The MassDEP Notice of Intent, filed on WPA Form 3, is the application a person must submit to a local Conservation Commission and the Massachusetts Department of Environmental Protection to get permission to work in or near a protected wetland. Anyone who plans to build, dig, fill, or change land within a wetland resource area or its 100-foot Buffer Zone files this form to ask for an Order of Conditions, which is the permit that lets the work move forward.
If you skip this step and disturb a wetland, the consequence can be steep. The Wetlands Protection Act, found at M.G.L. Chapter 131, Section 40, lets a Conservation Commission issue an Enforcement Order, halt your project, and require you to restore the land at your own cost. Across Massachusetts, Conservation Commissions review thousands of these filings each year, and an incomplete or wrong form is one of the most common reasons a project stalls for months.
Here is what you will learn in this guide:
- 🗺️ How to read your land and check the right resource area boxes in Section B so the Commission knows exactly what you plan to touch.
- 💰 How to calculate your filing fee and split it between the state and your town on the NOI Wetland Fee Transmittal Form without guessing.
- ✍️ How to fill out every section of WPA Form 3 line by line, with named examples you can copy.
- 📬 How to file with both your Conservation Commission and MassDEP, including addresses, copies, and proof you must keep.
- ⚠️ How to dodge the mistakes that get filings dismissed, delayed, or sent back for more information.
What the Form Is and Who Must File It
WPA Form 3, the Notice of Intent, is the main wetlands permit application in Massachusetts. You file it under the Massachusetts Wetlands Protection Act, the state law at M.G.L. c. 131, § 40, and the rules that carry it out, the Wetlands Protection Act Regulations at 310 CMR 10.00. The current form carries a revision date of 3/10/2016 in the lower corner, so check that your copy shows that date before you start.
You must file a Notice of Intent if your project will remove, dredge, fill, or alter any wetland resource area, or if it falls inside the 100-foot Buffer Zone around one. A resource area is a protected feature like a marsh, a stream bank, a flood zone, or the land near a river. The Buffer Zone is the strip of land within 100 feet of one of these features, measured from the edge.
This form covers a wide range of filers. A homeowner who wants to add a deck near a backyard stream files it. So does a builder putting up a subdivision, a town doing road work, and an engineer designing a parking lot near a marsh. The form does not care who you are; it cares about how close your work comes to the water and how much land you plan to change.
The agency that receives and decides your application is your local Conservation Commission, with MassDEP acting as a second reviewer and backstop. The Commission holds a public hearing, then issues the Order of Conditions that approves, conditions, or denies your work. Miss the form, and you have no legal path to do the work at all.
Before You Start: Documents and Information You Need
Filling out WPA Form 3 goes faster when you gather everything first. The form leans on plans, maps, and measurements that you cannot invent at the keyboard. Pull these items together before you open the form, because a missing piece is the top reason a Commission asks for more information and pushes your hearing back weeks.
Here is your pre-filing checklist:
- Your property’s street address, city, and ZIP code, because Section A needs the exact project location and a wrong address can route your filing to the wrong MassDEP regional office.
- Your Assessors Map/Plat and Parcel/Lot numbers, which you need if the lot has no building on it or is being divided, since the Commission cannot find an empty lot without them.
- The Registry of Deeds county, book, and page numbers for the property, because Section A, Item 8 ties the filing to the legal record of who owns the land.
- A site plan drawn to scale of no more than 1 inch = 50 feet on a sheet no larger than 24 by 36 inches, since the Commission rejects plans too vague to show where work meets the wetland.
- A wetland delineation showing the resource area boundaries, often with a BVW Field Data Form, because without it the Commission cannot confirm what you are near.
- A written narrative explaining how your project meets the performance standards in 310 CMR 10.00 for each resource area, since the form alone does not prove your work is allowed.
- The NHESP Natural Heritage Atlas check for rare species habitat, because if your site sits in Estimated Habitat you must mail a copy to Natural Heritage on the same day you file.
- Your check or payment for the fee, split into a state share and a town share, since MassDEP will not begin review until the fee arrives.
- Your representative’s contact details if a consultant or engineer is filing for you, because the Commission sends all notices to the listed contact.
- The names and addresses of your abutters, which you need for the separate Notification to Abutters form, since neighbors have a legal right to know about the hearing.
Where to Get the Form and How to Access It
You get WPA Form 3 from MassDEP in three ways, and the path you pick shapes how you fill it out. The easiest route is the state’s online portal, eDEP Online Filing, where you complete the form on screen and the system assigns a Document Transaction Number for you. Online filing also gives you a GIS locator that pins your project site, which fills in your latitude and longitude.
If you cannot use eDEP, you can download a Microsoft Word version of the form and type into it on your computer, then save and print it. MassDEP also offers a PDF version of WPA Form 3 that you must print and complete by hand. Both the Word and PDF copies live on the official WPA Form 3 page at Mass.gov.
Before you fill in a single box, read the official Instructions for WPA Form 3, which explain the parts of the form that are not obvious and include a completeness checklist. Also check with your local Conservation Commission first, because many towns add their own wetlands bylaw on top of the state law. A local bylaw can require extra copies, higher fees, or wider buffer zones, and the form itself warns you to consult the Commission about any municipal bylaw or ordinance before you begin.
Whichever copy you choose, use the same official form. A Commission can reject an old or altered version. The note at the top of the form also reminds computer users to move between fields with the tab key only, never the return key, because pressing return can scramble the layout.
Step-by-Step: How to Fill Out WPA Form 3 Line by Line
The form runs nine pages and breaks into six lettered sections, A through F, plus the separate fee transmittal form. Leave the shaded box in the upper right corner of page 1 blank; it holds the MassDEP File Number and Document Transaction Number, which the regional office assigns later. Work through the sections in order, attach every plan and narrative the form asks for, and keep your answers exact.
Section A, Item 1: Project Location
This field asks where your project sits on the ground. You enter the street address, city or town, and ZIP code, then the latitude and longitude, and finally the Assessors Map/Plat Number and Parcel/Lot Number.
Type the full address in plain form, such as 14 Mill Pond Road, with the city and ZIP in their own boxes. If you file online, click the button next to Item 1 and use the GIS locator to drop a pin, which fills in your coordinates for you. Sarah Chen writes 14 Mill Pond Road, Concord, 01742 in the address boxes.
The map and parcel numbers matter most when the lot has no house, school, or business on it, or when the lot is being divided. A vacant lot has no street number a reviewer can search, so the parcel number is how the Commission finds it. If your lot fits that case, leave these blank at your peril.
A common mistake here is listing a mailing address that differs from the project site, which sends reviewers to the wrong spot and delays the site visit. People also wrongly believe the GIS coordinates are optional; for online filers they are part of how MassDEP maps your project, and a blank can flag the filing as incomplete.
Section A, Items 2, 3, and 4: Applicant, Property Owner, and Representative
These fields ask who is behind the project. Item 2 is the applicant, the person or company seeking the permit. Item 3 is the property owner, required only if the owner differs from the applicant. Item 4 is the representative, such as an engineer or wetlands consultant, if anyone is filing on your behalf.
Fill in the first name, last name, organization, full address, phone, and email for each role that applies. If more than one person owns the property, check the Check if more than one owner box and attach a list of the other owners. James Okafor lists himself as applicant, his wife Amara Okafor as co-owner with the box checked, and Coastal Wetland Consulting LLC as representative.
If you rent the land or have a buyer’s interest, you still name the legal owner in Item 3 so the record is clean. A nuance many filers miss: the Commission mails hearing notices and decisions to the representative when one is listed, so a wrong email in Item 4 means you may never hear about your own hearing.
The common mistake is leaving Item 3 blank when the applicant is a contractor and the owner is someone else, which forces the Commission to pause and ask for the owner’s consent. A frequent misconception is that the representative needs no separate listing if they signed the form; the form treats the representative as a distinct contact, not a stand-in for the applicant.
Section A, Item 5: Total WPA Fee Paid
This field reports the money. It has three boxes: the Total Fee Paid, the State Fee Paid, and the City/Town Fee Paid. You copy these numbers straight from the NOI Wetland Fee Transmittal Form after you calculate them.
Do not guess these figures here; finish the fee form first, then transfer the totals. After her math, Sarah Chen writes 110 in Total Fee Paid, 42.50 in State Fee Paid, and 67.50 in City/Town Fee Paid. The three numbers must add up, with the total equal to the state share plus the town share.
The split follows a fixed rule explained in the fee instructions. The town gets the first $25 plus half the rest, and the state gets half of everything over $25. A mismatch between this box and your attached checks is a red flag that can stall fee confirmation.
The common mistake is entering the full fee in all three boxes, which makes the form look like you owe triple. The misconception is that one check covers everything; in fact you write separate checks, one to your town and one to the Commonwealth, and this box shows the breakdown.
Section A, Item 6: General Project Description
This field asks you to describe, in plain words, what you plan to build or change. You write a short paragraph naming the work and pointing to the maps and plans that show it.
Keep it clear and tied to your plans. Describe both the current site and the proposed site, and mention any temporary construction impacts, replication areas, or other steps you will take to protect the wetland. James Okafor writes: Construct a 12-by-16-foot wood deck and stairs within the 100-foot Buffer Zone to a Bordering Vegetated Wetland; no work within the wetland itself; see Sheet C-1.
If your project has several parts, list each so the Commission sees the full scope. A vague line like “yard work” invites questions and delay, because the Commission cannot judge impacts it cannot picture.
The common mistake is writing too little, which forces the reviewer to request more information and resets your timeline. The misconception is that the plans speak for themselves; the narrative is what ties the boxes you check to the work you describe, and reviewers read it first.
Section A, Item 7: Project Type Checklist
This field sorts your project into a category. Item 7a lists project types like Single Family Home, Residential Subdivision, Commercial/Industrial, Dock/Pier, Utilities, Coastal Engineering Structure, Agriculture, Transportation, and Other. Item 7b asks whether any part of the work qualifies as a limited project under 310 CMR 10.24 or 310 CMR 10.53.
Check the one box in 7a that best fits, and if more than one applies, the form lets you mark each that fits the work. For 7b, check Yes only if your project matches a listed limited project type, then name which one. Sarah Chen checks Single Family Home in 7a and No in 7b for her backyard shed.
A limited project is a special category that can proceed even when it cannot fully meet the normal performance standards, such as some road crossings or ecological restoration. If you check Yes for an Ecological Restoration Limited Project, you must also attach Appendix A, the checklist and signed certification.
The common mistake is checking a limited project box without understanding the rule, which invites a tougher review. The misconception is that “Other” is a safe catch-all; reviewers often ask why a project labeled “Other” does not fit a named type, so choose the closest real category.
Section A, Item 8: Property Recorded at the Registry of Deeds
This field links your filing to the legal land record. You enter the county, the certificate number if the land is registered, and the book and page number from the deed.
Find these on your deed or through the Registry of Deeds for your county. If your project covers several parcels, attach the extra book and page numbers. James Okafor enters Middlesex as the county, leaves the certificate box blank for recorded land, and writes Book 41250, Page 88.
Registered land, called Land Court land, uses a certificate number instead of a book and page, so fill the box that matches your title. Mixing the two confuses the record.
The common mistake is leaving this blank because it feels like paperwork trivia, but it ties the Order of Conditions to your property so future owners can find it. The misconception is that the deed numbers do not matter for a small project; they always matter, because the Order gets recorded against the title.
Section B: Buffer Zone and Resource Area Impacts
This is the heart of the form, where you tell the Commission exactly which protected areas your work touches and how much you will change. First, Item 1 asks whether your project is Buffer Zone Only, meaning entirely within 100 feet of a wetland but not inside the wetland itself. If you check that box, you skip the rest of Section B and go straight to Section C.
If your work reaches into a resource area, you fill in the matching lines. Item 2 covers inland resource areas, listed in 310 CMR 10.54 through 10.58, including Bank in linear feet, Bordering Vegetated Wetland in square feet, Land Under Waterbodies and Waterways, Bordering Land Subject to Flooding, Isolated Land Subject to Flooding, and Riverfront Area. Item 3 covers coastal resource areas under 310 CMR 10.25 through 10.35, such as Land Under the Ocean, Coastal Beaches, Coastal Dunes, Coastal Banks, Salt Marshes, and Land Subject to Coastal Storm Flowage.
For each resource area you check, enter the size of the proposed alteration and any proposed replacement area, using the unit the form names, such as square feet or linear feet. A developer, Priya Nair, checks Bordering Vegetated Wetland and writes 2,400 square feet of alteration with 2,400 square feet of replacement. You must also attach a narrative for each checked area showing how the work meets the performance standards, including an alternatives analysis where the rules require one.
The Riverfront Area line, Item 2f, carries special steps. You name the waterway, check the width that applies (25 feet in designated densely developed areas, 100 feet for new agriculture, or 200 feet for all other projects), state the total Riverfront Area on the site, and break down the proposed alteration inside and outside the first 100 feet. You also answer whether an alternatives analysis is attached and whether the lot was created before August 1, 1996, since older lots get some relief from the strictest riverfront rules.
The common mistake is checking Buffer Zone Only when the work actually clips the wetland edge, which understates your impact and can void the Order later. The misconception is that small numbers do not need a narrative; every checked resource area needs supporting documentation, no matter how small the footprint.
Section C: Other Applicable Standards and Requirements
This section catches special rules that ride on top of the basic wetland review. Item 1 asks whether any part of your project sits in Estimated Habitat of Rare Wildlife on the Natural Heritage Atlas maps from the Natural Heritage and Endangered Species Program. Other items cover coastal fish runs, Areas of Critical Environmental Concern, Wetlands Restriction Orders, and stormwater management.
Check Yes or No for each item based on your site. If you check Yes for rare habitat in Item 1, you must mail a copy of the Notice of Intent to NHESP at 1 Rabbit Hill Road, Westborough, MA 01581 by certified or priority mail no later than the day you file, and include proof of that mailing with your filing. Priya Nair checks Yes, mails NHESP a copy by certified mail, and staples the green receipt to her Commission copy.
A rare-species hit pulls in the Massachusetts Endangered Species Act under 321 CMR 10.18, a separate layer of review. To get a streamlined 30-day joint review, you complete the MESA section and include the supplemental information; skip it, and NHESP can require a separate MESA filing that takes up to 90 days. If your project needs stormwater controls under 310 CMR 10.05(6), you attach a Stormwater Report and, for engineered projects, the Stormwater Report Checklist signed by an engineer.
The common mistake is answering No to rare habitat without actually checking the Atlas, which can blow up the permit if NHESP later finds protected species. The misconception is that the Commission checks Natural Heritage for you; the burden sits on you, and missing the same-day NHESP mailing can sink the filing.
Section D: Additional Information
This section is where you confirm the attachments that prove your case. It calls for your site plans, your resource area delineation methodology, and any other supporting documents the project needs. Everything listed here must travel with the form when you file.
Attach plans that meet the size and scale rules, no larger than 24 by 36 inches and no smaller in scale than 1 inch = 50 feet, with a title block in the lower right corner and a graphic scale if reduced. For the delineation, attach the method you used to draw the Bordering Vegetated Wetland line, such as a BVW Field Data Form or a Final Order of Resource Area Delineation. Priya Nair attaches a stamped site plan dated 04/02/2026 and a completed BVW Field Data Form.
If a project is complex, the Commission can require that an engineer or other registered professional stamp the plans and calculations, especially for hydraulic math, critical elevations, and water control structures. Online filers must write their Document Transaction Number on every page of supplementary material so the Department can match it to the right filing.
The common mistake is sending plans drawn too small or without a scale, which the Commission cannot use and will send back. The misconception is that a hand sketch will do for a small job; even modest projects need a clear, scaled plan showing where work meets the resource area.
Section E: Fees and the NOI Wetland Fee Transmittal Form
This section sets your filing fee, and you compute it on the NOI Wetland Fee Transmittal Form. The fee depends on the type and number of activities and the resource areas they touch, with categories set in 310 CMR 10.03(7). You work through six steps: name each activity, count each activity, list its category fee, subtotal each, total the project, and split the payment.
The category fees are fixed. Category 1 activities, like an addition or pool on a single-family lot, cost $110 each. Category 2 activities, such as building a single-family house or a driveway crossing, cost $500 each. Category 3 is $1,050, Category 4 is $1,450, Category 5 is $4 per linear foot (between $100 and $2,000), and Category 6 resource area delineation is $2 per linear foot with caps. Sarah Chen’s backyard shed is one Category 1 activity, so her total is $110.
When any activity sits in the Riverfront Area as well as another resource area or its Buffer Zone, you add 50% to that activity’s fee by multiplying it by 1.5. For a riverfront-only activity not touching other areas, you skip the extra 50%. Then split the total: the town share is half the total plus $12.50, and the state share is half the total minus $12.50. On a $4,500 project, the town gets $2,262.50 and the state gets $2,237.50.
You send the state share by check, payable to the Commonwealth of Massachusetts, to MassDEP, Box 4062, Boston, MA 02211, and the town share to your Conservation Commission. Review cannot start until the fee arrives, and no fee applies to projects by a city, town, county, district, tribal or municipal housing authority, or the MBTA. You also pay to publish a legal notice in a local newspaper at least five days before the hearing.
The common mistake is forgetting the Riverfront 1.5x multiplier, which underpays the fee and stalls review until you make up the gap. The misconception is that the math splits evenly down the middle; the $12.50 shift on each side trips up filers who divide the total in half and stop.
Section F: Signatures and Submittal Requirements
This final section makes the filing official. You sign and date the form, and the property owner signs too if different from the applicant. Your signature certifies that the information is true and that you grant access for the Commission to inspect the site.
Sign in ink on paper copies, or use the eDEP certification step online. James Okafor signs and dates the form 05/12/2026, and his co-owner Amara signs the owner line. An unsigned form is not a valid filing, so a missing signature can void the whole submission.
The form also restates the mailing duty: the original and a copy go to the Conservation Commission, and one copy goes to the MassDEP regional office at the same time, both by certified mail or hand delivery. Failing to send the MassDEP copy on time can lead the Department to dismiss the application.
The common mistake is the applicant signing but forgetting the owner’s signature when they differ, which leaves the filing incomplete. The misconception is that filing with the town is enough; the MassDEP copy must go out the same day, or the clock and the legal standing of your filing are at risk.
Three Filled-Out Examples Using Real Scenarios
Below are three common scenarios, each followed through the key parts of WPA Form 3. Use them as templates, then swap in your own facts.
Sarah Chen wants to build a shed and patio in her backyard, entirely within the 100-foot Buffer Zone of a Bordering Vegetated Wetland in Concord.
| Form Section | What Sarah Enters |
|---|---|
| A.1 Project Location | 14 Mill Pond Road, Concord, 01742 |
| A.2 Applicant | Sarah Chen, homeowner, with phone and email |
| A.3 Property Owner | Same as applicant, left blank |
| A.6 Project Description | Build 10×12 shed and patio within Buffer Zone; no wetland work |
| A.7a Project Type | Single Family Home checked |
| B.1 Buffer Zone Only | Checked, then skip to Section C |
| C.1 Rare Habitat | No, after checking the Natural Heritage Atlas |
| E Fee | One Category 1 activity, $110 total |
| F Signature | Signed and dated 05/12/2026 |
James Okafor is adding a wood deck within the Buffer Zone but also clipping the edge of a Riverfront Area along a small inland river in Concord.
| Form Section | What James Enters |
|---|---|
| A.1 Project Location | 22 Riverbend Lane, Concord, 01742 |
| A.4 Representative | Coastal Wetland Consulting LLC |
| A.6 Project Description | 12×16 deck; minor grading in Riverfront Area; see Sheet C-1 |
| B.2f Riverfront Area | Names the river, checks 200 ft. width, lists alteration square feet |
| B.2f.6 Lot pre-1996 | Yes, lot created before August 1, 1996 |
| C.1 Rare Habitat | No |
| E Fee | One Category 1 activity x 1.5 riverfront = $165 total |
| D Attachments | Scaled site plan and BVW Field Data Form |
| F Signature | Applicant and co-owner both sign |
Priya Nair is an engineer filing for a developer building a small residential subdivision that will alter Bordering Vegetated Wetland and sits partly in rare-species habitat.
| Form Section | What Priya Enters |
|---|---|
| A.2 Applicant | Greenfield Homes LLC |
| A.4 Representative | Priya Nair, PE, with stamp |
| A.6 Project Description | Six-lot subdivision; 2,400 sq ft BVW alteration with replication |
| A.7a Project Type | Residential Subdivision checked |
| B.2b Bordering Vegetated Wetland | 2,400 square feet altered; 2,400 square feet replaced |
| C.1 Rare Habitat | Yes; copy mailed to NHESP same day, receipt attached |
| C.6 Stormwater | Yes; Stormwater Report and signed checklist attached |
| E Fee | Multiple Category 2 and 3 activities, several thousand dollars |
| F Signature | Applicant and engineer sign; plans stamped |
How to File the Completed Form
You file the Notice of Intent in two places at once: your local Conservation Commission and the MassDEP regional office that serves your town. The form is not valid until both copies go out together, by certified mail or hand delivery.
For the Conservation Commission, submit two copies of the completed Notice of Intent with all supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city or town fee check. For MassDEP, submit one copy of the Notice of Intent with plans, one copy of the fee transmittal form, and a copy of the state fee check to your regional office; you can find your office on the MassDEP Regional Offices list. The state fee check itself, payable to the Commonwealth of Massachusetts, goes to MassDEP, Box 4062, Boston, MA 02211.
If you can, file the form through eDEP online, which generates your Document Transaction Number and routes the filing electronically, though you still deliver paper copies and fees to the Commission. Keep your certified mail receipts and any stamped copies as proof of filing, because they show you met the same-day delivery rule. There is no separate state filing fee beyond the wetland fee you calculated, but you do pay the newspaper for the legal notice, which varies by town and often runs from $50 to a few hundred dollars.
Special filings need extra copies. If your site is in rare habitat, the Natural Heritage copy must already be mailed; if it is in a coastal fish run, a copy goes to the Division of Marine Fisheries the same day. Save every mailing receipt, since the Commission and MassDEP both want proof that these copies went out on time.
What Happens After You File
Once your filing lands, the Conservation Commission schedules a public hearing, which by law must open within 21 days of receiving your Notice of Intent. The Commission publishes your legal notice, notifies your abutters, and invites public comment at the hearing. You or your representative should attend to answer questions about the plans.
After the hearing, the Commission issues an Order of Conditions, the permit that approves your work with conditions, or denies it. The Order lists the rules you must follow during construction, such as silt fences, work limits, and inspection points, and it is recorded at the Registry of Deeds against your property. An Order of Conditions is generally valid for three years and can be extended.
If you disagree with the Commission’s decision, or if the project raises state-level concerns, either you or an abutter can ask MassDEP to issue a Superseding Order of Conditions, which reviews the matter under the state regulations. This appeal path is why the MassDEP copy of your filing matters so much; the Department needs its own record to step in. Once your Order is final and recorded, you can begin work, and you must request a Certificate of Compliance when the project is done.
Mistakes to Avoid When Filling Out the Form
- Leaving the shaded MassDEP File Number box filled in, which confuses the regional office that assigns it later.
- Checking Buffer Zone Only when the work touches the wetland edge, which understates impact and can void your Order.
- Forgetting the Riverfront Area 1.5x fee multiplier, which underpays the fee and freezes review until you cover the gap.
- Entering the full fee in all three boxes of Item 5, which makes it look like you owe triple.
- Skipping the same-day NHESP mailing when your site is in rare habitat, which can sink the permit under the Endangered Species Act.
- Submitting plans larger than 24 by 36 inches or smaller in scale than 1 inch = 50 feet, which the Commission cannot accept.
- Writing a vague project description, which triggers requests for more information and resets your timeline.
- Forgetting the property owner’s signature in Section F when the owner differs from the applicant, leaving the filing incomplete.
- Filing only with the town and not sending the MassDEP copy the same day, which can lead to dismissal.
- Omitting the resource area narrative and alternatives analysis, which the regulations require for Bordering Vegetated Wetland and Riverfront work.
- Using an old form without the 3/10/2016 revision date, which a Commission can reject outright.
- Forgetting to publish the newspaper legal notice at least five days before the hearing, which can delay the whole process.
Do’s and Don’ts
Do:
- Do check the Natural Heritage Atlas yourself before answering Section C, Item 1, because the burden of finding rare habitat sits on you.
- Do call your Conservation Commission first, because local bylaws can add copies, fees, and stricter buffers on top of state law.
- Do finish the fee transmittal form before filling Item 5, so the three fee boxes match your checks.
- Do attach a clear scaled plan with a title block, because reviewers judge impact from the plan first.
- Do keep all certified mail receipts, because they prove you met the same-day filing rule.
- Do write a detailed narrative tying each checked box to the work, since it answers questions before they are asked.
Don’t:
- Don’t guess your resource area boundaries, because a wrong delineation can void the Order later.
- Don’t use the return key while typing the computer form, since it scrambles the layout.
- Don’t sign for the owner without their real signature, because that makes the filing invalid.
- Don’t assume a small project skips the rules, since even a backyard shed in the Buffer Zone needs this form.
- Don’t underpay by skipping the Riverfront multiplier, because review halts until the fee is right.
- Don’t miss the MassDEP copy, since the Department needs it to act and to handle any appeal.
Pros and Cons of Filing on Your Own vs. With Help
| Filing Pro Se (On Your Own) | Filing With a Professional |
|---|---|
| Saves consultant fees, which can run thousands of dollars, a plus for a simple Buffer Zone project. | Costs more up front, but the fee often prevents costly delays and resubmissions. |
| Gives you full control and direct contact with the Commission, useful for a small, clear job. | A wetland scientist delineates boundaries correctly, which protects your Order from later challenge. |
| Forces you to learn the rules, which helps if you own land near wetlands long term. | An engineer can stamp plans and run the alternatives analysis the regulations demand. |
| Works well when your project is Buffer Zone Only with one Category 1 activity. | A consultant handles the NHESP, stormwater, and fee math that trip up first-time filers. |
| No waiting on a third party, so you control your own timeline for simple filings. | Strong representation at the public hearing improves your odds of a clean Order of Conditions. |
FAQs
Do I need to file a Notice of Intent for work entirely within the Buffer Zone?
Yes. Work within 100 feet of a wetland resource area needs a Notice of Intent, though you check the Buffer Zone Only box in Section B and skip the rest of that section.
Do I write the MassDEP File Number on the form myself?
No. Leave the shaded box in the upper right corner of page 1 blank, because the MassDEP regional office assigns that number to the Commission later.
Do I check both the Buffer Zone Only box and a resource area box in Section B?
No. If any work reaches a resource area, do not check Buffer Zone Only; instead fill in the size of alteration for each resource area your project touches.
Do I add 50% to the fee for Riverfront Area work?
Yes. When an activity sits in the Riverfront Area plus another resource area or its Buffer Zone, multiply that activity’s fee by 1.5; riverfront-only activities skip the extra 50%.
Do I enter the full fee in all three boxes of Item 5?
No. Item 5 splits into Total, State, and City/Town; the town gets half plus $12.50 and the state gets half minus $12.50, and the three must add up.
Do I need the property owner’s signature if I am the applicant but not the owner?
Yes. When the owner differs from the applicant, the owner signs Section F too, or the filing is incomplete and can be rejected.
Do I have to send a copy to Natural Heritage for every project?
No. You mail NHESP a copy only if your site falls in Estimated Habitat of Rare Wildlife on the Natural Heritage Atlas, and then it must go out the same day you file.
Do I file with both the Conservation Commission and MassDEP?
Yes. You send copies to your local Conservation Commission and to the MassDEP regional office at the same time, both by certified mail or hand delivery.
Do I need to write the waterway name in the Riverfront Area line?
Yes. In Section B, Item 2f you name the waterway if available and mark whether it is coastal or inland, plus the width and the area of riverfront on your site.
Do I pay one fee that covers both the state and the town?
No. You write two separate checks, one to your city or town and one to the Commonwealth of Massachusetts, matching the split shown in Item 5.
Do small projects need a scaled site plan?
Yes. Even a small job needs a plan no larger than 24 by 36 inches at a scale of 1 inch = 50 feet or finer, with a title block, so the Commission can see where work meets the wetland.
Do I have to attend the public hearing?
Yes. The Commission must open a hearing within 21 days of your filing, and you or your representative should attend to answer questions and improve your chance of a clean Order.
Do I lose the filing if I forget the legal newspaper notice?
No. You do not lose it outright, but the notice must run at least five days before the hearing, so missing it delays your hearing until you publish.
Do I need an engineer to stamp my plans?
No. Not always, but the Commission can require a registered engineer’s stamp when the work is complex, such as hydraulic calculations or water control structures.
Related reading
- How to Fill Out Florida DEP Wetland Determination (w/Examples) + FAQs
- How to Fill Out the MassDEP Notice of Intent (WPA Form 3) — With Examples + FAQs
- How to Fill Out the MassDEP / EPA NPDES Construction Stormwater Permit (With Examples) + FAQs
- How to Fill Out the MassDEP NPDES Construction Stormwater Permit (With Examples) + FAQs
- How to Fill Out the Section 404 Wetlands Permit (Joint Application) + FAQs
- How to Fill Out the Maryland MDE Wetlands and Waterways Permit (Joint Federal/State Application) + FAQs
- How to Fill Out the Washington Ecology Water Quality Modification Permit + FAQs