How to Fill Out Texas Railroad Commission Form W-3A (w/Examples) + FAQs

Texas Railroad Commission Form W-3A is the Notice of Intention to Plug and Abandon that every oil and gas operator must file and get approved before plugging a well in Texas. You send it to the Railroad Commission of Texas (RRC) Oil and Gas Division, and the agency must sign off on your plugging plan before a single sack of cement goes downhole.

This form is your plan, not your proof. The RRC reviews your wellbore facts and plugging proposal, then issues an approval with an expiration date. Plug a well without an approved W-3A and you risk a violation under Statewide Rule 14, plus a rejected Form W-3 Plugging Record later. Texas has well over 150,000 unplugged wells in its inventory and tracks thousands of plugging jobs each year, so the Commission reviews these notices closely.

Here is what you will learn in this guide:

  • 🛢️ What Form W-3A is, who must file it, and the law that requires it
  • 📋 The exact documents and well data to gather before you start
  • 🖥️ How to file online through RRC Online and by hardcopy in your district office
  • ✍️ A line-by-line walkthrough of all 23 numbered fields with real example entries
  • ⚠️ The field-level mistakes that get notices rejected and how to dodge them

What Form W-3A Is and Who Must File It

Form W-3A, Notice of Intention to Plug and Abandon, is the document an operator files to tell the Railroad Commission of Texas exactly how it plans to plug a well. The version most operators reference carries the revision line Rev 1/1/83 (02/00), printed in the corner of the official W-3A PDF. The notice lists the well’s construction, the usable-quality water it must protect, and the bridge and cement plugs the operator intends to set.

The person who must file is the operator of record for the well, meaning the entity shown as operator on its Form P-5 Organization Report. If you are a small independent operator plugging your own depleted well, you file it yourself. If you hire a plugging contractor, you still file the W-3A as the operator, because the legal duty to plug runs with the operator, not the cementer.

The agency that receives the form is the RRC Oil and Gas Division, and the specific district office for the county where the well sits handles review and approval. The statute behind it is Texas Natural Resources Code Chapter 89, carried out through Statewide Rule 14 in Title 16 of the Texas Administrative Code. Rule 14 sets the duty to plug a dry or inactive well and the plugging methods you must follow.

The consequence of skipping this step is direct. Rule 14 treats unplugged inactive wells as a hazard to fresh water and surface safety, so plugging without an approved notice can bring enforcement, penalties, and a refusal to approve your plugging record. A common misconception is that the W-3A is the plugging permit for the whole job; in truth it is only the intent and proposal, and you must follow it with a Form W-3 Plugging Record within 30 days after the work is done.

Before You Start: Documents and Information You Need

Gather your well records before you open the form, because the RRC cross-checks almost every entry against its own database. Missing one item can stall an entire plugging schedule. Here is your pre-filing checklist:

  • Active Form P-5 and P-5 number. Your operator name and address must match the P-5 exactly; a mismatch means the system cannot tie the filing to your account, and review stops.
  • Current GAU (Groundwater Advisory Unit) determination letter. This GW-2 / GAU letter names the usable-quality water you must protect; without it the district cannot confirm your water plugs are correct.
  • API number. The 14-digit API identifies the exact wellbore; a wrong digit pulls up the wrong well and the notice gets returned.
  • Drilling permit number and field name. These let the RRC match the well to its permit and field rules; the field name must match RRC records, not your lease slang.
  • Lease name, lease number, and well number. These pinpoint the well on the lease; the wrong number can approve plugging on the wrong hole.
  • Complete casing record. You need each string’s size, set depth, sacks of cement, top of cement, and hole size, because the RRC sizes your plugs against this construction.
  • Total depth and completion type. The agency checks that your bottom plug covers the productive interval; a wrong total depth invites a rejection.
  • Cementer’s name, address, and P-5 specialty code. Only a cementer with the proper Form P-5 specialty code may pump the plugs, so confirm this before you file.
  • Records of any prior plug-back or temporary abandonment. If the well was previously TA’d or had a CIBP set, you list those isolated intervals and may attach a Form W-15 Cementing Report.

If any item is missing, do not guess. A blank or wrong field is the single most common reason a district office returns a W-3A, and each return delays the expiration clock you are waiting on.

Where to Get the Form and How to Access It

The two ways to file are the RRC Online System (the strongly preferred channel) and a hardcopy paper form filed in the district office. You can download the blank paper form and find the digital filing from the Oil and Gas Forms library on the RRC website.

To file online, start at the RRC Online System login and select the RRC Online Application, then the Well Plugging Application. To reach it, your company’s RRC Online Security Administrator must first grant you the external well plugging filer right; without that permission the W-3A application will not appear in your menu. The Commission even publishes a short W-3A online filing video that walks through the screens.

The hardcopy route still exists for operators who cannot file online. You print the W-3A PDF, type or print your entries, and submit it to the district office for the county where the well sits. The form itself warns that operators must comply with the RRC plugging procedures printed on the reverse side, so read that back page before you write.

A nuance many first-timers miss: the online system pre-fills several fields from RRC records once you enter the API or permit number, which cuts down on mismatch errors. A common misconception is that the paper form is faster; in practice, online filings route to the right district instantly and auto-save a PDF of your submission, while mailed forms sit in a queue. When in doubt, file online.

Step-by-Step: How to Fill Out Form W-3A Line by Line

The W-3A has 23 numbered items plus a signature block and an RRC action box. Fill them in the order printed on the official form. Type or print only, and use the exact names and numbers the RRC has on file.

Item 1: Operator’s Name and Address

This box asks for your company’s legal operator name and mailing address. Enter it exactly as shown on Form P-5, Organization Report, including punctuation and entity type. For example, Lone Star Production Co., LLC, 410 W. Texas Ave., Midland, TX 79701 must read the same way it does on the P-5.

A nuance comes up after a name change or merger: if your P-5 still shows the old name, file the W-3A under the old name and update the P-5 separately, because the form must match the active organization record. The common mistake here is typing a “doing business as” name or a field nickname, which breaks the link to your operator account and gets the notice returned. The misconception is that close enough is fine; the RRC matches this field character by character against the P-5.

Item 2: Type of Well

Here you state what kind of well you are plugging by entering the correct number in the box. The choices are 1. oil, 2. gas, 3. disposal, 4. injection, and 5. other (specify). A depleted oil producer takes a 1, while a saltwater disposal well takes a 3.

The nuance is a well that served more than one purpose over its life; you classify it by its last permitted use, not its original completion. The common mistake is marking a former injection well as an oil well because it once produced, which misstates the plugging requirements for that zone. Many operators wrongly believe well type is cosmetic, but it drives whether the RLC expects extra plugs across disposal or injection intervals.

Item 3: RRC District No.

This field asks which RRC district the well sits in. Enter the district number for the county of the well site, such as 08 for Midland County or 03 for the Houston district. The district map and contacts confirm the right number.

The nuance is counties that fall in split districts like 7B, 7C, 5, or 6; check the official map rather than assuming. The common mistake is entering the district of your home office instead of the well, which routes the notice to the wrong reviewer and delays approval. People often think any nearby district will forward the form, but a wrong district usually means a return, not a hand-off.

Item 4: County of Well Site

This box asks for the Texas county where the well is physically located. Write the full county name, such as Reeves or Gregg, not an abbreviation. This must be the county of the wellhead, not your lease office.

The nuance is a lease that straddles a county line; the county of the surface location of this specific wellbore controls. The common mistake is using the county where the lease is recorded, which can mismatch the district in Item 3. A frequent misconception is that county is minor detail, but it determines jurisdiction for the entire plugging review.

Item 5: API No.

This field asks for the American Petroleum Institute number that uniquely identifies the wellbore. Texas API numbers begin with 42, which the form pre-prints, so you add the remaining digits, for example 42-329-30021. Copy it straight from your completion records or the RRC well query.

The nuance is older wells that may carry a shorter legacy number; enter what the RRC shows in its records. The common mistake is transposing two digits, which pulls up a different well and can approve plugging on the wrong hole. Many filers assume the lease number is enough, but the API is the true unique key the system relies on.

Item 6: Drilling Permit No.

Here you list the original drilling permit number issued for the well. Enter the number from the approved Form W-1 drilling permit, such as 812345. This ties the wellbore back to its original authorization.

The nuance is a re-entered or recompleted well that may have more than one permit; use the permit that matches this wellbore’s most recent work. The common mistake is leaving it blank because the well is decades old, which makes the RRC hunt for the record and slows review. The misconception is that the permit number no longer matters once a well is plugged, but it remains part of the well’s permanent file.

Item 7: Rule 37 Case No.

This box asks for any spacing-exception case number under Statewide Rule 37 that applies to the well. If your well was permitted with a Rule 37 exception, enter that case number, for example 0312345. If none applies, leave it blank.

The nuance is that many routine wells never had a Rule 37 exception, so a blank here is normal and correct. The common mistake is inventing a number or copying an unrelated case, which confuses the file. People wrongly assume every well has a Rule 37 case, but only wells granted spacing or density exceptions carry one.

Item 8: Oil Lease No. or Gas Well ID No.

This field asks for the lease number for an oil well or the Gas Well ID number for a gas well. Enter the RRC-assigned number, such as oil lease 00521* or a gas well ID for a gas completion. Match it to RRC records, not your internal accounting.

The nuance is that oil wells use a lease number while gas wells use a well ID, so use the one that fits the well type you marked in Item 2. The common mistake is swapping the two, which makes the notice impossible to match. A misconception is that the lease name alone identifies the well, but the number is what the database keys on.

Item 9: Well No.

Here you enter the specific well number on the lease. Write it exactly as the RRC carries it, such as Well No. 3 or 4H. This separates the target wellbore from others on the same lease.

The nuance is horizontal or sidetrack wells that use suffixes like H or ST; include the full designation. The common mistake is plugging the wrong well because the number was off by one, a costly error. Many believe the well number is interchangeable with the API, but both must be correct and consistent.

Item 10: Field Name

This box asks for the RRC field name for the completion. Enter it exactly as shown on RRC records, for example SPRABERRY (TREND AREA). Do not shorten or paraphrase the official field name.

The nuance is multi-zone wells that produced from more than one field; list the field tied to the deepest productive interval being plugged. The common mistake is using a casual field nickname, which fails to match RRC records and triggers a return. The misconception is that field name is just a label, but it controls which field rules govern the plugging review.

Item 11: Lease Name

This field asks for the name of the lease as recorded with the RRC. Enter it as it appears on agency records, such as SMITH “A”. Keep quotation marks and unit letters exactly as filed.

The nuance is a lease that changed names through assignment; use the name the RRC currently shows. The common mistake is using the surface owner’s name instead of the recorded lease name. People often think the lease name and lease number are redundant, but reviewers use both to confirm they have the right tract.

Item 12: Location

Here you describe the well’s surface location two ways: the survey description (Section, Block, Survey, and Abstract number) and the distance in miles and direction from a named nearby town in that county. For example, Section 14, Block 35, T-1-S, T&P RR Co. Survey, A-456; 7 miles SW of Coahoma. Both parts help the district locate the wellhead.

The nuance is unsurveyed or metes-and-bounds tracts; give the abstract number and the best survey tie available. The common mistake is naming a town in a different county, which conflicts with Item 4. The misconception is that GPS alone is enough, but the RRC still expects the legal survey description on this form.

Item 13: Type of Well (Completion Confirmation)

This area, paired with Items 14 and 15, confirms the well’s completion details. It restates the well type so the reviewer sees the construction context for your plugs. Enter the data consistent with your Item 2 classification.

The nuance is a converted well where completion type and current use differ; describe the current configuration. The common mistake is contradicting Item 2, which forces the reviewer to question the whole filing. The misconception is that repeating well type is busywork, but consistency across these boxes speeds approval.

Item 14: Type of Completion

This field asks whether the well is a Single or Multiple completion. Mark Single for one producing interval, or Multiple and then list the depth ranges if the well produced from more than one zone. For a typical depleted oil well, you mark Single.

The nuance is a commingled or dual completion; you check Multiple and state each interval’s depth, because each may need its own plug. The common mistake is marking Single when a second zone exists, which leaves a productive interval unplugged. People wrongly think only the deepest zone matters, but every productive zone must be isolated.

Item 15: Total Depth

Here you enter the well’s total measured depth in feet. Write the deepest depth reached, such as 8,450 feet. The RRC uses this to confirm your bottom plug sits within 100 feet of the deepest perforations, open hole, or kickoff point.

The nuance is plugged-back wells with a current depth shallower than the original TD; report both the original and the plug-back depth so the reviewer understands the wellbore. The common mistake is reporting a rounded or wrong depth, which can make your bottom plug appear out of place and draw a rejection. The misconception is that approximate depth is acceptable, but plug placement depends on this number.

Item 16: Usable-Quality Water Strata

This box asks for the depths where usable-quality water occurs, as determined by the state’s groundwater authority. Enter the depth ranges from your current GAU determination letter, for example usable-quality water occurs to 1,250 feet. These depths set where your water-protection plugs must go.

The nuance is multiple water zones; list each interval, top to bottom, exactly as the GAU letter states. The common mistake is using an old letter or guessing the depth, which can leave fresh water unprotected and invalidate the plan. A widely held misconception is that any groundwater number works, but only the current GAU determination is accepted, and a GW-2 marked for a non-plugging purpose will not do.

Item 17: Shallower Producing or Disposal Zones

This field asks you to state the depth of any nearby zone that is or was producing, or any shallower zone where salt water is or was disposed. If wells within the area draw from a shallower zone, you list that zone’s depth; the same goes for shallower disposal zones. For example, shallower producing zone at 4,200 feet.

The nuance is the Area of Review (AOR): the RRC recommends checking the RRC GIS Viewer for disposal, injection, or productive zones within a quarter mile shallower than your well, because each must be isolated by a cement plug. The common mistake is leaving this blank when a nearby disposal well exists, which omits a required plug and risks cross-flow. The misconception is that only your own well matters, but offsetting zones drive extra plug requirements.

Item 18: Casing Record

Here you list all casing in the well, string by string. For each string you give size, set depth, sacks of cement, top of cement, hole size, anticipated casing recovery in feet, and how the top of cement was determined (drilled, calculated, temperature survey, or cement bond log). For example, 9 5/8” surface casing set @ 1,300 ft w/ 400 sacks, top of cement at surface, determined by cement bond log.

The nuance is unknown cement tops on old wells; if cementing data is unknown or cement behind pipe is short, the RRC may require you to perforate and circulate cement, so note that. The common mistake is omitting a string or guessing recovery footage, which makes your plug plan unverifiable and draws a return. The misconception is that casing detail is optional background, but it is the backbone the reviewer uses to size every plug.

Item 19: Prior Notice of Intent

This box asks whether a notice of intent to plug was filed before for this well. Mark Yes or No. If the well was previously temporarily abandoned with a CIBP and cement that was never reported, you mark Yes and list the isolated intervals.

The nuance is attaching a Form W-15 when prior plug-back work exists, so the reviewer can credit those plugs. The common mistake is marking No when an earlier filing or TA exists, which can double-plan plugs or miss credit for existing ones. People wrongly assume a long-dormant prior filing no longer counts, but the RRC tracks the full plugging history.

Item 20: Plugging Proposal

This is the heart of the form: you list all bridge and cement plugs you intend to set, and you must load the hole with at least 9.5 pounds per gallon mud. For each plug, give the top and bottom depth and the number of sacks, for example cement plug from 1,200 to 1,350 ft, 50 sacks across the base of usable-quality water. Your plugs must cover the productive intervals, the surface casing shoe, the base of usable-quality water, and any zones named in the GAU letter.

The nuance is the required minimums: a bottom plug of a CIBP plus 20 feet of cement or a 100-foot plug plus 10% within 100 feet of perforations, plugs that straddle each zone at least 50 feet above and below, a 4-hour wait-on-cement and tag across the base of usable water, and a surface plug. The common mistake is forgetting the mud or under-sizing a plug, which fails the proposal outright. The misconception is that a few plugs always suffice, but the count depends on your casing record and the AOR.

Item 21: Record of Perforated Intervals or Open Hole

Here you list each set of perforations or open-hole interval, by top and bottom depth, whether it is open or plugged, the plugging method, and the number of sacks. For example, perforations 8,100 to 8,180 ft, open, to be plugged by squeeze, 75 sacks. This shows the reviewer every opening your plugs must cover.

The nuance is an open-hole completion or a screen/liner; if a liner cannot be removed, set at least a 100-foot plug plus 10% across its top. The common mistake is missing an old perforated interval, which leaves a flow path uncovered. The misconception is that only the deepest perforations matter, but each open interval needs isolation.

Item 22: Cementing Company or Contractor

This field asks for the name and address of the cementing company or contractor doing the work. Enter the firm’s legal name and address, such as Permian Plugging Services, 2200 Industrial Blvd., Odessa, TX 79761. The cementer must hold the proper Form P-5 specialty code to pump plugs.

The nuance is using your own crew; even self-plugging operators name who pumps the cement and must meet the approved-cementer requirement. The common mistake is naming a contractor without the specialty code, which voids the work. The misconception is that any service company can plug a well, but only an RRC-approved cementer may.

Item 23: Anticipated Plugging Date and Signature Block

Here you enter the date you expect to plug the well in Mo./Day/Yr. format, then complete the signature block: the typed or printed name of the operator’s representative, that person’s title, a telephone number with area code, the date, and a signature. For example, anticipated plugging date 09/15/2026, signed by J. R. Walker, Operations Manager, (432) 555-0142.

The nuance is the expiration date the RRC stamps in its action box after approval; you must plug within that window or refile. The common mistake is an unsigned or undated form, which is not a valid filing and gets returned. The misconception is that the anticipated date locks you in, but it is an estimate, while the RRC’s expiration date is the binding deadline.

Three Filled-Out Examples Using Real Scenarios

These three named scenarios show how different wells flow through the W-3A. Each table follows one operator through the key fields.

Scenario 1 — Maria, a small operator plugging a depleted oil well in Midland County:

Form Section What Maria Enters
Item 1: Operator’s Name Lone Star Production Co., LLC (exactly as on Form P-5)
Item 2: Type of Well 1 (oil)
Item 3: RRC District No. 08 (Midland)
Item 5: API No. 42-329-31045
Item 15: Total Depth 8,450 feet
Item 16: Usable-Quality Water to 1,250 feet (from current GAU letter)
Item 18: Casing Record 9 5/8” surface @ 1,300 ft, 400 sacks, TOC surface
Item 20: Plugging Proposal Bottom plug 8,350–8,450; base-of-water plug 1,150–1,300; surface plug; 9.5 lb/gal mud
Item 22: Cementer Permian Plugging Services, Odessa, TX

Scenario 2 — David, a gas operator with a GAU letter naming two water zones in Gregg County:

Form Section What David Enters
Item 1: Operator’s Name East Texas Gas Partners, LP
Item 2: Type of Well 2 (gas)
Item 3: RRC District No. 06 (Kilgore)
Item 8: Gas Well ID No. gas well ID from RRC records
Item 14: Type of Completion Single
Item 16: Usable-Quality Water to 400 feet; and 900 to 1,050 feet (both GAU zones)
Item 20: Plugging Proposal Plugs across each GAU water zone, productive interval, and surface plug; tag base-of-water plug after 4-hour WOC
Item 21: Perforations 6,200–6,260 ft, open, squeeze, 60 sacks

Scenario 3 — Carlos, plugging an old saltwater disposal well with a nearby shallower injector in Reeves County:

Form Section What Carlos Enters
Item 1: Operator’s Name Pecos Disposal Operating, Inc.
Item 2: Type of Well 3 (disposal)
Item 4: County of Well Site Reeves
Item 5: API No. 42-389-30077
Item 17: Shallower Zones shallower injection zone at 3,500 ft within ¼ mile
Item 18: Casing Record includes anticipated casing recovery 2,000 ft
Item 19: Prior Notice of Intent Yes (CIBP set during prior TA; W-15 attached)
Item 20: Plugging Proposal Cement plug isolating the shallower injection zone plus standard required plugs
Item 23: Anticipated Plugging Date 10/01/2026

How to File the Completed Form W-3A

You can file online or by hardcopy, and there is no filing fee for the W-3A notice itself. Choose the channel that fits your access.

  • RRC Online (preferred). Log in at the RRC Online System, open the Well Plugging Application, and complete the W-3A screens. You need the external well plugging filer right from your company’s Security Administrator. On submission, the system routes the notice to the correct district office and saves a PDF of your filing to the Files tab; keep that confirmation as your proof of filing. Review time varies by district and well complexity.
  • Hardcopy in the district office. Type or print the W-3A PDF and submit it to the district office for the well’s county, such as the Midland District 08 office at 10 Desta Dr., Suite 500 E, Midland, TX 79705, (432) 684-5581. Mail or deliver it, and keep a date-stamped copy as your proof.
  • Phone support. For casing and cementing questions before you file, call your district office; for example, District 03 Houston is (713) 869-5001.

Accepted payment methods are not an issue here because the notice carries no fee, though related plugging activity may involve other costs. The proof of filing you should keep is the system-generated PDF for online filings or a stamped duplicate for paper filings.

What Happens After You File

After you submit, the district office reviews your casing record, water strata, and plugging proposal against Statewide Rule 14. The reviewer checks that your plugs cover the productive intervals, the base of usable-quality water, the surface casing shoe, and any zones flagged in the AOR or the GAU letter.

If the notice is complete and the plan meets Rule 14, the district director approves it and stamps an expiration date in the RRC District Office Action box. You must complete plugging before that date, or the approval lapses and you refile. If the plan falls short, the office returns the form for correction, which restarts your timeline.

Once the well is actually plugged, the work is not done on paper. Under Rule 14(b)(1), the operator must complete and file a verified Form W-3 Plugging Record within 30 days after plugging operations finish. The W-3 reports what was actually pumped, and the RRC compares it to the W-3A proposal before closing the well’s file.

Mistakes to Avoid When Filling Out Form W-3A

Each error below has a direct consequence, usually a returned notice or a failed plugging job.

  • Operator name not matching Form P-5 — the filing cannot tie to your account and gets returned.
  • Wrong or transposed API number — the system pulls the wrong well and approval stalls.
  • Wrong RRC district in Item 3 — the notice routes to the wrong reviewer and is delayed.
  • Using an old or wrong GAU letter for Item 16 — fresh water depths are wrong and the plan is rejected.
  • Forgetting the 9.5 lb/gal mud in the plugging proposal — the proposal fails Rule 14 outright.
  • Omitting a casing string in Item 18 — the reviewer cannot verify plug placement and returns the form.
  • Under-sizing the bottom plug — it fails to cover the productive interval and is rejected.
  • Marking Single completion when zones are commingled — a productive zone is left unplugged.
  • Leaving Item 17 blank when a shallower disposal or injection zone exists — a required isolation plug is missed.
  • Naming a cementer without the proper P-5 specialty code — the work is not valid.
  • Plugging before approval — you violate Rule 14 and risk enforcement.
  • Letting the expiration date pass — your approval lapses and you must refile.
  • Failing to file Form W-3 within 30 days after plugging — the well’s file stays open and out of compliance.

Do’s and Don’ts

Do:

  • Do copy your operator name straight from Form P-5 so the filing matches your account.
  • Do pull a current GAU determination letter before entering water depths.
  • Do run an Area of Review in the RRC GIS Viewer to catch nearby zones needing plugs.
  • Do file online when you can, because it routes instantly and saves your proof.
  • Do confirm your cementer’s P-5 specialty code before naming them in Item 22.
  • Do plug within the stamped expiration date to keep your approval valid.

Don’t:

  • Don’t plug any well before the RRC approves the W-3A, because that breaks Rule 14.
  • Don’t guess casing or depth data, since the reviewer checks every number.
  • Don’t reuse an old GAU letter, as water depths may have changed.
  • Don’t skip the mud requirement, because the proposal will fail.
  • Don’t name a town in a different county in Item 12, which conflicts with your jurisdiction.
  • Don’t forget the follow-up Form W-3 within 30 days after plugging.

Pros and Cons of Filing on Your Own vs. With Help

Many small operators file the W-3A themselves, while others use a consultant or their plugging contractor. Here is the trade-off.

Pros of filing yourself:

  • You save consultant fees, which matters on a low-value stripper well.
  • You control the timeline and can file the moment your data is ready.
  • You learn your own well’s construction, which helps on future filings.
  • Online pre-fill reduces errors once you enter the API or permit number.
  • You keep direct contact with the district reviewer.

Cons of filing yourself:

  • A missed plug requirement under Rule 14 can get the notice rejected.
  • Reading the casing record and AOR correctly takes experience.
  • Mistakes restart your timeline and can delay a scheduled rig.
  • You bear full responsibility for compliance, including the follow-up W-3.
  • Complex wells with multiple zones or disposal history are easy to misjudge.

Form W-3A vs. Related RRC Plugging Forms

These forms work together across the life of a plugging job, and confusing them causes filing errors.

Form and Purpose When You Use It
W-3A — Notice of Intention to Plug and Abandon Filed and approved before plugging to propose your plug plan
W-3 — Plugging Record Filed within 30 days after plugging to report what was actually pumped
W-3X — Application for an Extension of Deadline to Plug an Inactive Well Filed to extend the deadline to plug an inactive well, not to propose plugs
W-15 — Cementing Report Attached when prior plug-back or temporary abandonment plugs must be documented

Frequently Asked Questions

Is Form W-3A the same as a plugging permit?

No. It is the notice of intention and your plugging proposal. The RRC must approve it before you plug, but the actual record of work is the separate Form W-3.

Do I have to file Form W-3A before I plug the well?

Yes. You must file and receive RRC approval before plugging. Plugging without an approved W-3A risks a Statewide Rule 14 violation and enforcement.

Is there a fee to file Form W-3A?

No. The notice itself carries no filing fee. Other plugging-related activities may have costs, but submitting the W-3A is free.

Can I file Form W-3A online?

Yes. File it through the RRC Online Well Plugging Application after your Security Administrator grants you the external well plugging filer right.

Do I write my operator name from Form P-5 or my DBA in Item 1?

No DBA. Use your operator name exactly as shown on Form P-5, because the RRC matches this field character by character to your account.

Do I enter the well-site county or my office county in Item 4?

Yes, the well-site county. Item 4 is the county where the wellbore physically sits, which also drives the district number in Item 3.

Do I list every casing string in Item 18 or just the production casing?

Yes, every string. Item 18 asks for all casing in the well, because the reviewer sizes each plug against the full construction record.

Do I need the 9.5 lb/gal mud noted in the plugging proposal?

Yes. Item 20 requires you to load the hole with at least 9.5 pounds per gallon mud, or the proposal fails Rule 14.

Is the anticipated plugging date in Item 23 a binding deadline?

No. It is your estimate. The binding deadline is the expiration date the RRC stamps in its action box after approval.

Do I still file Form W-3A if a contractor plugs the well?

Yes. The operator files the W-3A, because the legal duty to plug runs with the operator, not the cementing contractor.

Can any cementing company pump the plugs I list in Item 22?

No. The cementer must hold the proper Form P-5 specialty code as an approved cementer, or the plugging work is not valid.

Do I file Form W-3 after the W-3A is approved?

Yes. After plugging is done, you file the Form W-3 Plugging Record within 30 days, and the RRC compares it to your approved W-3A proposal.