How to Fill Out Pennsylvania DEP Oil and Gas Well Permit (w/Examples) + FAQs

The Pennsylvania DEP Oil and Gas Well Permit is the state license that every operator must get before drilling, deepening, or altering an oil or gas well, and it is reviewed by the Department of Environmental Protection’s Office of Oil and Gas Management. You file it on Form 8000-PM-OOGM0001a for a conventional well or Form 8000-PM-OOGM0001bU for an unconventional (shale) well, and a wrong or missing field can stall your project for weeks.

The stakes are real. Drilling without a valid permit is a violation of the 2012 Oil and Gas Act, and DEP can issue daily penalties and a cessation order. The agency has processed thousands of these applications and recently cut its permit backlog by 94%, which means a clean application now moves faster than ever, while a sloppy one falls to the back of the line.

Here is what you will learn in this guide:

  • 🛢️ How to fill out every box on the conventional and unconventional well permit forms, line by line.
  • 📋 Which attachments, plats, and bonds you must gather before you open the application.
  • 💰 The exact permit fees for 2026 and how acreage changes the unconventional fee.
  • 🗺️ How public resource and water supply setbacks under Section 3215 can block your location.
  • ✅ Three full walkthroughs, a do’s and don’ts list, common mistakes, and 12 FAQs.

What the Form Is and Who Must File It

The DEP well permit application is the legal request to drill and operate a new oil or gas well, or to alter an existing one, anywhere in Pennsylvania. The form is governed by 58 Pa.C.S. § 3211, which says no person may drill or alter a well without first getting a permit from the Department. The permit protects groundwater, public resources, and surface owners by forcing the operator to prove the well location and design meet the law before any ground is broken.

Two main forms exist because Pennsylvania splits wells into two classes. A conventional well taps shallow, traditional formations and uses Form 8000-PM-OOGM0001a. An unconventional well taps deep shale like the Marcellus or Utica through horizontal drilling and hydraulic fracturing, and uses Form 8000-PM-OOGM0001bU, which carries the extra “U” and the tougher Chapter 78a environmental standards.

Who must file? Any operator, company, or individual who wants to drill, deepen, drill deeper, or alter a regulated well must file. Plain-English meaning: if you are putting a new bore in the ground for oil or gas, this is your form. The consequence of skipping it is severe, because DEP treats unpermitted drilling as a per-day violation, and a real-world example is an operator who spuds a well early to beat winter and ends up paying fines plus a stop-work order. A common misconception is that a lease from the landowner is enough to drill; it is not, because the state permit is a separate, mandatory approval on top of any private lease.

Before You Start: Documents and Information You Need

Gather everything below before you open the application, because DEP will not process an incomplete package and the missing item is the most common reason an application is returned. Use the official Checklist Form 8000-PM-OOGM0001 as your master list while you collect these.

  • Operator’s General Information Form (8000-FM-OOGM0099). This registers your company with DEP, and without it the agency cannot tie the permit to a legal operator.
  • Operator Ownership and Control Information (8000-FM-OOGM0118). This discloses who owns and controls your company, which DEP checks against compliance history, so a gap here can flag your firm.
  • Well Location Plat (8000-PM-OOGM0002). This is the surveyed map of your well, and a missing or wrong plat means DEP cannot verify setbacks.
  • Erosion and Sediment Control (E&S) Plan (8000-FM-OOGM0111). This shows how you will control runoff, and without it your earth disturbance is illegal.
  • Bonding proof (1430-FM-BOS0085 or 1430-FM-BOS0151). This guarantees you will plug the well, and no bond means no permit.
  • Surface landowner and water purveyor notices (8000-FM-OOGM0052 and 8000-FM-OOGM0053). These prove you told nearby owners, and DEP rejects applications that skip notice.
  • Public resource coordination (8000-PM-OOGM0076 or 0076U). This is required when the well is near a park, school, or stream, and missing it triggers a hold.
  • The permit fee payment. Conventional and unconventional fees differ, and an underpayment voids the submission.
  • GPS coordinates and county/municipality data. DEP maps your well, so wrong coordinates can place it in the wrong setback zone.
  • Water Management Plan approval (8000-PM-OOGM0087U), for unconventional wells only. This shows your water sourcing is legal, and DEP will not approve a shale well without it.

Where to Get the Form and How to Access It

You download every form free from the DEP Oil and Gas forms page, which links to the DEP eLibrary versions of each PDF. The conventional application is Form 8000-PM-OOGM0001a and the unconventional application is Form 8000-PM-OOGM0001bU, and you should confirm the revision date printed in the corner of the form so you are not using an expired version.

Most operators no longer file on paper. DEP requires electronic submission through its GreenPort and electronic permitting portal, where you create an account, link it to your operator record, and upload the application with its attachments. The portal walks you through the well-class selection, then opens the matching form fields and attachment slots.

If you have never used the system, register your operator first with Form 8000-FM-OOGM0099 and the email registration Form 8000-FM-OOGM0153, because the portal will not let you start an application until your operator profile is active. Plain-English meaning: the website is the front door, but your operator account is the key. The consequence of skipping registration is a locked portal and a delayed filing. A real-world example is a new LLC that tries to file the night before a deadline and discovers its operator account is still pending. A common misconception is that you can mail everything; DEP now treats electronic filing as the standard channel for well permits.

Step-by-Step: How to Fill Out the DEP Well Permit Application Line by Line

The application is organized into sections that you complete in order. Below, each major section gets its own walkthrough. Use the exact field labels shown on the form, and remember that sample entries are shown in italics so you can tell them apart from instructions.

Section 1: Operator Information

This section asks who is applying for the permit. You enter the operator’s full legal name, the DEP-assigned operator ID number, the mailing address, and the contact person with phone and email. Type the operator name exactly as it appears on your Operator’s General Information Form, because DEP cross-checks this against your registered profile.

For example, Keystone Shale Energy LLC enters its operator ID OG-100482, its address 250 Drilling Way, Canonsburg, PA 15317, and its contact Dana Rivera, (724) 555-0148, drivera@keystoneshale.com. A nuance here is the difference between the operator and the agent; if a consultant files for you, the operator is still your company, not the consultant. A common mistake is entering a trade name instead of the registered legal name, and the direct consequence is a name mismatch that puts the application on hold. A misconception is that the operator ID is optional for new filers; it is not, because you must register and receive an ID before you can file at all.

Section 2: Well Identification and Type

This section asks what well you are permitting. You enter the well name and number, the well type (oil, gas, or combination), and whether the well is conventional or unconventional. You also state whether this is a new well, a deepening, or an alteration of an existing well.

For example, Marcus Tilden permits his shale well as Tilden Unit 2H, marks it Gas, checks Unconventional, and selects New Well. A nuance is the “H” suffix many operators add to horizontal wells; it is a naming convention, not a required DEP code, but keep it consistent across all your forms. A common mistake is checking Conventional on a shale well to dodge the higher fee and stricter rules, and the direct consequence is a falsified application that DEP can reject and refer for enforcement. A misconception is that altering an old well skips the permit; alteration still requires this application under Section 3211.

Section 3: Well Location

This section asks exactly where the well will sit. You enter the county, municipality, and the latitude and longitude of the surface hole in decimal degrees, plus the quadrangle name. These coordinates must match your Well Location Plat to the decimal.

For example, Keystone Shale Energy LLC enters Washington County, Mt. Pleasant Township, and 40.2731, -80.3042. A nuance is the bottom-hole location for horizontal wells, which can sit under a different parcel than the surface hole, so you report both. A common mistake is swapping latitude and longitude or dropping a negative sign on the longitude, and the direct consequence is a well plotted in the wrong place, which can trigger a false setback violation. A misconception is that “close enough” coordinates are fine; DEP’s mapping is precise, so small errors move your well across regulated boundaries.

Section 4: Setback and Distance Restrictions

This section asks you to confirm your well meets the distance rules in 58 Pa.C.S. § 3215. You report the distance from the well to buildings, water supplies, streams, wetlands, and floodplains. Unconventional wells must sit at least 500 feet from a building or water well, 1,000 feet from a public water supply, and 300 feet from a stream or wetland, measured from the well bore.

For example, Marcus Tilden lists his well as 612 feet from the nearest home and 340 feet from an unnamed tributary. A nuance is the variance path: if you cannot meet a setback, you file the Request for Variance Form 8000-PM-OOGM0058 with landowner consent or a waiver. A common mistake is measuring from the well pad edge instead of the well bore, and the direct consequence is an underreported distance that DEP catches on review. A misconception is that setbacks are fixed and never waivable; some can be waived with consent, but the public water supply and stream buffers are the hardest to move.

Section 5: Public Resource Coordination

This section asks whether your well is near a public resource such as a state park, school, playground, public water source, or species habitat. If yes, you must complete the Coordination of a Well Location with Public Resources Form 8000-PM-OOGM0076U for unconventional wells and notify the resource agency.

For example, Keystone Shale Energy LLC notes its well sits within 1,000 feet of a state game land, so it files the 0076U form and serves notice on the Pennsylvania Game Commission. A nuance is the 15-day comment window the public resource agency gets, which can add conditions to your permit. A common mistake is answering No when a school or park is just outside your eyeline, and the direct consequence is a permit appeal or revocation if the resource is later found. A misconception is that only parks count; public resources include water sources, scenic rivers, and rare-species habitat too.

Section 6: Erosion and Sediment Control and Earth Disturbance

This section asks how you will control soil erosion and stormwater during construction. You attach an E&S Plan (8000-FM-OOGM0111), and if your disturbance is five acres or more, you also need an Erosion and Sediment Control General Permit (ESCGP-4). You confirm the disturbed acreage and the receiving waters.

For example, Marcus Tilden reports 4.2 acres of disturbance draining to an unnamed tributary of Buffalo Creek and attaches his stamped E&S plan. A nuance is the special protection waters rule; if your runoff reaches a High Quality or Exceptional Value stream, you face tighter standards. A common mistake is underreporting acreage to avoid the ESCGP, and the direct consequence is an enforcement action for unpermitted earth disturbance. A misconception is that the E&S plan is just paperwork; DEP inspectors check it against the actual site, and a mismatch is a violation.

Section 7: Bonding

This section asks you to prove financial security to plug the well at the end of its life. You list the bond type and amount, using the Surety Bond Information Sheet 1430-FM-BOS0085 or the Collateral Bond 1430-FM-BOS0151. Bond amounts scale with well depth and the number of wells under a blanket bond.

For example, Keystone Shale Energy LLC posts a $10,000 individual surety bond tied to Tilden Unit 2H. A nuance is the blanket bond, which covers many wells under one instrument and is common for active operators. A common mistake is listing a bond that has lapsed or is in another operator’s name, and the direct consequence is a denied permit because the financial guarantee is invalid. A misconception is that the bond is a fee you lose; it is refundable security you get back when you properly plug the well.

Section 8: Fees and Acreage

This section asks for the permit fee, which differs by well class. For unconventional wells, the fee is built on a base plus an acreage component for the well’s footprint, so you report the total acres of the well site. You confirm the payment method through the portal.

For example, Marcus Tilden reports his unconventional well site as 3.5 acres and pays the calculated fee online. A nuance is that conventional wells pay a flat, lower fee, while unconventional wells pay more and also face the separate Act 13 impact fee later through the PUC. A common mistake is paying the conventional fee for an unconventional well, and the direct consequence is an underpayment that voids the filing date. A misconception is that the permit fee and the impact fee are the same; the permit fee goes to DEP up front, while the impact fee is an annual charge collected by the PUC after the well is spud.

Section 9: Required Notices and Affidavits

This section asks you to certify that you gave notice to surface landowners, coal owners, gas storage operators, and water purveyors within the required distance. You attach the Landowner Notification (8000-FM-OOGM0053) and the Surface Landowner-Water Purveyor Notification (8000-FM-OOGM0052), and if certified mail was refused, you file the Affidavit of Non-Delivery (8000-FM-OOGM0101b) for an unconventional well.

For example, Keystone Shale Energy LLC certifies it mailed notice to four adjoining landowners by certified mail on March 3, 2026. A nuance is the proof of mailing; DEP wants the certified mail receipts, not just your word. A common mistake is missing a landowner whose property touches the well tract, and the direct consequence is an invalid notice that a neighbor can use to appeal. A misconception is that an email or phone call counts as notice; the law requires certified mail to the listed parties.

Section 10: Operator Certification and Signature

This section asks the operator to sign under penalty of law that every answer is true and complete. You enter the name and title of the authorized official, the date, and the electronic signature in the portal. This signature binds your company to the application.

For example, Dana Rivera, Permitting Manager signs and dates the application 03/14/2026. A nuance is signing authority; the signer must be an officer or an agent with written authority, not just any employee. A common mistake is having an unauthorized person sign, and the direct consequence is an invalid application that DEP can reject. A misconception is that the signature is a formality; it is a sworn statement, and a false certification can lead to criminal liability under the Oil and Gas Act.

Three Filled-Out Examples Using Real Scenarios

Below are three common fact patterns, each followed through the form from start to finish. Sample entries are italicized.

Scenario A: Small Conventional Vertical Well Operator

Janet Coyle runs a family operation and is permitting one shallow gas well on her own land in Venango County.

Form Section What Janet Enters
Operator Name and ID Coyle Gas Company, OG-204815
Well Name and Number Coyle Farm 1
Well Type and Class Gas, Conventional, New Well
County and Municipality Venango County, Cranberry Township
Surface Coordinates 41.4023, -79.7211
Setback to Nearest Building altered, 215 feet with landowner consent
E&S Plan and Acreage 0.9 acres, attached plan
Bond $2,500 individual surety bond
Permit Fee conventional flat fee, paid online
Signature Janet Coyle, Owner, 04/02/2026

Scenario B: Unconventional Horizontal Marcellus Well Near a Stream

Keystone Shale Energy LLC is permitting a horizontal shale well close to a tributary in Washington County.

Form Section What Keystone Enters
Operator Name and ID Keystone Shale Energy LLC, OG-100482
Well Name and Number Tilden Unit 2H
Well Type and Class Gas, Unconventional, New Well
County and Municipality Washington County, Mt. Pleasant Township
Surface Coordinates 40.2731, -80.3042
Setback to Stream 340 feet to unnamed tributary
Public Resource within 1,000 ft of state game land, 0076U filed
E&S and ESCGP 4.2 acres, ESCGP-4 obtained
Bond $10,000 individual surety bond
Water Management Plan 8000-PM-OOGM0087U approved
Signature Dana Rivera, Permitting Manager, 03/14/2026

Scenario C: Well Requiring a Water Supply Setback Variance

Marcus Tilden wants to place a well closer to a private water well than the rule allows, so he seeks a variance.

Form Section What Marcus Enters
Operator Name and ID Tilden Resources Inc., OG-188790
Well Name and Number Tilden Home 3
Well Type and Class Gas, Unconventional, New Well
County and Municipality Greene County, Morris Township
Setback to Water Well 430 feet, below the 500-ft rule
Variance Request Form 8000-PM-OOGM0058 with owner consent
Landowner Consent signed waiver attached
E&S and Acreage 3.8 acres, plan attached
Bond $10,000 blanket bond
Signature Marcus Tilden, President, 05/06/2026

How to File the Completed Form

You file the well permit application through DEP’s electronic system, and you should keep proof of every submission. Below are the channels and what each requires.

  • Electronic filing (standard channel). Submit through the GreenPort electronic permitting portal at no extra portal charge beyond the permit fee, pay the fee by the portal’s accepted electronic methods, expect a confirmation receipt at submission, and save the confirmation number as your proof of filing.
  • By mail to the District Office. When DEP allows a paper package, mail it to the oil and gas district office that covers your county, include a check for the permit fee, expect a longer review because of manual data entry, and keep your certified mail receipt as proof of filing.
  • In person. You may hand-deliver to the district office during business hours, pay by check, get a date stamp on your copy, and keep that stamped copy as proof of filing.

Processing time has improved sharply. Pennsylvania reported it cut its permit backlog by 94%, so a complete electronic application now moves through technical review faster than a paper one, while any missing attachment resets your place in line.

What Happens After You File

After you submit, DEP runs a completeness check and then a technical review. The reviewer confirms your plat, setbacks, bond, E&S plan, and notices all line up, and if anything is missing, you get a deficiency letter that pauses the clock until you cure it. Plain-English meaning: the timer only runs while your package is complete.

If a public resource is involved, the resource agency gets its comment window and can recommend permit conditions. The consequence of ignoring those conditions is a permit that is appealed or revoked. A real-world example is a well near a state park that receives a lighting and noise condition before approval. A common misconception is that approval is permanent; a well permit expires if you do not begin drilling within the term printed on the permit, so you must spud or renew with the Affidavit Request for Renewal (8000-PM-OOGM0109b) in time.

Mistakes to Avoid When Filling Out the Form

  • Using the conventional form for a shale well, which causes a rejected, misclassified application.
  • Entering a trade name instead of the registered legal operator name, which triggers a name-mismatch hold.
  • Swapping latitude and longitude, which plots your well in the wrong location and fakes a setback issue.
  • Measuring setbacks from the pad edge rather than the well bore, which underreports your distances.
  • Answering No on public resources when a park or school is nearby, which can void the permit later.
  • Underreporting disturbed acreage to skip the ESCGP, which is an enforceable earth-disturbance violation.
  • Listing a lapsed or wrong-name bond, which makes your financial security invalid.
  • Paying the conventional fee for an unconventional well, which voids your filing date.
  • Skipping a landowner whose tract touches the well, which creates a fatal notice defect.
  • Letting an unauthorized employee sign, which makes the certification invalid.
  • Forgetting the Water Management Plan on a shale well, which blocks approval outright.
  • Filing the night before a deadline with an inactive operator account, which locks you out of the portal.

Do’s and Don’ts

Do:

  • Do register your operator and email before you start, because the portal needs an active profile.
  • Do match every coordinate on the application to the plat, because DEP compares them.
  • Do keep certified mail receipts, because they are your only proof of notice.
  • Do confirm the form’s revision date, because an old version can be rejected.
  • Do post the correct bond before filing, because no bond means no permit.
  • Do answer public resource questions honestly, because a hidden resource can revoke your permit.

Don’t:

  • Don’t misclassify a shale well as conventional, because it is a falsified filing.
  • Don’t measure setbacks from the wrong point, because DEP will catch the error.
  • Don’t underpay the fee, because it voids your filing date.
  • Don’t skip the E&S plan, because earth disturbance without it is illegal.
  • Don’t let the permit expire unspud, because you will have to reapply or renew.
  • Don’t assume a private lease replaces the state permit, because they are separate approvals.

Pros and Cons of Filing on Your Own vs. With Help

Filing Pro Se (On Your Own) Filing With a Consultant or Attorney
Pro: You save consultant fees, which matters for a single small well. Pro: A pro knows the setback and Chapter 78a rules, reducing rejections.
Pro: You control your own timeline and learn the portal. Pro: A surveyor and engineer produce a clean plat and E&S plan.
Pro: Simple conventional wells are manageable solo. Pro: They handle public resource coordination and variances smoothly.
Con: One wrong setback or fee can cost weeks of delay. Pro: They keep your bonding and notices airtight.
Con: Shale wells carry heavy attachments that are easy to miss. Con: Professional help adds cost to each well.

FAQs

Do I need a permit to alter an existing well?

Yes. Altering, deepening, or re-stimulating a well requires the same permit application under Section 3211, so you cannot rely on the original permit for new work.

Do conventional and unconventional wells use the same form?

No. Conventional wells use Form 8000-PM-OOGM0001a and unconventional wells use Form 8000-PM-OOGM0001bU, and choosing the wrong one causes rejection.

Do I write the operator’s trade name or legal name in the Operator section?

No. Enter the registered legal name exactly as it appears on your Operator’s General Information Form, because DEP cross-checks it against your profile.

Do I measure setbacks from the well pad or the well bore?

No. You measure from the well bore, not the pad edge, because measuring from the pad underreports the true distance and creates a violation.

Do I report both surface and bottom-hole coordinates for a horizontal well?

Yes. Horizontal wells can bottom out under a different parcel, so you report both the surface hole and the bottom-hole location.

Do I need a bond before DEP will approve the permit?

Yes. Financial security to plug the well is mandatory, and an application with no valid bond is denied.

Do I pay the Act 13 impact fee when I file the permit?

No. The DEP permit fee is paid up front, while the Act 13 impact fee is an annual charge collected later by the PUC after the well is spud.

Do I have to file electronically?

Yes. DEP treats the GreenPort electronic portal as the standard channel for well permits, so most operators must submit online.

Do I answer the public resource question if a school is just outside my view?

Yes. If any public resource sits within the regulated distance, you must answer yes and file the coordination form, or risk revocation.

Do I need a variance if my well is under the 500-foot building setback?

Yes. You file the Request for Variance Form 8000-PM-OOGM0058 with landowner consent, because you cannot ignore the distance rule.

Do I need a Water Management Plan for a conventional well?

No. The Water Management Plan approval applies to unconventional well development, so a typical conventional well does not need that specific approval.

Do I lose my permit if I do not drill in time?

Yes. A well permit expires if you do not begin drilling within its term, so you must spud or file the renewal affidavit before it lapses.