If you run an industrial facility in Massachusetts, your “MassDEP NPDES industrial stormwater” filing is really the EPA Multi-Sector General Permit (MSGP) Notice of Intent (NOI), filed on EPA Form 3510-6. Massachusetts is not a delegated NPDES state, so the U.S. EPA runs the industrial stormwater program here, while MassDEP plays a supporting role and steps in only for special cases like discharges near Outstanding Resource Waters.
This trips up a lot of new filers. They search for a state form, but the real document is EPA’s electronic NOI, submitted through the NPDES eReporting Tool (NeT). The 2021 MSGP took effect on March 1, 2021, and EPA has proposed a new 2026 MSGP to replace it, so check that you are working from the current permit. The form you fill out today carries OMB No. 2040-0004 and replaces the older 06/15 version.
EPA’s industrial stormwater program covers tens of thousands of facilities across the country, and a single missed NOI can expose a site to Clean Water Act penalties that now exceed $60,000 per day per violation. That is the cost of getting this wrong, and it is why every box matters.
Here is what you will learn in this guide:
- 📋 What the MSGP NOI is, who must file it, and the statute that forces your hand
- 🗂️ The exact documents and numbers to gather before you open NeT
- ✍️ A line-by-line walkthrough of every section of EPA Form 3510-6
- 🏭 Three full filled-out examples for real facility types
- ⚠️ The mistakes that get NOIs rejected and the field-level fixes for each
What the Form Is and Who Must File It
The MSGP NOI is the document an industrial operator submits to request permission to discharge stormwater that touches industrial activity into a water of the United States. Submitting a complete and accurate NOI is what actually grants you coverage under the general permit, and discharges are not authorized if your NOI is incomplete, inaccurate, or if you were never eligible. The form is EPA Form 3510-6, and it lives inside Appendix G of the 2021 MSGP.
The legal engine behind the form is section 402(p) of the Clean Water Act and the federal rules at 40 CFR Part 122. These rules ban industrial stormwater discharges to U.S. waters unless they are covered by an NPDES permit. The consequence of ignoring this is direct: an unpermitted discharge is itself a violation, even if your stormwater is clean, and EPA or a citizen group can sue. A common misconception is that only “dirty” water needs a permit; in reality, the trigger is the industrial activity exposed to rain, not proof of pollution.
You must file if you operate a facility that sits where EPA is the permitting authority (which includes all of Massachusetts), that discharges stormwater associated with one of the industrial activities in Appendix D of the MSGP, and that meets the Part 1.1 eligibility conditions. Typical filers include metal scrap and recycling yards, manufacturers, transportation and vehicle maintenance shops, landfills, and food processors. The agency that receives the form is the EPA Regional Office (Region 1 for Massachusetts), and the deadline rule is strict: a new facility must submit the NOI at least 30 calendar days before it starts discharging, per the permit’s Appendix O schedule.
Before You Start: Documents and Information You Need
Gather everything below before you log in to NeT, because the system will not save a half-finished record well and a missing detail can stall your coverage by weeks. The NOI asks for facts that come from your deed, your maps, your environmental files, and your SWPPP, so pulling them first saves real time.
- Operator legal name and mailing address. This is the legal entity that controls the facility; if it is wrong, EPA’s correspondence and your coverage notice go to the wrong place.
- Facility name, physical address, and county. The form needs the official site location, not a billing address, or your permit will reference the wrong property.
- Latitude and longitude in decimal degrees. EPA asks for the approximate center of the site; without it the form cannot be completed and coverage cannot be granted.
- Primary 4-digit SIC code or 2-letter activity code. This sets your MSGP sector and the monitoring you owe; the wrong code points you at the wrong rules.
- Receiving water name and impairment status. You need the first water of the U.S. that gets your stormwater and whether it is on the 303(d) impaired waters list or has a TMDL.
- A completed SWPPP. The permit requires your Stormwater Pollution Prevention Plan to exist before you file; filing without one is a false certification.
- Endangered species eligibility documentation. You must check listed species using the USFWS IPaC tool and the NMFS Species Directory, or you cannot certify a criterion.
- Historic property eligibility documentation. Appendix F requires you to confirm your activity will not affect historic places, or you must consult first.
- CWA Section 402 signatory authority. The certifier must be a responsible corporate officer or a duly authorized representative under 40 CFR 122.22, or the signature is invalid.
A WM15 application and a $500 fee come into play only if your site is near or discharges to Outstanding Resource Waters, per MassDEP’s WM15 process. Most filers will not need it, but knowing the trigger keeps you out of trouble.
Where to Get the Form and How to Access It
The default and required path is electronic. Part 7.2 of the permit requires you to use the NPDES eReporting Tool (NeT) to prepare and submit the NOI. You reach NeT through EPA’s Central Data Exchange (CDX), where you create an account, request the “NeT MSGP” program service, and verify your identity. The paper Form 3510-6 exists only as a fallback.
You may use the paper Form 3510-6 only if the EPA Regional Office grants you a waiver from electronic reporting. There are two waiver grounds: your headquarters sits in an area the FCC reports as under-served for broadband, or you have a documented computer access or capability problem. The consequence of skipping this step is real: if you mail a paper form without an approved waiver, EPA treats it as no submission, and you remain unpermitted.
To set up access, register at EPA’s CDX portal, add the NeT MSGP role, and complete electronic signature setup. A common misconception is that the SWPPP author can sign in NeT; only the certifier with proper authority under 40 CFR 122.22 can hit submit, though a preparer or consultant can build the record first. Allow a few days for CDX identity verification so it does not eat into your 30-day clock.
Step-by-Step: How to Fill Out EPA Form 3510-6 Line by Line
Work through the form in the order EPA prints it, Section A through Section I. In NeT the fields appear as guided screens, but the labels match the paper form below. Type in uppercase, place one character per box on paper, and abbreviate only when you run out of room.
Section A. Approval to Use Paper NOI Form
This section asks one thing in plain English: are you allowed to use the paper form at all? You answer by checking YES or NO to whether the EPA Regional Office granted you a waiver from electronic reporting, then naming the EPA staff person and the approval date.
For most filers, the honest answer is to leave this section alone and file in NeT instead. If you do have a waiver, Riverside Metals would check YES, mark the broadband under-served box, and write the EPA staffer’s name and a date like 04/15/2026. A nuance here is that the waiver is facility-headquarters based, so a company with good internet at the site but a rural headquarters may still qualify.
The common mistake is checking YES when no waiver was ever issued, which makes your whole paper filing void and leaves you discharging without coverage. The misconception worth killing is that paper is just a slower option you can pick freely; it is not, and using it without approval is the same as never filing.
Section B. Permit Information
This section asks which permit you want coverage under and a little history about your facility. You enter the Master Permit Number from Appendix C of the MSGP, then answer whether you are a new discharger or new source, whether your stormwater was covered before, and whether you have any pending enforcement action.
For Massachusetts, you pull the Region 1 master permit number from Appendix C and enter it exactly. Riverside Metals, a brand-new scrap yard, checks YES to “new discharger,” which lets it skip the prior-coverage line. An edge case: if you held coverage under the 2015 MSGP, you check NO to new discharger and then enter your old NPDES ID so EPA can link the records.
The common mistake is leaving the pending-enforcement question blank or answering NO when a notice of violation or citizen-suit notice is open; that misstatement can void coverage and add a false-certification charge. People often think a past, closed enforcement action must be disclosed here, but the question targets pending matters, not resolved ones.
Section C. Facility Operator Information
This section asks who legally runs the facility and where EPA should send mail. You provide the Operator Name, the full Mailing Address, phone, and e-mail, then a separate Operator Point of Contact name and title, and finally the NOI Preparer information if someone other than the certifier built the form.
The operator is the legal entity with control over operations, so a corporation enters its registered name, not a trade name. Green Valley Manufacturing LLC enters its legal name, lists its plant manager David Okafor as the point of contact, and lists its consultant Sarah Lin of ClearWater Compliance as the NOI preparer. A nuance: the point of contact may be the same person as the operator, and that is fine to repeat.
The common mistake is entering a parent company that does not actually control daily operations, which can make the wrong entity liable and confuse coverage. A frequent misconception is that the preparer field is optional flavor; if a consultant built the record, leaving it blank misrepresents who did the work.
Section D. Facility Information
This section pins down the physical site and its industrial profile. You enter the Facility Name and Address, the Latitude/Longitude in decimal degrees with the data source and datum, whether you are on Indian country lands, your federal operator status, ownership type, the estimated area of industrial activity exposed to stormwater to the nearest quarter acre, coal-tar sealcoat questions, and the all-important Sector-Specific Information.
For the SIC or activity code, you enter the 4-digit Primary SIC Code (or 2-letter Primary Activity Code) that best fits what the facility primarily does, plus the matching Sector and Subsector from Appendix D, and you list any co-located activities. Riverside Metals enters SIC 5093, Sector N (Scrap Recycling), and reports 2.5 acres exposed, with latitude 42.3601 N and longitude 71.0589 W from GPS using datum WGS 84. An edge case: if the site is inactive and unstaffed with nothing exposed, you check YES to that question and benchmark monitoring does not apply.
The common mistake is picking a convenient SIC code instead of the activity that drives the site, which points you at the wrong benchmark monitoring and can trigger an enforcement finding. The misconception to drop is that “area exposed” means the whole parcel; it means only the footprint of industrial activity that rain can reach, so paving an unused field does not count.
Section E. Discharge Information
This section captures what leaves your site and where it goes. You confirm you understand only authorized discharges are covered, answer whether effluent limitation guidelines apply, and complete the Receiving Waters table: a unique 3-digit Discharge Point ID for each outfall, its latitude and longitude, the receiving water name, impairment pollutants, any TMDL, salt or fresh water, and antidegradation Tier status.
You assign IDs like 001 and 002 to each outfall and trace each one to the first water of the U.S. it reaches. Riverside Metals lists outfall 001 draining to the Charles River, notes it is impaired for nutrients and bacteria, freshwater, and not a Tier 3 water. A nuance: if two outfalls are substantially identical, you can note the identical discharge point ID instead of repeating monitoring for both.
The common mistake is naming the storm drain or city pipe as the receiving water instead of the actual river or stream the MS4 carries water to, which breaks your monitoring obligations. People wrongly believe a discharge into a municipal storm sewer means no receiving water applies; you still list the ultimate water of the U.S. and the MS4 operator’s name.
Section F. Stormwater Pollution Prevention Plan (SWPPP) Information
This section asks whether your SWPPP exists and how the public can see it. You confirm the SWPPP was prepared before filing, give the SWPPP contact name, title, phone, and e-mail, then pick Option 1 (post the SWPPP at a public URL) or Option 2 (enter the key SWPPP details directly on the form).
Under Option 2 you describe onsite industrial activities exposed to stormwater, list the pollutants tied to each activity, describe your control measures, and give your housekeeping and inspection schedule. Green Valley Manufacturing chooses Option 1 and posts its SWPPP at https://greenvalleymfg.com/swppp, listing David Okafor as the SWPPP contact. An edge case: you may redact confidential business information, but you must clearly flag what you withheld.
The common mistake is checking that the SWPPP is “prepared” when only a draft exists, which is a false certification carrying fine and imprisonment risk. The misconception worth correcting is that posting a URL satisfies the duty forever; you must keep that page current as site conditions change.
Section G. Endangered Species Protection
This section asks how your facility qualifies under the Endangered Species Act. Using Appendix E and its Criterion Selection Worksheet, you check the single most conservative criterion (A through E) that applies after you consider USFWS and NMFS listed species and critical habitat in your “action area.”
Most low-impact sites land on Criterion A (no listed species or critical habitat in the action area) and write a basis statement naming the federal sources used. Riverside Metals selects Criterion A, citing the USFWS IPaC report and the NMFS Species Directory, and attaches an aerial image to help EPA confirm. An important edge case: Criterion C(3) requires you to submit a Criterion C Eligibility Form to EPA at least 30 days before your NOI, which adds a month to your timeline.
The common mistake is using a state heritage database to support Criterion A; the permit says state resources are not acceptable, and that flaw can void eligibility. The misconception is that “no endangered species onsite” is enough; you must evaluate the broader action area where your discharges travel.
Section H. Historic Preservation
This section asks whether your stormwater controls could affect historic properties. You first say whether the facility sits on a property of religious or cultural significance to an Indian tribe, then, using Appendix F, check which historic-properties criterion (A through D) makes you eligible.
Most filers who are not building new ground-disturbing controls qualify under Criterion A. Green Valley Manufacturing, installing only above-ground containment, checks Criterion A. A nuance: if you plan subsurface controls like infiltration basins, you may fall to a criterion that requires consulting the State Historic Preservation Officer first.
The common mistake is ignoring this section because the building is new; the trigger is the ground disturbance from your stormwater controls, not the building’s age. The misconception is that historic preservation only applies to famous landmarks; it can include archaeological and tribal sites with no visible structure.
Section I. Certification Information
This is the signature section, and it carries the legal weight of the whole form. You enter the certifier’s First, Middle, Last Name, Title, Signature, Date, and E-mail, certifying under penalty of law that the information is true, accurate, and complete.
The signer must meet 40 CFR 122.22 authority, meaning a responsible corporate officer or a properly authorized representative. David Okafor, plant manager with delegated authority, signs and dates the form 05/12/2026. An edge case: on paper EPA wants an original ink signature, not a photocopy, while NeT uses a verified electronic signature through CDX.
The common mistake is letting a consultant or office staffer sign without delegated 122.22 authority, which makes the entire NOI invalid and the discharge unpermitted. The misconception is that signing is a formality; this certification can expose the signer personally to fines and even imprisonment for knowing false statements.
Three Filled-Out Examples Using Real Scenarios
These walkthroughs follow three common Massachusetts filers through the NOI. Each table shows what the named operator enters in the most important sections.
Scenario 1: Riverside Metals, a new scrap recycling yard in Boston (Sector N)
| Form Section | What Riverside Metals Enters |
|---|---|
| Section A (Paper waiver) | Leaves blank; files in NeT |
| Section B (Permit info) | Region 1 master permit number; YES new discharger |
| Section C (Operator) | Riverside Metals Inc., contact Maria Lopez |
| Section D (Facility) | 2.5 acres exposed; SIC 5093, Sector N |
| Section D (Location) | Lat 42.3601 N, Long 71.0589 W, WGS 84 |
| Section E (Receiving water) | Outfall 001 to Charles River, impaired for nutrients |
| Section F (SWPPP) | Option 2, lists scrap storage and metals pollutants |
| Section G (Species) | Criterion A, cites IPaC and NMFS Directory |
| Section I (Certify) | Maria Lopez, President, signed 05/01/2026 |
Scenario 2: Green Valley Manufacturing, an existing fabricator in Worcester (Sector AA)
| Form Section | What Green Valley Enters |
|---|---|
| Section B (Permit info) | NO new discharger; enters prior 2015 NPDES ID |
| Section C (Operator) | Green Valley Manufacturing LLC, preparer Sarah Lin |
| Section D (Facility) | 1.75 acres exposed; SIC 3499, Sector AA |
| Section D (Ownership) | Corporation; not on Indian country lands |
| Section E (Receiving water) | Outfall 001 to Blackstone River via MS4 |
| Section F (SWPPP) | Option 1, URL greenvalleymfg.com/swppp |
| Section G (Species) | Criterion A, USFWS IPaC basis statement |
| Section H (Historic) | Criterion A, above-ground controls only |
| Section I (Certify) | David Okafor, Plant Manager, signed 05/12/2026 |
Scenario 3: Bay State Transit, a bus maintenance depot in Springfield (Sector P)
| Form Section | What Bay State Transit Enters |
|---|---|
| Section B (Permit info) | YES new discharger; no pending enforcement |
| Section C (Operator) | Bay State Transit Authority, contact James Carter |
| Section D (Facility) | 3.0 acres exposed; SIC 4173, Sector P |
| Section D (Location) | Lat 42.1015 N, Long 72.5898 W, GPS, NAD 83 |
| Section E (Receiving water) | Outfall 001 and 002 to Connecticut River |
| Section E (Non-stormwater) | Confirms only authorized discharges |
| Section F (SWPPP) | Option 2, lists fueling and vehicle washing areas |
| Section G (Species) | Criterion A, IPaC and NMFS basis statement |
| Section I (Certify) | James Carter, Operations Director, signed 04/28/2026 |
How to File the Completed Form
The standard channel is electronic, through the NPDES eReporting Tool (NeT). You log in at EPA’s CDX portal, open the NeT MSGP service, complete each screen, and apply your verified electronic signature. There is no EPA filing fee for the MSGP NOI, no payment method is needed, and your coverage begins 30 calendar days after EPA posts your complete NOI, unless EPA notifies you otherwise. Your proof of filing is the NeT confirmation and the NPDES ID the system assigns, which you should save and store with your SWPPP.
The paper channel by mail is available only with an approved EPA Regional Office waiver. With a waiver, you mail the signed original Form 3510-6 (no photocopied signature) to the EPA Region 1 office; there is still no fee, and you should keep a certified-mail receipt and a copy of the signed form as proof. Processing follows the same 30-day clock, but paper adds handling time, so build in a buffer.
A separate state filing applies only for Outstanding Resource Waters. If your site discharges to or sits near an ORW, you must submit a WM15 application to MassDEP with a copy of your EPA NOI and a $500 fee (municipal projects are exempt), paid as MassDEP directs. Keep MassDEP’s receipt alongside your EPA confirmation so you can prove both filings if asked.
What Happens After You File
After you submit, EPA reviews the NOI for completeness and posts it. For most facilities, coverage is automatic 30 calendar days after a complete NOI is posted, and you receive an NPDES ID that becomes your permit tracking number. During that window, EPA, USFWS, or NMFS may contact you if your endangered species answers need additional controls.
Once covered, your real work begins under the permit. You must implement the control measures in your SWPPP, conduct routine and quarterly visual inspections, perform any benchmark or sector-specific monitoring tied to your SIC code, and file an Annual Report each year through NeT. Missing these ongoing duties is where many permitted facilities slip, and each lapse is a separate Clean Water Act violation.
If your facts change, the permit requires action. A new operator taking control must file a Change NOI within 30 calendar days, and you must update the NOI if your site becomes inactive or new materials become exposed. EPA can also request more information or, in rare cases, require you to apply for an individual permit instead.
Mistakes to Avoid When Filling Out the Form
Each error below is specific to this form, and each has a real consequence.
- Filing the NOI before the SWPPP exists; this is a false certification that can bring fines and even imprisonment.
- Picking a SIC code that does not match your primary activity; you end up following the wrong sector’s monitoring rules.
- Naming a storm drain as your receiving water; your monitoring and impaired-waters duties become wrong.
- Skipping the impaired-waters and TMDL fields; you can lose eligibility or face added effluent limits.
- Using a state database to support Criterion A; EPA rejects state resources and your species eligibility fails.
- Letting an unauthorized person sign Section I; the whole NOI is invalid and your discharge is unpermitted.
- Mailing paper without a waiver; EPA treats it as no submission and you stay unpermitted.
- Entering a parent company that does not control operations as the operator; the wrong entity becomes liable.
- Reporting the entire parcel as “area exposed” instead of the industrial footprint; this misstates your site and can trigger findings.
- Forgetting to disclose a pending enforcement action; the misstatement can void coverage.
- Missing the 30-day-before-discharge deadline; you discharge without coverage and accrue daily penalties.
- Ignoring the WM15 step near Outstanding Resource Waters; you skip a required MassDEP review and $500 fee.
Do’s and Don’ts
Do’s
- Do read the 2021 MSGP and confirm the current version before you start, because filing under an expired permit number can void coverage.
- Do prepare your SWPPP first, since the form certifies it already exists.
- Do use the USFWS IPaC tool for species, because EPA requires federal sources.
- Do save your NeT confirmation and NPDES ID, as they are your only proof of coverage.
- Do verify the signer’s 40 CFR 122.22 authority, because an invalid signature invalidates the filing.
- Do check whether you discharge near Outstanding Resource Waters, since that triggers the MassDEP WM15 step.
Don’ts
- Don’t guess your latitude and longitude, because a wrong location can misroute your coverage and monitoring.
- Don’t reuse an old SIC code from a prior permit without checking, since your activity may have changed sectors.
- Don’t mail a paper form without a waiver, because EPA will not count it.
- Don’t leave the pending-enforcement question blank, as silence reads as a misstatement.
- Don’t let coverage lapse between permit terms, because a gap means unpermitted discharge.
- Don’t forget the Annual Report, since each missed report is its own violation.
Pros and Cons of Filing on Your Own vs. With Help
Filing on your own (pro se)
- Pro: You save consultant fees, which matters for small operators with simple sites.
- Pro: You learn your permit obligations firsthand, which helps with ongoing compliance.
- Pro: You control your timeline and can file the moment your SWPPP is ready.
- Con: SIC code and receiving-water errors are easy to make and costly to fix.
- Con: You carry full personal certification risk if a field is wrong.
Filing with a consultant
- Pro: A consultant knows the sector rules and reduces rejection risk.
- Pro: They can build the NeT record as the preparer while your officer signs.
- Pro: They often manage your SWPPP, monitoring, and Annual Reports too.
- Con: Fees add up, especially for multi-outfall or impaired-water sites.
- Con: You still own the legal certification, so you must review their work.
MSGP NOI vs. MassDEP WM15
| Feature | MSGP NOI (EPA Form 3510-6) | MassDEP WM15 |
|---|---|---|
| Who receives it | EPA Region 1 via NeT | MassDEP Stormwater Program |
| When required | All MA industrial stormwater dischargers | Only near Outstanding Resource Waters |
| Fee | No fee | $500 (municipal projects exempt) |
| Filing method | Electronic in NeT (paper only with waiver) | Per MassDEP WM15 instructions |
FAQs
Do I have to file electronically in NeT?
Yes. Part 7.2 of the MSGP requires electronic filing through NeT unless the EPA Regional Office grants you a waiver based on broadband or computer-access limits.
Is there a fee to file the MSGP NOI with EPA?
No. EPA charges no fee for the MSGP NOI. A $500 fee applies only to a separate MassDEP WM15 filing near Outstanding Resource Waters.
Do I write my company’s trade name or legal name in Section C?
No. You enter the operator’s full legal name, the entity that controls operations, not a trade or “doing business as” name, or coverage may attach to the wrong party.
Do I list the city storm drain as my receiving water in Section E?
No. You list the first water of the United States that ultimately receives the discharge, plus the MS4 operator’s name if it flows through a municipal storm sewer.
Do I need my SWPPP finished before I file the NOI?
Yes. The permit requires the SWPPP to be prepared before you submit, and certifying otherwise is a false statement carrying fine and imprisonment risk.
Do I enter the whole property size in the “area exposed” box in Section D?
No. You report only the area of industrial activity that stormwater can reach, to the nearest quarter acre, not the entire parcel.
Do I use a state wildlife database for my endangered species basis in Section G?
No. EPA does not accept state resources; you must use the USFWS IPaC tool and the NMFS Species Directory to support your criterion.
Do I have to disclose a closed past enforcement action in Section B?
No. Section B asks only about pending enforcement actions, including open notices of violation or citizen-suit notices, not resolved matters.
Do new facilities have a filing deadline?
Yes. A new facility must submit the NOI at least 30 calendar days before it begins discharging stormwater associated with industrial activity.
Does submitting the NOI immediately authorize my discharge?
No. Coverage generally begins 30 calendar days after EPA posts your complete NOI, and discharging before then is unpermitted.
Can a consultant sign Section I for me?
No. Only a person with authority under 40 CFR 122.22 may certify, though a consultant can prepare the form and be listed as the NOI preparer.
Do I need a MassDEP filing on top of the EPA NOI?
No. Most industrial filers need only the EPA NOI. A MassDEP WM15 filing is required only when you discharge to or near Outstanding Resource Waters.
Do I keep proof after filing in NeT?
Yes. Save your NeT confirmation and the assigned NPDES ID, because they are your evidence of coverage if EPA or a citizen group questions it.
Related reading
- How to Fill Out Florida DEP NPDES Industrial Stormwater Permit + FAQs
- How to Fill Out the MassDEP / EPA NPDES Construction Stormwater Permit (With Examples) + FAQs
- How to Fill Out the MassDEP / EPA NPDES Industrial Stormwater Notice of Intent (With Examples) + FAQs
- How to Fill Out the Washington Ecology NPDES Industrial Stormwater Permit (NOI) + FAQs
- How to Fill Out the MassDEP NPDES Construction Stormwater Permit (With Examples) + FAQs
- How to Fill Out the NPDES Permit Application Form 2F (w/Examples) + FAQs
- How to Fill Out the Washington Ecology Water Quality Modification Permit + FAQs