corporations download the report packet from the Communications Division Annual Reports page and submit through the CD Annual Reports email portal. Water utilities pull their Class A, B, C, or D template from the Division of Water and Audits page. Energy utilities use the FERC Form 1/Form 2 plus the CPUC supplemental schedules. TNCs, TCPs, and HHGs file through the CPUC Online Filing system using their carrier credentials.

Always check the revision date printed in the lower-left corner of the form. The CPUC revises schedules almost every year, and using a stale template is a top-three rejection reason. If the revision date is older than the prior December, do not file — pull the current version.

You will also need an active CPUC Online Account for any portal-based filing. Account creation takes 3 to 5 business days because the Commission verifies your U-number against its licensing database. Do not wait until late March to register.

Step-by-Step: How to Fill Out the CPUC Annual Report Line by Line

The schedules below appear on nearly every version of the CPUC Annual Report. Field names match the official forms verbatim. For each field, follow the six-element pattern: what it asks, how to answer, an example entry, an edge case, the common mistake, and the misconception that trips filers up.

Cover Page – Utility/Carrier Name (Box 1)

This box asks for the exact legal name of the entity holding CPUC operating authority. Enter the name as it appears on your Certificate of Public Convenience and Necessity (CPCN) or carrier permit. Use all capital letters if the form is a fillable PDF that defaults to caps; otherwise use title case.

For example, GOLDEN STATE WATER COMPANY writes its name exactly that way, not “Golden State Water Co.” or “GSWC.” If your DBA differs from your legal name, list the legal name first, then write dba [Trade Name] directly underneath. The most common edge case is a recent name change; if you legally renamed mid-year, list the new name and add a footnote referencing the advice letter that recorded the change.

The most common mistake is using a marketing name or a parent-company name. The consequence is direct: the CPUC database will not match the filing to any active U-number, and the report goes into the rejection queue. The misconception filers carry in is that the Commission “knows who you are” from the email address — it does not, and the database is keyed strictly on legal name plus U-number.

Cover Page – CPUC Utility Number (Box 2)

This box wants your U-number, T-number, or TCP number assigned when the Commission granted your authority. Format it exactly as the certificate prints it, including the suffix letter (e.g., U-133-W, TCP-12345-B, T-0123). Do not add spaces or rearrange the components.

For example, Aisha runs a small charter limousine company and writes TCP-29481-P in Box 2. If you hold multiple authorities (a water and a sewer certificate, for instance), file a separate report for each U-number — never combine them. The edge case to watch: companies that recently surrendered or had authority revoked still owe a final report for the partial year.

The common mistake is entering the application number (A.XX-XX-XXX) instead of the U-number. The consequence is automatic rejection because application numbers reference a docket, not a regulated entity. The misconception is that “U-1234” and “U-1234-C” are interchangeable; they are not, and the suffix tells the Commission which industry schedule to apply.

Schedule A – Gross Intrastate Revenue

Schedule A asks for total revenue earned from California intrastate operations during the calendar year, broken out by service category. Pull the figure from your general ledger, not the federal tax return, because federal returns include interstate and out-of-state revenue. Round to the nearest whole dollar.

For example, Marcus operates a Class C water utility serving 1,200 connections, and reports $847,213 on the residential metered line of Schedule A. If you collect both regulated and non-regulated revenue (e.g., a water company that also rents cell-tower space on its tanks), separate the two — only regulated revenue feeds the Reimbursement Fee calculation. The edge case is bundled service offerings, like a telecom that sells voice plus broadband; allocate using the FCC safe-harbor percentages or your traffic study.

The common mistake is reporting gross billed revenue instead of recognized revenue, which inflates the surcharge base. The consequence is overpayment of the user fee with no easy refund mechanism. The misconception is that “intrastate” means “billed to a California address” — it actually means the call, trip, or service originated and terminated in California.

Schedule B – Operating Expenses by Account

Schedule B reports operating expenses by Uniform System of Accounts (USOA) category. Water utilities use the NARUC USOA; telecom uses Part 32; energy utilities use the FERC USOA. Map each GL account to the right schedule line.

For example, Janet’s Class A water utility reports $2,340,118 on Account 641 (Salaries and Wages – Operations). If you cannot map an expense cleanly, place it in the closest matching account and add a footnote explaining the allocation. The edge case is shared services from a parent company; book them at fully allocated cost using your CAM (cost allocation manual), and disclose the methodology.

The common mistake is reporting total company expenses instead of California-jurisdictional expenses. The consequence is a distorted return on equity calculation in your next general rate case. The misconception is that depreciation belongs on Schedule B; it does not — depreciation goes on its own schedule tied to plant accounts.

Schedule C – Plant in Service

Schedule C captures utility plant in service at the beginning of the year, additions, retirements, transfers, and the year-end balance. Each line corresponds to a USOA plant account (e.g., Account 311 – Structures and Improvements, Account 331 – Transmission and Distribution Mains).

For example, Carlos’s mid-size telephone corporation enters $14,210,330 in beginning-of-year Account 2232 (Circuit Equipment), $1,840,000 in additions, $210,000 in retirements, and $15,840,330 year-end. The edge case is contributions in aid of construction (CIAC) for water utilities; record them gross and offset with accumulated depreciation per GO 103-A. Always reconcile additions to your capital project ledger.

The common mistake is netting retirements against additions, which hides the true gross plant figure. The consequence is a misstated rate base, which can cost you millions of dollars in a future rate proceeding. The misconception is that fully depreciated assets drop off the schedule; they stay on until physically retired and removed from the GL.

Schedule D – Number of Customers or Connections

Schedule D asks for the count of customers, access lines, or service connections as of December 31, broken out by class (residential, commercial, industrial, public authority, irrigation, etc.). Use a point-in-time snapshot, not a yearly average.

For example, a small Class C water utility writes 1,184 residential, 37 commercial, and 0 industrial connections. The edge case is master-metered apartment buildings — count one connection per meter, not one per dwelling unit. Disconnected accounts that retained service availability fees still count as customers if they are billed.

The common mistake is using the average customer count instead of the year-end count. The consequence is a misaligned customer-revenue ratio that flags your filing for desk audit. The misconception is that “vacant” customers don’t count; if the meter is installed and the account exists, they do.

Schedule E – Taxes Other Than Income

Schedule E reports property taxes, payroll taxes, franchise taxes, and other non-income taxes paid during the year. Pull the figures from your tax-paid GL accounts and reconcile to the actual tax bills you received.

For example, Aisha’s TCP fleet reports $48,210 on the property tax line covering vehicles registered in California. The edge case is mid-year acquisitions; pro-rate the property tax by the months you owned the asset. Federal payroll taxes (Social Security, Medicare) belong here, but federal income tax does not.

The common mistake is including state and federal income tax on this schedule. The consequence is a double-count when you also report income tax on the operating statement. The misconception is that sales tax collected from customers belongs on Schedule E; it does not — sales tax is a pass-through, not an expense.

Schedule F – Officers and Directors

Schedule F lists every officer, director, and 10%-or-greater shareholder with name, title, address, and total compensation paid during the year. Use legal names and full mailing addresses.

For example, Maria Lopez, CFO, 1200 Market Street, San Francisco, CA 94102, $385,000 appears on the schedule for a mid-size telecom. The edge case is independent directors paid only in stock; convert the stock award to fair-market-value dollars and disclose the valuation method. Officers who served part of the year get listed with their service dates.

The common mistake is omitting officers from a parent company who functioned as de facto officers of the regulated entity. The consequence is a GO 65-C violation referral. The misconception is that the schedule is “for shareholders only”; the Commission cares about anyone with operational control, regardless of equity stake.

Schedule G – Affiliate Transactions

Schedule G discloses every transaction with an affiliated company above the materiality threshold (typically $50,000 for Class A utilities, lower for telecom). List the affiliate, the nature of the transaction, the dollar amount, and the pricing methodology.

For example, Western Holdings LLC – Management Services – $1,210,400 – Fully Allocated Cost per CAM Section 4.2. The edge case is two-way transactions where the regulated entity both buys from and sells to the affiliate; report each direction separately. Compliance is enforced under the Affiliate Transaction Rules adopted in D.97-12-088.

The common mistake is omitting service-sharing arrangements that “didn’t have an invoice.” The consequence is a referral to the Commission’s audit team and potential disallowance of the costs in your next rate case. The misconception is that arms-length pricing is automatically defensible; the CPUC requires fully allocated cost or the lower of cost vs. market, not arms-length alone.

Schedule H – Supplier Diversity (GO 156)

Schedule H, required for utilities with gross California revenues above $25 million, reports procurement spend with women, minority, disabled veteran, LGBT, and persons-with-disabilities-owned business enterprises (WMDVLGBTPWDBE). Break out spend by category and certification source.

For example, a large IOU enters $184,210,000 total diverse spend, 14.2% of total California procurement, with subcategories tied to Supplier Clearinghouse certifications. The edge case is sub-tier spend (your prime contractor’s diverse subcontractors); count it only when properly tracked through a Tier 2 program. The 21.5% aspirational goal under GO 156 is a goal, not a mandate.

The common mistake is counting spend with self-certified suppliers who never went through Supplier Clearinghouse. The consequence is the entire amount gets struck during the CPUC review. The misconception is that minority-owned franchises of national chains count automatically; they need their own certification.

Schedule I – Universal Service Surcharge Reconciliation (Telecom Only)

Telecom filers reconcile their CHCF-A, CHCF-B, ULTS, DDTP, CASF, and CRS surcharge remittances to the surcharge base reported on Schedule A. Each surcharge has its own line and rate, and the rates change annually per Commission resolution.

For example, a CLEC reports surcharge base of $8,420,000, ULTS rate of 0.4%, and ULTS remittance of $33,680. The edge case is bundled service revenue; allocate the assessable portion using the FCC safe harbor or a traffic study. The current rates are posted on the Communications Division surcharge page.

The common mistake is using the prior-year surcharge rate after a mid-year rate change. The consequence is under-remittance and a true-up assessment with interest. The misconception is that prepaid wireless is exempt; it is not — it is collected at point of sale per AB 1717.

Schedule J – Driver and Vehicle Roster (Transportation Only)

TNCs, TCPs, and HHGs list every driver who provided service during the year and every vehicle in revenue service. Driver records include name, license number, hire date, and termination date if applicable. Vehicle records include VIN, year, make, model, and CPUC vehicle ID.

For example, a TNC enters Driver: J. Nguyen, CDL N1234567, Hire 03/15/2024, Active; Vehicle: 1HGCM82633A123456, 2023 Toyota Camry, TNC-VEH-118. The edge case is leased vehicles; report the operator, not the title holder, in the carrier column. Background checks and drug test compliance are reported on a separate safety schedule under D.20-03-014.

The common mistake is omitting drivers who were on the platform but never completed a trip. The consequence is a safety-data violation under Pub. Util. Code § 5440. The misconception is that independent contractors don’t need to be listed; CPUC defines “driver” by activity on the platform, not employment status.

Verification Page – Officer Signature

The verification page is a sworn statement signed under penalty of perjury by an officer with personal knowledge. Print the officer’s name, title, and date, and apply a wet or DocuSign signature.

For example, Maria Lopez, CFO, 04/22/2026 signs the verification for a Class A water utility. The edge case is electronic submission; CPUC accepts DocuSign and Adobe Sign with audit trail attached, but not a typed name without a certificate. Without a valid signature, the report is not “filed” — it is merely “received.”

The common mistake is having a junior staff member sign on behalf of the officer. The consequence is the report is deemed unfiled, exposing the company to per-day late penalties. The misconception is that the verification is a formality; it is the legal hook for Pub. Util. Code § 2113 perjury liability if the data is false.

Three Filled-Out Examples Using Real Scenarios

Below are three named filers walking through their CPUC Annual Report from cover page to verification. Each scenario covers a different industry and entity size to show the range.

Scenario 1 – Aisha, Single-Vehicle TCP Charter Operator

Form Section What Aisha Enters
Box 1 – Legal Name AISHA RIDES LLC
Box 2 – CPUC Number TCP-29481-P
Schedule A – Gross Intrastate Revenue $84,200
Schedule B – Operating Expenses $61,400 (fuel, insurance, maintenance)
Schedule D – Vehicles in Service 1
Schedule E – Property and Payroll Taxes $2,140
Schedule J – Driver Roster Aisha Patel, CDL P9876543, Hire 06/01/2022, Active
Schedule J – Vehicle Roster 2022 Cadillac Escalade, VIN 1GYS4BKJ4NR123456
Verification Aisha Patel, Owner, 04/15/2026

Scenario 2 – Marcus, Class C Water Utility (1,184 connections)

Form Section What Marcus Enters
Box 1 – Legal Name PINE RIDGE WATER COMPANY
Box 2 – CPUC Number U-318-W
Schedule A – Residential Metered Revenue $847,213
Schedule A – Service Charges $92,440
Schedule C – Plant in Service Year-End $4,210,800
Schedule D – Residential Connections 1,184
Schedule E – Property Taxes $38,210
Schedule G – Affiliate Transactions $0 (no affiliates)
Verification Marcus Greene, President, 04/28/2026

Scenario 3 – Janet, Mid-Size Competitive Local Exchange Carrier (CLEC)

Form Section What Janet Enters
Box 1 – Legal Name PACIFIC LINK TELECOM INC. dba PacLink
Box 2 – CPUC Number U-7411-C
Schedule A – Intrastate Revenue $8,420,000
Schedule B – Operating Expenses $6,210,000
Schedule C – Circuit Equipment Year-End $15,840,330
Schedule D – Access Lines 18,420
Schedule F – Officers Janet Wu, CEO, 100 Pine St SF CA, $410,000
Schedule I – ULTS Surcharge Remitted $33,680
Schedule H – GO 156 Diverse Spend $1,840,000 (21.8%)
Verification Janet Wu, CEO, 03/30/2026

How to File the Completed Form

CPUC accepts annual reports through three channels, and the right one depends on your industry. Pick wrong and the report sits in limbo until someone routes it to the right division.

Online portal (TNCs, TCPs, HHGs). Log into the CPUC Online Filing system using your carrier credentials. Upload the completed PDF and supporting Excel schedules. There is no filing fee for the annual report itself, though the Reimbursement Fee assessed afterward is a separate invoice. Processing acknowledgement is automated within 24 hours; keep the confirmation email as proof of filing.

Email (Telecom). Send the completed Excel workbook and signed verification PDF to the Communications Division at CDAnnualReports@cpuc.ca.gov. File size limit is 25 MB; if larger, use the CPUC SharePoint upload link the analyst sends you. No fee. Keep the email plus the auto-reply as proof of filing.

Mail or hand delivery (Water, Energy, paper-only filers). Send two paper copies plus a CD or USB drive containing the Excel workbook to:

California Public Utilities Commission Division of Water and Audits (or Energy Division) 505 Van Ness Avenue San Francisco, CA 94102

Use certified mail return receipt or a courier with tracking. The postmark, not the receipt date, controls timeliness. There is no filing fee. The Commission’s docket office hours are 8:00 a.m. to noon and 1:00 p.m. to 4:30 p.m. weekdays.

For all channels, retain a complete file copy for at least seven years because the Commission can audit any field on the report under Pub. Util. Code § 314.

What Happens After You File

After submission, the assigned division performs a completeness review within 30 days. If schedules are missing or numbers fail tie-out checks, you receive a deficiency letter giving you 15 days to cure. Curing within the deadline preserves your original filing date for late-filing-penalty purposes.

Once accepted, the data feeds three downstream processes. First, the Reimbursement Fee invoice is calculated using your Schedule A revenue multiplied by the current fee rate, set annually by Resolution M-4855 or its successor. Second, surcharge true-ups reconcile any over- or under-remittance during the year. Third, the data is published in CPUC industry reports and used as a baseline in your next general rate case.

If the Commission identifies material misstatements, it can open an Order Instituting Investigation (OII) under Pub. Util. Code § 1701. An OII is a litigated proceeding with discovery, hearings, and potential penalties — in 2023, the Commission collected over $80 million in penalties through enforcement actions tied to reporting deficiencies.

You may amend the report at any time by submitting an Amended Annual Report with a cover letter explaining each changed line. Amendments filed before a deficiency letter are treated more leniently than those filed after.

Mistakes to Avoid When Filling Out the Form

  • Using last year’s form template. The CPUC revises schedules yearly, and the system rejects stale templates.
  • Skipping the verification page. An unsigned report is not filed; per-day penalties accrue from the original due date.
  • Reporting gross billed revenue instead of recognized revenue. This inflates your Reimbursement Fee assessment and your surcharge base.
  • Combining multiple U-numbers into one report. Each operating authority needs its own filing; combined reports are rejected.
  • Omitting affiliate transactions. Discovery in a future rate case will surface them, and the Commission can disallow the cost recovery.
  • Reporting total company instead of California-jurisdictional figures. The schedule is jurisdictional, and federal-level numbers distort every ratio.
  • Using application numbers in place of U-numbers. Application numbers reference a docket, not a regulated entity.
  • Forgetting GO 156 supplier diversity for utilities above $25 million. This is a separate enforceable filing.
  • Mis-allocating bundled telecom revenue. Without a documented allocation method, the Commission imputes 100% intrastate.
  • Filing the FERC Form 1 alone for energy utilities. California requires the supplemental CPUC schedules on top of the federal form.
  • Letting a non-officer sign the verification. The verification carries perjury liability and must be signed by an officer with knowledge.
  • Missing the postmark deadline by relying on receipt date. Postmark, not receipt, controls timeliness.

Do’s and Don’ts

Do’s

  • Do download the current revision-dated form fresh each year from the CPUC Annual Reports Hub, because templates change without notice.
  • Do reconcile every schedule to your audited financial statements, because the CPUC audit team starts with the same tie-out.
  • Do file even when your revenue was zero, because failure to file is a separate violation regardless of activity level.
  • Do retain workpapers and source documents for seven years, because Pub. Util. Code § 314 gives the Commission audit access throughout that window.
  • Do request an extension in writing before the due date if you need one, because post-deadline extension requests carry no weight.
  • Do reconcile prior-year ending balances to current-year opening balances, because mismatches automatically flag the filing.

Don’ts

  • Don’t estimate numbers without disclosing the estimation method, because undisclosed estimates can be treated as false statements.
  • Don’t sign the verification if you lack personal knowledge of the data, because the verification is a sworn statement.
  • Don’t combine regulated and non-regulated revenue, because surcharge bases apply only to regulated revenue.
  • Don’t ignore deficiency letters past the 15-day cure window, because doing so converts a curable defect into a willful violation.
  • Don’t rely on email alone for paper-required filings, because the docket office requires physical delivery for some industries.
  • Don’t paste data from a parent-company consolidated report, because consolidated figures include affiliate eliminations the Commission rejects.

Pros and Cons of Filing on Your Own vs. With Help

Pros of filing on your own

  • You save the $5,000 to $50,000 a regulatory accounting firm typically charges for a Class A annual report.
  • You build internal expertise that compounds in future rate cases and compliance proceedings.
  • You control the timeline and avoid waiting on third-party schedules.
  • You keep sensitive financial data inside the company.
  • You learn directly which fields are scrutinized, which sharpens financial controls year-round.

Cons of filing on your own

  • A single misclassified line can trigger a multi-year audit costing far more than the consultant fee saved.
  • Affiliate-transaction rules and CAM allocations are technically complex and easy to misapply.
  • Surcharge reconciliations change yearly and are unforgiving on rate updates.
  • The verification signature carries personal liability that an outside CPA helps insulate against.
  • New schedules added by recent CPUC decisions (climate, cybersecurity, equity reporting) may go unnoticed by an internal team.

Annual Report by Industry at a Glance

Industry Form and Key Authority
Telephone Corporations Telephone Corporation Annual Report under GO 104-A
Water Utilities (Class A–D) Water Utility Annual Report under GO 103-A
Electric and Gas Utilities FERC Form 1/Form 2 plus CPUC supplements under GO 65-C
Transportation Network Companies TNC Annual Report under D.20-03-014
Passenger Carriers (TCP/PSC) TCP Annual Report under GO 157-E
Household Goods Carriers HHG Annual Report under the MAX 4 tariff
Supplier Diversity Add-On GO 156 Annual Report for utilities above $25M

FAQs

When is the CPUC Annual Report due?

Yes — most reports are due between March 31 and May 1 of the year following the reporting year, with the exact date set by industry; check your form’s cover page for the deadline that applies to your filing.

Do I have to file if my company had no revenue?

Yes — a “zero report” is still a required filing under Pub. Util. Code § 581, and skipping it is treated as a willful violation regardless of activity level.

Can I get an extension?

Yes — submit a written extension request to the assigned division before the due date, briefly explaining the cause; routine 30-day extensions are commonly granted for documented hardship.

Do I write my legal name or DBA in Box 1?

Yes to legal name first; add dba [Trade Name] directly underneath if your operating name differs from the certificate holder’s legal name.

Should Box 2 contain my application number or my U-number?

No to application number; Box 2 must contain your U-number, T-number, or TCP number exactly as printed on your certificate, including the suffix letter.

Do I report gross billed revenue on Schedule A?

No — report recognized intrastate revenue per GAAP, because surcharge bases and Reimbursement Fees are calculated on recognized, not billed, revenue.

Do drivers who never completed a trip get listed on Schedule J?

Yes — under D.20-03-014, any driver active on the platform during the year must be listed, regardless of trip count.

Is the GO 156 supplier diversity report part of the annual report?

No — it is technically a separate filing, but most utilities submit it alongside the main annual report because the data overlaps and the deadlines align.

What if I find an error after filing?

Yes — file an Amended Annual Report with a cover letter detailing each changed line; pre-deficiency-letter amendments are treated far more leniently than post-letter ones.

Can my CFO’s assistant sign the verification?

No — the verification must be signed by an officer with personal knowledge of the data; assistant signatures invalidate the filing and re-trigger late penalties.

Are penalties really up to $50,000 per day?

Yes — under Pub. Util. Code § 2107, penalties range from $500 to $50,000 per offense, and each day of non-filing is a separate offense.

Do I include interstate revenue on Schedule A?

No — Schedule A captures California intrastate revenue only; interstate and out-of-state revenue belong on your federal filings, not the CPUC report.

Does the CPUC accept DocuSign for the verification?

Yes — DocuSign and Adobe Sign are accepted when the audit-trail certificate is attached to the filing; a typed name without a certificate is not a valid signature.

How long do I keep workpapers?

Yes — retain workpapers, schedules, and source ledgers for at least seven years because Pub. Util. Code § 314 preserves the Commission’s audit access throughout that window.