The Pennsylvania DEP NPDES Industrial Stormwater Permit is the state approval that lets a facility legally send stormwater that touches industrial activity into a stream, river, lake, or storm sewer. Most businesses get this approval by filing a Notice of Intent (NOI), Form 3800-PM-BCW0083b, for coverage under the PAG-03 General Permit, which the Pennsylvania Department of Environmental Protection (DEP) reissued with an effective date of March 24, 2023 and an expiration date of March 23, 2028. Confirm you are using the current version printed with that 2023 reissue date before you start.
When rain falls on a junkyard, a metal shop, or a fuel depot, it picks up oil, metals, and grit and carries them straight into the nearest creek. Filing the right form keeps that pollution in check and keeps your business out of enforcement trouble, since discharging without coverage can bring penalties under the Pennsylvania Clean Streams Law. Pennsylvania regulates thousands of these sites across six regional offices, and a single missed deadline or blank box can stall your coverage for months.
Here is what you will learn in this guide:
- 📋 Which facilities must file, and how your SIC code decides it
- 🗂️ Every document and data point to gather before you open the form
- ✍️ A line-by-line walkthrough of the PAG-03 NOI, field by field
- 🏭 Three full filing examples for real industries
- ⚠️ The mistakes that get NOIs rejected and how to dodge them
What the Form Is and Who Must File It
The PAG-03 NOI is your written request to discharge industrial stormwater under Pennsylvania’s general permit. It tells DEP who you are, where your site sits, what industry you run, where your stormwater goes, and what pollutants it carries. DEP’s Bureau of Clean Water, Division of NPDES Permitting reviews it and either grants coverage or asks for more information.
The legal backbone comes from two places. Federal rules at 40 CFR 122.26(b)(14) list eleven categories of industrial activity that need an NPDES permit. State authority comes from the Pennsylvania Clean Streams Law and the rules at 25 Pa. Code Chapter 92a, which let DEP require a permit for any discharge of pollutants to waters of the Commonwealth.
You must file if your facility’s primary Standard Industrial Classification (SIC) code or industrial activity appears in Table 1 of the PAG-03 NOI Instructions. Common examples include metal fabricators, landfills, scrap and recycling yards, transportation facilities with vehicle maintenance, lumber yards, chemical plants, and petroleum bulk stations. If only a secondary SIC code is listed and your primary code is not, you do not need to file unless DEP tells you pollutants are present.
There are two main alternatives to PAG-03. A facility that does not qualify for the general permit, often because it sits in a High Quality or Exceptional Value watershed under Chapter 93, must instead use the Individual NPDES Permit Application for Industrial Stormwater (3800-PM-BCW0403). A facility that keeps all industrial materials and activities indoors or under roof may skip permit coverage by filing a No Exposure Certification (NEC) instead.
Before You Start: Documents and Information You Need
Gather everything below before you open the NOI. Missing items are the top reason DEP returns an application as incomplete, and a returned application means you keep operating without coverage. Set aside an afternoon to pull these together.
- Your primary SIC code. This single code drives which PAG-03 appendix and which monitoring parameters apply to you; the wrong code routes your whole application to the wrong rules. Look it up with the OSHA SIC search tool.
- Facility legal name and physical address. DEP cross-checks this against tax and corporate records, and a mismatch slows review.
- Client and site IDs (if you have prior coverage). Existing permittees need their old permit or NEC number so DEP can link the renewal; leaving it off can create a duplicate file.
- Latitude and longitude of each outfall. DEP maps your discharge points, and missing coordinates make it impossible to confirm your receiving water.
- Name of the receiving water and its Chapter 93 designated use. This decides whether you even qualify for PAG-03, since HQ and EV waters are not eligible.
- A topographic map and a site/drainage map. These show structures, discharge points, and how water flows; without them DEP cannot picture your site.
- Two years of stormwater analytical (sampling) data. Existing facilities must report this for the parameters in their appendix; new facilities do not need it yet.
- Your Preparedness, Prevention, and Contingency (PPC) Plan. This spill-and-housekeeping plan is required and must be ready before discharge begins.
- MS4 notification proof, if you discharge to a storm sewer. You must show you told the municipal storm sewer operator.
- The filing fee and a payment method. DEP now requires online fee payment for most submissions.
Where to Get the Form and How to Access It
The official PAG-03 NOI package lives in DEP’s eLibrary under document number 3800-PM-BCW0083. You can pull every piece, the NOI form, the instructions, the sample permit, and each appendix, from the DEP eLibrary PAG-03 folder. Always download a fresh copy rather than reusing an old PDF, because the 2023 reissue added new Total Nitrogen and Total Phosphorus monitoring to every appendix.
The package is modular. You complete the NOI form itself (3800-PM-BCW0083b), then attach the General Information Form (GIF) if you are seeking new coverage, your maps, your PPC Plan, and your sampling data. Read the NOI Instructions alongside the form, since Table 1 in those instructions is where you confirm your SIC code triggers coverage.
You have two ways to reach the agency. Most filers now use DEP’s online Public Upload platform for NPDES permit applications, where you upload the package and pay the fee online. The traditional route is mailing a complete paper package to the DEP regional office that covers your county. Whichever channel you choose, keep an exact copy of everything you send.
Step-by-Step: How to Fill Out the PAG-03 NOI Line by Line
Work through the NOI in the order the form prints its sections. Use the exact box labels shown on the form, write in all capital letters where the form asks, and answer every field even when it feels obvious. The walkthrough below pairs each section with a named filer so you can see real entries.
Section A — Type of Application and Approval
This section asks whether you are a New or Existing facility and whether you want New, Renewal, or Amended approval. Check the box that matches your situation and, for a renewal, write your existing permit number in the space provided.
To answer it, mark Existing Facility if your site already operates, and New under Type of Approval if you have never held coverage. A brand-new site that has not yet been built marks New Facility. Marcus runs a metal shop that has operated for years without a permit, so he checks Existing Facility, leaves the permit number blank, and checks New for Type of Approval, exactly as DEP’s FAQ directs.
A common edge case trips up sites that have run for years but never had a permit. Per DEP guidance, you still select Existing Facility and New approval, not New Facility. The most common mistake here is checking New Facility for an operating site, which tells DEP no sampling data is needed and can later trigger an enforcement question about your unpermitted history. A frequent misconception is that New always means a new building; here it simply means new coverage.
Section B — Applicant and Facility Identification
This section asks for your legal applicant name, the facility name, the physical site address, the mailing address, and a contact person with phone and email. It is the backbone DEP uses to identify you.
Enter the applicant’s full legal name as it appears on corporate or tax filings, then the facility name and the street address where the activity happens. Janet, who manages a transit authority bus garage, writes the authority’s legal name as the applicant and the garage’s street address as the facility, not the headquarters address. Use a real street address, not just a P.O. Box, because DEP and inspectors must be able to find the site.
The edge case here is a mailing address that differs from the physical site, which is fine as long as you list both. The common mistake is entering a billing or headquarters address in the facility field, which sends inspectors to the wrong location and delays review. Many filers wrongly believe the mailing address can stand in for the physical address; it cannot, because the permit attaches to the land where industrial activity occurs.
Section C — Standard Industrial Classification (SIC) Code and Industrial Activity
This section asks for your primary SIC code, any secondary SIC codes, and a narrative description of the industrial activity at the site. It is the most important section because it decides which appendix governs you.
Determine your primary code by revenue: the activity that earns the most money sets the primary SIC code, looked up through the OSHA SIC search. Carlos runs a scrap recycling yard, so he enters 5093 as his primary code and writes a plain description of metal sorting and outdoor storage. List secondary codes too, since on-site auxiliary operations like a maintenance shop fall under secondary codes.
The edge case appears when several operators share one site, where each activity gets its own SIC code and the appendices apply outfall by outfall. The common mistake is choosing a code that matches a minor side activity instead of your revenue leader, which assigns the wrong monitoring parameters and produces a non-compliant permit. People often assume any related code will do, but DEP matches the code directly to Table 1, and the wrong code can mean you sampled for the wrong pollutants for two years.
Section D — Receiving Waters and Discharge Information
This section asks for the name of the surface water that receives your discharge, its Chapter 93 designated use, and the latitude and longitude of each outfall. It confirms whether PAG-03 is even available to you.
Name the stream or storm sewer your outfall reaches, then list its designated use from 25 Pa. Code Chapter 93. Aisha, who runs a lumber yard, finds her outfall flows to a Cold Water Fishes stream, records that use, and enters her outfall coordinates as 40.2732, -76.8867. If your stream carries an HQ or EV designation, stop, because you are not eligible for PAG-03 and must file an individual permit instead.
The edge case is a discharge to a municipal separate storm sewer system (MS4), which still requires coverage and proof you notified the MS4 operator. The common mistake is naming the wrong receiving water, which can hide an HQ or EV problem until DEP catches it and rejects the NOI. A widespread misconception is that discharging into a pipe or a dry basin avoids coverage; DEP requires coverage whenever a discharge is even possible during large storms.
Section E — Outfall and Stormwater Quality Data
This section asks you to list each outfall, the industrial activities draining to it, and two years of stormwater sampling results for the parameters in your appendix. New facilities skip the data; existing facilities must include it.
Group outfalls that drain substantially identical areas and pick a representative outfall, then attach the Maximum Daily concentration results for each required pollutant. Marcus reports two years of zinc, total suspended solids, oil and grease, pH, plus the new Total Nitrogen and Total Phosphorus values for his metal shop’s single outfall. A storm event for sampling means rain over 0.1 inch that follows at least 72 hours of dry weather.
The edge case is sheet flow with no pipe, where DEP may require you to install an inlet or use an approved sheet-flow sampling method. The common mistake is omitting the new nitrogen and phosphorus data added in the 2023 reissue, which makes the NOI incomplete on arrival. Many filers wrongly think they can average several samples into one value; DEP wants the maximum daily concentration, not an average.
Section F — Required Attachments and Certification
This section lists the attachments you must include, the General Information Form for new coverage, the Act 14 notice confirmation, and the signature block where an authorized official certifies the application is true.
Check off each attachment, attach the GIF (Form 0210-PM-PIO0001) for new coverage, confirm your Act 14 municipal and county notifications, and have a responsible official sign and date. Aisha’s company president signs the certification, because a clerk’s signature is not legally valid. Write the date as MM/DD/YYYY.
The edge case is NEC, where Act 14 notices are not required, unlike PAG-03 new coverage. The common mistake is signing without authority, which voids the certification and forces a resubmission. A frequent misconception is that the certification is a formality; in fact it carries legal liability for false statements, so the signer must verify every entry first.
Three Filled-Out Examples Using Real Scenarios
The tables below follow three filers through the core sections of the PAG-03 NOI so you can see what real entries look like.
Scenario 1 — Carlos, a scrap metal recycling yard seeking new coverage
| Form Section | What Carlos Enters |
|---|---|
| Type of Facility | Existing Facility (operating for years, no prior permit) |
| Type of Approval | New |
| Applicant Legal Name | CARLOS METALS RECYCLING LLC |
| Facility Address | 418 IRON ST, READING, PA 19601 |
| Primary SIC Code | 5093 (scrap and waste materials) |
| Industrial Activity | Outdoor sorting and storage of scrap metal |
| Receiving Water / Use | Schuylkill River — Warm Water Fishes |
| Outfall Coordinates | 40.3356, -75.9269 |
| Stormwater Data | Two years of zinc, TSS, oil & grease, pH, TN, TP |
| Signature | Owner signs certification, dated MM/DD/YYYY |
Scenario 2 — Janet, a transit authority bus maintenance garage renewing coverage
| Form Section | What Janet Enters |
|---|---|
| Type of Facility | Existing Facility |
| Type of Approval | Renewal |
| Existing Permit Number | PAR802345 |
| Applicant Legal Name | CAPITAL AREA TRANSIT AUTHORITY |
| Facility Address | 2nd & HANNA garage, HARRISBURG, PA 17104 |
| Primary SIC Code | 4111 (local transit, transportation) |
| Receiving Water / Use | Paxton Creek — Trout Stocked Fishery |
| Stormwater Data | Two years of oil & grease, TSS, pH, TN, TP |
| Attachments | Site map, PPC Plan, GIF not needed for renewal |
| Signature | Authority director signs, dated |
Scenario 3 — Aisha, a new lumber and wood products yard
| Form Section | What Aisha Enters |
|---|---|
| Type of Facility | New Facility |
| Type of Approval | New |
| Applicant Legal Name | KEYSTONE LUMBER CO |
| Facility Address | 9 MILL RD, WILLIAMSPORT, PA 17701 |
| Primary SIC Code | 2421 (sawmills and planing mills) |
| Receiving Water / Use | Lycoming Creek — Cold Water Fishes |
| Outfall Coordinates | 41.2412, -77.0011 |
| Stormwater Data | None required (new facility) |
| Attachments | Topo map, site map, PPC Plan, GIF |
| Signature | Company president signs, dated |
How to File the Completed Form
DEP gives you two filing channels, and the agency now steers most filers online. Pick one, then keep proof of what you sent.
Online (preferred). Upload your complete NOI package through DEP’s Public Upload platform for NPDES permit applications. The NOI filing fee must be paid online when a fee is required, and accepted methods include electronic payment through the portal. Processing commonly runs several weeks to a few months depending on completeness; save the upload confirmation as your proof of filing.
By mail. Send the full paper package to the DEP regional office that covers your county, addresses are listed on DEP’s regional offices page. Include a check for the filing fee if the office still accepts mailed fees, though DEP prefers online payment. Use certified mail with return receipt so you have dated proof of delivery, and keep a full copy of the package.
After filing, all permittees must report stormwater results through DEP’s electronic system. You register for and submit Discharge Monitoring Reports (DMRs) through the eDMR system, and reporting begins immediately on the effective date of your coverage.
What Happens After You File
DEP reviews your NOI for completeness first, then for technical eligibility. If anything is missing, the agency sends a deficiency or technical-deficiency letter, and your clock pauses until you respond. A clean, complete package moves much faster than one that triggers back-and-forth.
Once DEP approves coverage, you receive an authorization with an effective date, and your PAG-03 coverage runs through the permit’s expiration of March 23, 2028. From that effective date forward you must conduct semi-annual stormwater monitoring and submit each result through eDMR, with the first-half report due by July 28. If you had no qualifying storm event in a short first period, you may report a No Data Indicator code such as GG (Conditional Monitoring) instead of results.
Each year you must also submit an Annual Report and the annual fee. Under the reissued PAG-03, the Annual Report and NOI fee are tied to a March 23 due date, so mark it on your calendar to avoid a lapse in coverage.
Mistakes to Avoid When Filling Out the Form
Each error below has stalled real applications. The fix is almost always slowing down and checking the box against the official instructions.
- Choosing the wrong primary SIC code; this assigns the wrong appendix and the wrong monitoring parameters.
- Checking New Facility for a site that already operates; this misstates your history and can invite enforcement questions.
- Leaving off the new Total Nitrogen and Total Phosphorus data; this makes the NOI incomplete the moment it arrives.
- Naming the wrong receiving water; this can hide an HQ or EV problem that gets the NOI rejected.
- Filing PAG-03 when your stream is HQ or EV; you must file an individual permit instead.
- Skipping the PPC Plan attachment; DEP cannot confirm spill controls and returns the package.
- Reporting an averaged sample value; DEP requires the maximum daily concentration, not an average.
- Forgetting MS4 notification proof when you discharge to a storm sewer; this leaves a required step undone.
- Using a P.O. Box as the facility address; inspectors cannot find the site.
- Signing without legal authority; the certification is void and you must resubmit.
- Omitting the General Information Form on new coverage; the application is incomplete.
- Missing the annual fee or Annual Report due date; your coverage can lapse.
Do’s and Don’ts
These quick rules keep your filing on track.
Do: – Do download a fresh form copy, because the 2023 reissue changed monitoring requirements. – Do confirm your SIC code with the OSHA tool, since it drives your entire appendix. – Do check your receiving water’s Chapter 93 use first, because HQ and EV waters block PAG-03. – Do gather two years of sampling data early, since existing facilities cannot file without it. – Do keep certified proof of filing, so you can show timely submission. – Do calendar the March 23 annual deadline, to avoid a coverage lapse.
Don’t: – Don’t average your samples, because DEP wants the maximum daily value. – Don’t reuse an old NOI PDF, since outdated forms miss new parameters. – Don’t list a headquarters address as the facility site, because inspectors need the real location. – Don’t let an unauthorized person sign, since it voids the certification. – Don’t ignore non-industrial runoff that commingles with industrial runoff, because that combined flow needs coverage. – Don’t assume a dry basin avoids permitting, since any possible discharge triggers coverage.
Pros and Cons of Filing on Your Own vs. With Help
Many small operators file the NOI themselves, while larger or complex sites hire an environmental consultant. Weigh these factors before deciding.
Pros of filing on your own: – You save consultant fees, which matters for a small shop. – You learn your own permit, which helps with later monitoring. – You control the timeline directly, with no third-party scheduling. – You keep all site knowledge in-house, since you know your operations best. – You build a direct relationship with your regional office staff.
Cons of filing on your own: – You may pick the wrong SIC code, which derails the whole filing. – You may misread Chapter 93 eligibility, leading to a rejection. – You may struggle with sampling logistics, since storm-event timing is technical. – You bear full legal liability on the certification, with no expert check. – You may underestimate the time, which risks missing deadlines.
FAQs
Do I check “New” or “Existing” if my facility already operates but never had a permit?
Yes, select Existing Facility and leave the permit number blank, then choose New for Type of Approval, exactly as DEP’s FAQ instructs for operating sites without prior coverage.
Do I write my primary SIC code based on the activity that earns the most money?
Yes, your primary SIC code is set by the activity that generates the most on-site revenue, looked up through the OSHA SIC search system.
Do facilities in High Quality or Exceptional Value watersheds qualify for PAG-03?
No, discharges to HQ or EV waters under Chapter 93 are not authorized under PAG-03, so those facilities must apply for an individual NPDES permit instead.
Do I need to report Total Nitrogen and Total Phosphorus now?
Yes, the reissued 2023 PAG-03 added Total Nitrogen and Total Phosphorus monitoring to every appendix, so you must include them in your data and eDMR reports.
Do I list a P.O. Box as my facility address in the identification section?
No, the facility field needs the physical street address where industrial activity occurs, because DEP and inspectors must locate the actual site.
Do I report an average of my stormwater samples in the data section?
No, PAG-03 permittees report the Maximum Daily concentration for each pollutant, not an average, even if you collected several samples.
Do I need to file if my stormwater leaves as sheet flow with no pipe or outfall?
Yes, the Clean Streams Law does not distinguish point from non-point sources, so the lack of an outfall structure does not exempt you.
Do I need permit coverage if my stormwater drains to a basin that rarely discharges?
Yes, if any discharge is possible, even during large storms, coverage or NEC is required for a regulated industrial site.
Do I need an anti-degradation module for an HQ or EV discharge?
Yes, a new, increased, or first-time-permitted discharge to HQ or EV waters requires a completed Module 1 Anti-Degradation form with an individual permit application.
Do I need to notify the MS4 if I discharge to a municipal storm sewer?
Yes, all regulated facilities discharging to an MS4 or private storm sewer must apply for coverage or NEC and include evidence of MS4 notification.
Do new facilities need to submit two years of sampling data?
No, new facilities do not provide anticipated stormwater quality data, while existing facilities, including those without prior coverage, must submit it.
Do I need to renew my PAG-03 coverage by filing a new NOI?
Yes, renewal requires a timely and complete NOI, and you may keep discharging under the permit once that NOI is submitted.
Do I have to use eDMR to report my monitoring results?
Yes, DEP’s eDMR system must be used by all industrial stormwater permittees, and reporting starts on the effective date of your coverage.
Do I file Act 14 notices when applying for a No Exposure Certification?
No, Act 14 notices are not required for an NEC application or renewal, though they are required for new PAG-03 or individual permit coverage.
Related reading
- How to Fill Out Illinois IEPA NPDES Industrial Stormwater Permit + FAQs
- How to Fill Out the MassDEP / EPA NPDES Industrial Stormwater Notice of Intent (With Examples) + FAQs
- How to Fill Out the Pennsylvania DEP NPDES Construction Stormwater Permit (PAG-02, PAG-01 & Individual) + FAQs
- How to Fill Out the Pennsylvania DEP NPDES Industrial Stormwater Permit (PAG-03 NOI) + FAQs
- How to Fill Out the Pennsylvania DEP NPDES Construction Stormwater Permit (PAG-02 NOI) + FAQs
- How to Fill Out the NPDES Permit Application Form 2F (w/Examples) + FAQs
- How to Fill Out the Washington Ecology Water Quality Modification Permit + FAQs