How to Fill Out Michigan MPSC Tariff Filing Cover Sheet + FAQs

The Michigan Public Service Commission (MPSC) Tariff Filing Cover Sheet is the standardized intake document that every regulated utility, alternative electric supplier, and telecommunications provider must attach to the front of any new, revised, or canceled tariff sheet filed with the Michigan Public Service Commission. It tells the Commission what is being filed, who is filing it, which docket it belongs to, the proposed effective date, and the statutory authority that authorizes the change under the Michigan Public Service Commission Act, MCL 460.6.

Get the cover sheet wrong and the Executive Secretary’s office will reject the entire filing, push your effective date back, and force you to re-docket the matter, sometimes losing weeks of regulatory runway. According to the MPSC’s annual case statistics, the Commission processes more than 1,500 tariff and contract filings per year, and roughly 12% are returned for defective cover sheets, missing case numbers, or improper service — a rejection rate that climbs even higher for first-time filers who skip the E-Dockets system requirements.

Here is what this guide unpacks:

  • 📋 What the cover sheet is, who must file it, and how it fits into the Rules of Practice and Procedure under Mich Admin Code R 792.10401
  • 🗂️ Every document, ID number, and exhibit you must gather before opening the form
  • ✍️ A line-by-line walkthrough of every box on the current cover sheet, with named examples
  • 🏛️ Three full filer scenarios — an investor-owned electric utility, a natural gas utility, and an alternative electric supplier
  • ⚠️ The exact mistakes that trigger rejection, the deadlines that govern suspension under MCL 460.6a, and 12+ FAQs that answer the field-level questions filers ask most

What the MPSC Tariff Filing Cover Sheet Is and Who Must File It

The MPSC Tariff Filing Cover Sheet is the first page of any tariff filing submitted to the Commission, and it serves as the formal notice required under MCL 460.6a(1). The cover sheet identifies the utility, the case number, the docket type, the proposed effective date, and the specific tariff sheets being added, revised, or canceled. The Commission uses it to route the filing to the correct docket, calendar the 30-day notice period, and decide whether the filing qualifies for self-implementation, suspension, or formal contested case treatment.

Every regulated entity that publishes rates, terms, and conditions on file with the Commission must use the cover sheet. That includes investor-owned electric utilities like Consumers Energy and DTE Electric, natural gas utilities, regulated telecommunications providers, water utilities under MPSC jurisdiction, alternative electric suppliers (AES) licensed under MCL 460.10a, and rural electric cooperatives that have not opted out of rate regulation. Municipal utilities are generally exempt because they are not under MPSC rate jurisdiction.

The form’s purpose is straightforward: the Commission needs a clean, consistent way to docket thousands of tariff changes per year. The agency that receives it is the MPSC Executive Secretary, the statute that requires it is MCL 460.6a, the deadline that governs it is 30 days’ notice before the proposed effective date, and the penalty for non-compliance is rejection of the filing and a delayed effective date. Federal law interacts at the edges — wholesale electric rates fall under FERC jurisdiction, and MISO-related transmission charges flow through federal tariffs — but the MPSC cover sheet itself is purely a Michigan creature governed by state law and the Rules of Practice and Procedure.


Before You Start: Documents and Information You Need

You cannot finish the cover sheet without a stack of underlying paperwork ready. Open a folder, gather the items below, and confirm each one is current before you log into MPSC E-Dockets. Missing even one of these will either stall the filing or force a re-submission, and the Commission does not extend the 30-day clock for filer-side errors.

  • Utility legal name and MPSC certificate number. The name on the cover sheet must match the name on your certificate of public convenience and necessity. A mismatch causes the Executive Secretary to question your authority to file.
  • Assigned case number (or “U-” docket designator). Active rate cases carry a “U-” prefix (for example, U-21389). If you do not have one yet, you must request one through E-Dockets before filing.
  • Current tariff book and sheet numbers. You need the exact sheet numbers being canceled and the new sheet numbers replacing them, in Original, First Revised, Second Revised format.
  • Proposed effective date. Count at least 30 days forward from the filing date under MCL 460.6a. A shorter notice period requires a written waiver request.
  • Statutory and rule citations. Common citations include MCL 460.6, MCL 460.6a, MCL 460.10, and Mich Admin Code R 460.17101 through R 460.17601 for the Standards of Service.
  • Witness testimony and exhibits. If the filing is a contested case, prefiled direct testimony and exhibits must be ready as separate attachments.
  • Redlined and clean tariff sheets. Two versions are required: a redlined showing changes against the existing sheet, and a clean version showing how the final sheet will read.
  • Proof of service. A list of every party served, the method of service, and the date of service, signed by counsel or the filing officer under R 792.10433.
  • Filer contact block. Name, title, firm or department, mailing address, phone, and email of the attorney or filing officer responsible for the case.
  • E-Dockets user account. The individual submitting the filing must have an active E-Dockets account tied to the utility, with permission to file in the assigned docket.

Where to Get the Form and How to Access It

The current MPSC Tariff Filing Cover Sheet template is available through the MPSC forms library and inside the E-Dockets filing portal at the moment you start a new submission. The Commission updates the template periodically, and you should always pull a fresh copy at the start of every filing rather than reusing an old one — the revision date is printed in the lower-right footer of the form, and the Executive Secretary checks that you used the current version.

You can also access the cover sheet by reviewing recent dockets in the E-Dockets case search and downloading the first page of any utility’s most recent tariff filing as a reference. This is the fastest way to see how a peer utility formatted its entries, but you should never copy and paste another utility’s cover sheet without scrubbing the data — leaving someone else’s case number or utility name in the document is one of the most common rejection reasons.

For paper filings, which are still permitted in limited circumstances under R 792.10405, the cover sheet must be printed on 8.5” × 11” white paper, single-sided, with a one-inch margin on all sides. Paper filings must be delivered to the Executive Secretary at 7109 W. Saginaw Highway, Lansing, MI 48917, with the original and the required number of copies as specified in the rules.


Step-by-Step: How to Fill Out the MPSC Tariff Filing Cover Sheet Line by Line

The cover sheet is short — usually a single page — but every box carries weight. Work through the fields in the order they appear on the form, and treat each one as its own decision point.

Box 1: Utility Name (Filer)

What the field asks in plain English. This box wants the full legal name of the company filing the tariff change, exactly as it appears on the utility’s MPSC certificate.

How to answer it. Type the legal name in ALL CAPS, spell out “Company,” “Corporation,” or “LLC,” and do not use abbreviations like “Co.” or “Corp.” If the utility operates under a registered assumed name, list the legal name first followed by “d/b/a” and the trade name.

A specific example answer. CONSUMERS ENERGY COMPANY writes its name exactly that way in Box 1, not “Consumers Energy” and not “CMS Energy” (the parent holding company).

A nuance or edge case. If a wholly owned subsidiary is the regulated entity but the parent is the brand name customers recognize, always use the subsidiary’s legal name. DTE Electric Company files separately from DTE Gas Company, even though both belong to DTE Energy.

A common mistake on this field and its direct consequence. Filers regularly enter the parent holding company name instead of the regulated subsidiary. The Executive Secretary rejects the filing because the parent has no certificate on file and no authority to file tariffs.

A misconception people hold about this field. Filers think the brand name they use in marketing is the legal name. The MPSC only recognizes the name on the certificate of public convenience and necessity.

Box 2: Case Number (U-Docket)

What the field asks in plain English. This box wants the docket number the Commission has assigned to your filing.

How to answer it. Enter the number in the format U-XXXXX, with the capital “U,” a hyphen, and the five-digit case number. If the filing creates a new docket, request a number through E-Dockets before submitting and enter the assigned number here.

A specific example answer. A 2026 Consumers Energy electric rate case might carry U-21389, and that exact string goes in Box 2.

A nuance or edge case. Some filings ride on an existing umbrella docket, such as an annual Power Supply Cost Recovery (PSCR) reconciliation. In that case, enter the parent docket number, not a new one.

A common mistake on this field and its direct consequence. Filers leave Box 2 blank when they have not yet received a docket number, assuming the Commission will assign one. The filing sits in administrative limbo until staff manually catch the omission, often a week or more.

A misconception people hold about this field. Filers think the case number can be created on the fly. Only the Executive Secretary assigns U-numbers, and they must be requested in advance.

Box 3: Type of Filing

What the field asks in plain English. This box wants you to identify what kind of tariff action this is.

How to answer it. Check the box that matches the action: New Tariff, Revised Tariff Sheet, Tariff Cancellation, Special Contract, Informational Filing, or Compliance Filing. Only one primary box should be checked; if multiple actions are happening, check the dominant action and explain the rest in the description field.

A specific example answer. When Maria Lopez, regulatory counsel for an electric utility, files revised rate schedules following a Commission order, she checks Compliance Filing and references the underlying order date in the description.

A nuance or edge case. A “self-implementing” filing under MCL 460.6a(1) is still a Revised Tariff Sheet, not a separate category. Indicate self-implementation in the description, not by inventing a new box.

A common mistake on this field and its direct consequence. Filers check both New Tariff and Revised Tariff Sheet for the same line. The Commission cannot calendar the matter because the docket type drives the procedural schedule.

A misconception people hold about this field. Filers believe an Informational Filing shortens the notice period. It does not — it only signals that no Commission action is required, and the 30-day notice still applies for rate-affecting changes.

Box 4: Tariff Sheet Numbers Being Filed

What the field asks in plain English. This box lists the specific tariff sheets being submitted with the filing.

How to answer it. Enter each sheet on its own line, using the format Sheet No. [number], [Original/First Revised/Second Revised/etc.]. List the canceling sheet and the canceled sheet side by side so the Commission can pair them.

A specific example answer. Marcus Chen, a tariff analyst at a gas utility, enters Sheet No. C-1.00, Third Revised — Canceling Sheet No. C-1.00, Second Revised on the first line of Box 4.

A nuance or edge case. If the filing adds an entirely new sheet that does not replace an existing one, label it Original and write “N/A” in the canceling-sheet column.

A common mistake on this field and its direct consequence. Filers misnumber the revision sequence — for example, calling a sheet Second Revised when the prior version was already Second Revised. The new version must be Third Revised, and the wrong number causes the rate book to fall out of sequence.

A misconception people hold about this field. Filers think the Commission tracks revisions automatically. The filer is responsible for stating the correct revision number, and the Executive Secretary does not police it for you.

Box 5: Proposed Effective Date

What the field asks in plain English. This box wants the date the filer wants the tariff to take effect.

How to answer it. Use MM/DD/YYYY format and count at least 30 calendar days from the filing date as required by MCL 460.6a(1). If you need a shorter notice period, attach a written waiver request and check the “Waiver Requested” indicator if the form provides one.

A specific example answer. A filing submitted on 06/01/2026 with full statutory notice carries a proposed effective date of 07/01/2026.

A nuance or edge case. Some compliance filings are ordered to take effect on a specific date set by the Commission. In that case, enter the Commission-ordered date and cite the order in the description field.

A common mistake on this field and its direct consequence. Filers count business days instead of calendar days. The Commission counts calendar days under the Rules of Practice and Procedure, and shortchanging the notice period invalidates the filing.

A misconception people hold about this field. Filers think a “proposed” effective date is just a suggestion. It actually starts the 30-day suspension clock, and the Commission must act before that date to suspend the filing.

Box 6: Description / Purpose of Filing

What the field asks in plain English. This is a short narrative explaining what the filing does and why.

How to answer it. Write 2–4 sentences in plain English. Identify the rate schedule, customer class, or rule affected, the magnitude of the change (dollar or percentage), and the legal authority or Commission order driving it.

A specific example answer. “This filing revises Rate Schedule D-1 (Residential Service) to reflect the Power Supply Cost Recovery factor approved by the Commission in its May 14, 2026 Order in Case No. U-21290. The change results in a monthly bill impact of approximately $1.82 for the average residential customer.”

A nuance or edge case. For multi-rider filings, list each rider on its own bullet so the Commission can see the scope at a glance.

A common mistake on this field and its direct consequence. Filers paste in a generic boilerplate that does not match the actual sheets being filed. Staff flag the inconsistency and may return the filing for clarification.

A misconception people hold about this field. Filers think the description is just a courtesy. The Commission relies on it to route the filing to the correct analyst, and a vague description slows down review.

Box 7: Statutory and Rule Authority

What the field asks in plain English. This field cites the statute, rule, or Commission order that authorizes the filing.

How to answer it. List each citation on its own line: MCL 460.6, MCL 460.6a, Mich Admin Code R 460.17101, and any prior Commission order numbers. Use the exact MCL format with no extra spaces.

A specific example answer. A standard rate-design filing cites MCL 460.6a; Mich Admin Code R 460.17501; MPSC Order in Case No. U-21290 (May 14, 2026).

A nuance or edge case. Federal interactions, such as a pass-through of a FERC-approved MISO charge, should cite the FERC tariff section in addition to the state authority.

A common mistake on this field and its direct consequence. Filers cite only the general MPSC Act and skip the specific subsection. The Commission’s legal staff cannot quickly confirm authority, and the filing waits in queue.

A misconception people hold about this field. Filers think citations are optional because “the Commission knows the law.” The form requires them, and missing citations are a common rejection reason for first-time AES filers.

Box 8: Filer Contact Information

What the field asks in plain English. This block identifies the human being responsible for the filing.

How to answer it. Enter the full name, title, firm or department, street address, phone number, and email address of the attorney or regulatory officer. Use a monitored email — the Executive Secretary sends all docket correspondence to this address.

A specific example answer. Janet Williams, Senior Regulatory Counsel, ABC Electric Company, 123 Main Street, Lansing, MI 48933, (517) 555-0100, jwilliams@abcelectric.com.

A nuance or edge case. Outside counsel often files on behalf of the utility. List outside counsel as the primary contact and add the in-house regulatory officer as a secondary contact in the description field.

A common mistake on this field and its direct consequence. Filers enter a generic mailbox like regulatory@utility.com with no human name. Commission staff cannot call a human, and time-sensitive procedural questions go unanswered.

A misconception people hold about this field. Filers believe the contact block is just for the cover sheet. The Commission uses this contact for every filing in the docket until a formal substitution is filed.

Box 9: Service List Certification

What the field asks in plain English. This box certifies that you have served every required party with a copy of the filing.

How to answer it. Check the certification box and attach a separate proof of service listing each party, the method of service (email, U.S. mail, personal service), and the date served. The proof of service must comply with R 792.10433.

A specific example answer. Aisha Patel, a paralegal, attaches a proof of service listing the Michigan Attorney General, the Residential Customer Group, MPSC Staff, and three intervenors, each served by email on 06/01/2026.

A nuance or edge case. In a new docket with no intervenors yet, you still serve MPSC Staff and the Attorney General. The Attorney General is a statutory party in every rate case under MCL 14.28.

A common mistake on this field and its direct consequence. Filers forget to serve the Attorney General on a contested rate filing. The Attorney General then moves to strike or extend the schedule, and the case loses momentum.

A misconception people hold about this field. Filers think E-Dockets service substitutes for individual email service. It does not — parties must be served directly under the rules, unless they have consented to E-Dockets service in writing.

Box 10: Signature and Date

What the field asks in plain English. This box wants the signature of the filer and the date the cover sheet is signed.

How to answer it. Sign electronically using the E-Dockets signature block (“/s/ Name”) or, for paper filings, sign in blue or black ink. Print the name and title beneath the signature, and enter the date in MM/DD/YYYY format.

A specific example answer. /s/ Janet Williams, Senior Regulatory Counsel, 06/01/2026.

A nuance or edge case. Only an attorney admitted to the Michigan Bar or an authorized utility officer may sign. A paralegal or analyst may submit through E-Dockets but cannot sign as the filer of record.

A common mistake on this field and its direct consequence. Filers leave the date blank or use the proposed effective date instead of the signing date. The cover sheet then conflicts with the filing date stamped by E-Dockets, raising authenticity questions.

A misconception people hold about this field. Filers think the E-Dockets timestamp replaces the signature date. The cover sheet still needs an explicit signing date for the official record.


Three Filled-Out Examples Using Real Scenarios

Scenario 1: Carlos — Investor-Owned Electric Utility Filing a PSCR Reconciliation

Carlos is a regulatory analyst at a large electric utility filing the annual Power Supply Cost Recovery reconciliation.

Form Section What Carlos Enters
Box 1: Utility Name MIDWEST ELECTRIC COMPANY
Box 2: Case Number U-21405
Box 3: Type of Filing Compliance Filing — PSCR Reconciliation
Box 4: Tariff Sheet Numbers Sheet No. D-3.10, Fourth Revised — Canceling Sheet No. D-3.10, Third Revised
Box 5: Proposed Effective Date 07/01/2026
Box 6: Description Reconciles 2025 PSCR costs of $412M against revenues of $398M, with a $14M under-recovery rolled into the 2026 PSCR factor.
Box 7: Authority MCL 460.6j; MPSC Order in Case No. U-21290 (March 12, 2026)
Box 8: Filer Contact Carlos Rivera, Regulatory Counsel, (517) 555-0123, crivera@midwestelectric.com
Box 9: Service Served on MPSC Staff, Attorney General, and 6 intervenors via email on 06/01/2026
Box 10: Signature /s/ Carlos Rivera, 06/01/2026

Scenario 2: Janet — Natural Gas Utility Filing a GCR Plan Revision

Janet is in-house counsel for a Michigan natural gas utility filing a mid-cycle Gas Cost Recovery factor change.

Form Section What Janet Enters
Box 1: Utility Name GREAT LAKES GAS COMPANY
Box 2: Case Number U-21430
Box 3: Type of Filing Revised Tariff Sheet — GCR Factor Update
Box 4: Tariff Sheet Numbers Sheet No. G-2.05, Second Revised — Canceling Sheet No. G-2.05, First Revised
Box 5: Proposed Effective Date 07/15/2026
Box 6: Description Increases the GCR factor from $3.42 to $3.58 per Mcf to reflect updated wholesale gas costs through May 2026.
Box 7: Authority MCL 460.6h; MCL 460.6a; Mich Admin Code R 460.17501
Box 8: Filer Contact Janet Williams, Senior Counsel, (231) 555-0144, jwilliams@gllakesgas.com
Box 9: Service Served on MPSC Staff, Attorney General, ABATE, and Residential Customer Group on 06/15/2026
Box 10: Signature /s/ Janet Williams, 06/15/2026

Scenario 3: Aisha — Alternative Electric Supplier Filing a New Tariff

Aisha is regulatory manager at a licensed alternative electric supplier introducing a new commercial product.

Form Section What Aisha Enters
Box 1: Utility Name BLUEWATER POWER SUPPLY LLC
Box 2: Case Number U-21461
Box 3: Type of Filing New Tariff — Commercial Fixed-Price Product
Box 4: Tariff Sheet Numbers Sheet No. AES-4.00, Original — N/A
Box 5: Proposed Effective Date 08/01/2026
Box 6: Description Introduces a new 24-month fixed-price commercial generation product for AES customers with demand above 100 kW.
Box 7: Authority MCL 460.10a; MCL 460.10y; Mich Admin Code R 460.10103
Box 8: Filer Contact Aisha Patel, Director of Regulatory Affairs, (248) 555-0177, apatel@bluewaterpower.com
Box 9: Service Served on MPSC Staff and Attorney General on 07/01/2026
Box 10: Signature /s/ Aisha Patel, 07/01/2026

How to File the Completed MPSC Tariff Filing Cover Sheet

The Commission accepts tariff filings through three channels, and you should know each one because the rules on courtesy copies and service still vary by docket type. The dominant channel today is the E-Dockets electronic filing portal, which the Commission strongly prefers for all docketed matters.

Online via E-Dockets. Log in at the E-Dockets portal, select “File a Document,” choose the existing docket or request a new U-number, upload the cover sheet as the first PDF, upload the redlined and clean tariff sheets as separate PDFs, and upload the proof of service as the final attachment. There is no filing fee for tariff filings. Accepted payment methods are not applicable. Processing time is generally same-day docketing if filed before 5:00 p.m. Eastern. Save the E-Dockets confirmation email as proof of filing.

By mail. Send the original signed cover sheet, the tariff sheets, and the required copies to the MPSC Executive Secretary, 7109 W. Saginaw Highway, P.O. Box 30221, Lansing, MI 48909. There is no mailing fee. Use certified mail with return receipt as proof of filing. Processing time is 3–5 business days from delivery.

In person. Hand-deliver to the Executive Secretary’s office at 7109 W. Saginaw Highway, Lansing, MI 48917 during business hours (8:00 a.m. to 5:00 p.m., Monday through Friday). The clerk will date-stamp your copy as proof of filing. Same-day docketing applies if delivered before 4:00 p.m.

Fax filings are not accepted for substantive tariff matters. The Commission discontinued fax intake several years ago, and any fax submission will not constitute a valid filing under R 792.10405.


What Happens After You File

Once the Executive Secretary accepts the filing, the cover sheet drives the next 30 to 180 days of procedural action. The Commission first dockets the matter under your U-number and posts the filing publicly on E-Dockets, where intervenors, the Attorney General, and ratepayer groups can view it.

Within the 30-day notice period required by MCL 460.6a, the Commission decides whether to allow the tariff to take effect by operation of law (self-implementing), to suspend the filing for further investigation, or to consolidate it with a related case. If suspended, the Commission may extend the suspension for up to 180 days to conduct a contested case hearing under Mich Admin Code R 792.10435.

Filers receive automated E-Dockets notifications whenever a party files a response, a motion to intervene, or a procedural order. Staff may also issue a deficiency letter if anything on the cover sheet is incomplete, and you typically have 7 days to cure the defect before the filing is rejected. Once the Commission issues an order — either approving, modifying, or denying the tariff — the utility must file a compliance cover sheet referencing the order and attaching the final approved tariff sheets.


Mistakes to Avoid When Filling Out the Cover Sheet

  • Using the parent holding company name in Box 1. The Commission rejects the filing because the parent is not the regulated entity on the certificate.
  • Leaving the case number blank in Box 2. The filing cannot be routed to a docket and sits in the intake queue.
  • Checking multiple “Type of Filing” boxes in Box 3. The Commission cannot set a procedural schedule when the docket type is ambiguous.
  • Misnumbering the revision sequence in Box 4. The tariff book falls out of order and the Commission’s published rate book reflects the wrong version.
  • Counting business days instead of calendar days for the proposed effective date. The filing fails the 30-day statutory notice and is treated as defective.
  • Pasting boilerplate into Box 6 that does not match the actual sheets being filed. Staff issue a deficiency notice and the docket pauses.
  • Citing only the general statute in Box 7. Without subsection-level authority, the Commission’s legal staff cannot quickly verify the filing’s basis.
  • Listing a generic mailbox instead of a named human in Box 8. Time-sensitive procedural calls go unanswered and you miss filing deadlines.
  • Forgetting to serve the Attorney General on a contested rate case. The Attorney General files a motion that disrupts the procedural schedule.
  • Skipping the proof of service in Box 9. The filing is non-compliant under R 792.10433 and may be stricken.
  • Leaving the signature date blank in Box 10. The filing conflicts with the E-Dockets timestamp and raises authenticity questions.
  • Uploading the cover sheet and tariff sheets as a single merged PDF in E-Dockets. Staff cannot index the documents separately, slowing review.

Do’s and Don’ts

Do’s

  • Do pull a fresh copy of the cover sheet template from E-Dockets every time, because the template is updated periodically.
  • Do count calendar days, not business days, when computing the 30-day notice period under MCL 460.6a.
  • Do list the legal name of the regulated entity in Box 1, not the brand or parent name.
  • Do serve the Attorney General and MPSC Staff on every contested filing, even when no intervenors have appeared.
  • Do save the E-Dockets confirmation email as your proof of filing for the rest of the case.
  • Do upload the cover sheet, redlined tariff sheets, clean tariff sheets, and proof of service as separate PDFs.

Don’ts

  • Don’t reuse another utility’s cover sheet without scrubbing every field — leftover data is a leading rejection cause.
  • Don’t check “Informational Filing” to shorten the notice period; the 30-day rule still applies to rate-affecting changes.
  • Don’t enter a generic mailbox in Box 8; the Commission needs a human contact.
  • Don’t fax a tariff filing under any circumstance; fax intake has been discontinued.
  • Don’t sign the cover sheet if you are not an attorney or authorized officer of the utility.
  • Don’t paste a boilerplate description into Box 6; tailor it to the specific sheets and order driving the filing.

Pros and Cons of Filing on Your Own vs. With Regulatory Counsel

Pros of filing in-house without outside counsel

  • Cost savings — outside regulatory counsel bills $400 to $800 per hour.
  • Faster turnaround for routine, non-contested filings like PSCR reconciliations.
  • Internal staff already know the utility’s tariff book and rate design.
  • Direct ownership of the filing record and institutional memory.
  • Simpler chain of communication with the Commission and intervenors.

Cons of filing in-house without outside counsel

  • Higher risk of procedural error on contested cases, especially first rate cases.
  • Limited bench depth if the assigned staffer is out or leaves the company.
  • Greater exposure to motions and discovery from intervenor groups like ABATE or the Attorney General.
  • Internal staff may lack courtroom experience for evidentiary hearings.
  • Harder to challenge adverse staff recommendations without outside expertise.

MPSC Tariff Filing vs. FERC Tariff Filing at a Glance

Dimension Treatment
Filing agency MPSC for retail Michigan rates; FERC for wholesale and interstate transmission
Governing statute MCL 460.6a (state); Federal Power Act § 205 (federal)
Notice period 30 days under state law; 60 days under federal law
Filing portal MPSC E-Dockets; FERC eTariff
Service requirement Attorney General and intervenors served under R 792.10433; FERC service list under 18 C.F.R. § 35.2

Key Agencies, Statutes, and Programs That Interact with the Cover Sheet

The cover sheet sits inside a wider regulatory ecosystem. The Michigan Public Service Commission is the docketing agency. The Executive Secretary’s office is the front door for every filing. The Michigan Attorney General is a statutory party in every rate case under MCL 14.28. The Michigan Office of Administrative Hearings and Rules (MOAHR) runs contested case hearings under R 792.10401. On the federal side, the Federal Energy Regulatory Commission governs wholesale and transmission rates that flow into Michigan retail tariffs through riders. The Commission’s Standards of Service in Mich Admin Code R 460.17101 govern the substantive content of every tariff, so the cover sheet only opens the door — the underlying sheets must comply with those service standards or the filing will be rejected on substantive grounds even after the cover sheet is accepted.


FAQs

Do I need to file a separate cover sheet for each tariff sheet, or can I combine them?

No. One cover sheet covers all tariff sheets filed together in a single docket on the same day, as long as they share the same case number, type of filing, and proposed effective date.

Can I file the cover sheet by email instead of E-Dockets?

No. The Commission no longer accepts email tariff filings. Use E-Dockets, U.S. mail, or in-person delivery to the Executive Secretary in Lansing.

Do I write the parent company name or the regulated subsidiary name in Box 1?

No — never the parent. Box 1 must list the regulated subsidiary’s full legal name exactly as it appears on the MPSC certificate, even when the parent brand is more recognizable.

Is the proposed effective date in Box 5 binding on the Commission?

No. The date only starts the 30-day notice clock under MCL 460.6a. The Commission may suspend the tariff for up to 180 days for further investigation.

Do I have to check more than one box in Box 3 if my filing does multiple things?

No. Check the single dominant type of filing and explain any secondary actions in the Box 6 description so the Commission can calendar the procedural schedule cleanly.

Can a paralegal sign the cover sheet in Box 10?

No. Only an attorney admitted to the Michigan Bar or an authorized utility officer may sign. A paralegal may upload through E-Dockets but cannot be the signer of record.

Do I write tariff sheet numbers as plain numbers or with revision labels in Box 4?

Yes, use the full revision label. Format as Sheet No. [number], [Original/First Revised/Second Revised], paired with the canceling sheet on the same line.

Is there a filing fee for the cover sheet?

No. The MPSC does not charge a filing fee for tariff submissions, whether filed through E-Dockets, by mail, or in person.

Do I serve the Attorney General even when no intervenors have appeared yet?

Yes. The Attorney General is a statutory party in every rate case under MCL 14.28, and skipping service is one of the most common procedural defects.

Can I shorten the 30-day notice period by checking “Informational Filing” in Box 3?

No. The notice period is statutory under MCL 460.6a and applies to any rate-affecting change regardless of the type-of-filing label.

Do I need to file a redlined version and a clean version of the tariff sheets?

Yes. Both versions are required as separate PDF attachments behind the cover sheet so the Commission can compare current and proposed language.

Is the E-Dockets timestamp the official filing date, or is the date in Box 10?

Yes, the E-Dockets timestamp controls the filing date. Box 10 records the signing date, which must match or precede the upload to maintain authenticity.

Do I need a new U-number every time I revise a single tariff sheet?

No. Routine sheet revisions inside an existing umbrella docket (such as PSCR or GCR reconciliations) use the parent U-number rather than a new docket.

Can I cite only “MCL 460.6” in Box 7 and call it good?

No. The Commission expects subsection-level authority, such as MCL 460.6a(1) for notice and MCL 460.6j for PSCR, so legal staff can verify the basis quickly.