The Pennsylvania DEP Air Quality Operating Permit is the document that lets a facility run its air-emitting sources after construction, and it is filed with the Pennsylvania Department of Environmental Protection Bureau of Air Quality. Every facility with sources that release regulated air pollutants above the action thresholds must hold one before normal operation begins. The two main types are the Title V Operating Permit (Form 2700-PM-BAQ0010) for major sources and the State-Only Operating Permit (Form 2700-PM-BAQ0013) for smaller synthetic minor and natural minor sources.
Getting this permit wrong is costly. Pennsylvania has thousands of permitted sources, and the annual Title V emission fee alone runs about $100 per ton of regulated pollutant, while a missed renewal can leave a facility operating without legal authority and exposed to enforcement. This guide walks you through both permit applications field by field, in plain language, so you can file once and file right.
- 📋 How to tell whether you need a Title V or a State-Only permit, and which form matches your facility.
- ✍️ Exactly what to enter in each section, from facility data to the emissions inventory to the signature block.
- 💵 Current fees, deadlines, and the 180-day renewal rule that keeps your permit alive.
- 🏭 Three full walkthroughs for real facilities, plus named examples for tricky fields.
- ⚠️ The top mistakes that trigger holds, returns, and enforcement, and how to dodge each one.
What the Form Is and Who Must File It
An Air Quality Operating Permit is the operating license for the air-emitting equipment at your facility. It is authorized under the Pennsylvania Air Pollution Control Act and carried out through 25 Pa. Code Chapter 127, with Subchapter F covering non-Title V (State-Only) permits and Subchapter G covering Title V permits. The permit sets the rules for how each source runs, including emission limits, monitoring, recordkeeping, and reporting.
You must file if your facility has sources that emit regulated air pollutants and you are not fully covered by a General Permit or an exemption. The size of your emissions decides the form. Title V applies to major sources, which generally have the potential to emit 100 tons per year of a regulated pollutant, 10 tons of a single hazardous air pollutant, or 25 tons of combined hazardous air pollutants. State-Only applies to synthetic minor sources, which accept limits to stay below major thresholds, and to natural minor sources, which fall below the thresholds on their own.
The agency that receives the form is the DEP Regional Office for your county, or the local program if you are in Allegheny or Philadelphia County. The Allegheny County Health Department and Philadelphia Air Management Services run their own air programs with their own fee schedules. The deadline that governs renewals is strict: a renewal application must arrive at least 180 days before the permit expires, and missing it can break your authority to operate.
Before You Start: Documents and Information You Need
Gather everything below before you open the form. A missing item is the single most common reason an application gets returned, and a returned application can push your project back by weeks.
- Facility name, address, and county. This sets the Regional Office and the local program. Without it, the form cannot be routed.
- Federal Tax ID (EIN) and DEP Client/Site ID. The agency links your filing to past records. A wrong ID can create a duplicate file and delay review.
- Plan approval numbers for each source. Operating permits build on the plan approval you received to construct. Missing numbers stall the emissions review.
- Source list and equipment data. You need make, model, rated capacity, and installation date for every emitting unit. Gaps here weaken the whole inventory.
- Emissions data and throughput records. Actual and potential emissions for each pollutant drive your permit type. Bad numbers can land you in the wrong permit class.
- Control device details. Scrubbers, baghouses, and oxidizers each have capture and destruction rates the form asks for. Missing data triggers a technical deficiency notice.
- Applicable requirements list. RACT, MACT, NSPS, and NESHAP citations that touch your sources. Leaving these out delays the compliance review.
- Compliance Review Form (2700-PM-AQ0004). DEP requires this with every application. Without it, the package is incomplete on day one.
- Proof of county and municipal notification. You must notify local government and prove it. No proof means no complete application.
- The correct fee payment. The wrong fee amount halts processing until corrected.
Where to Get the Form and How to Access It
All current forms live in the DEP eLibrary on the GreenPort website, where each form carries a 2700-PM-BAQ number and a revision date printed on the first page. Always confirm the revision date before you fill anything in, because DEP updates these forms and an old version can be rejected. Download the Title V application (2700-PM-BAQ0010) or the State-Only application (2700-PM-BAQ0013) in either Word or PDF format.
You can complete the form in two ways. The first is the fillable Word or PDF document you print, sign, and submit to your Regional Office. The second is electronic submission through DEP’s OnBase Electronic Forms Upload tool or, for certain General Permits, the ePermitting system on GreenPort. To use ePermitting you create a GreenPort account, then self-register through Application Enrollment on your dashboard.
Pick the channel that fits your facility. Large major sources usually file the full paper or OnBase package because of the volume of supporting documents. Small combustion units that qualify for a General Permit often move faster through the GP-5/GP-5A ePermitting system. When in doubt, contact your Regional Office before you start so you choose the right path the first time.
Step-by-Step: How to Fill Out the Operating Permit Application Line by Line
The application is organized into sections that move from general facility data to source-specific detail. Complete them in order, because later sections depend on the source list you build early. Use the exact field names printed on the form, and write sample entries the way they appear on the page.
Section 1: Application Type
This section asks what you are filing for, such as a new permit, a renewal, a modification, or a change of ownership. Check the one box that matches your situation, since the form routes and prices itself based on this choice. A renewing synthetic minor checks the box marked “Renewal.” If you are both renewing and changing ownership, ask your Regional Office which path to use, because the actions can be combined. The most common mistake is checking “New” for a facility that already holds a permit, which sends the file to the wrong review track and delays it. Many filers think a renewal restarts the whole review from scratch, but a renewal builds on your existing permit and is usually faster than a new application.
Section 2: Facility Identification
This field set asks for your facility name, physical address, county, municipality, and DEP Client and Site ID numbers. Enter the legal facility name exactly as it appears on your prior DEP records, in all capital letters, with the street address and not a P.O. Box for the physical location. ACME COATINGS LLC, 100 INDUSTRIAL DRIVE, READING, BERKS COUNTY is a correct entry. If your mailing address differs from the physical site, list the physical site here and put the mailing address in the contact section. A wrong county is a serious error because it sends your application to the wrong Regional Office and adds weeks of delay. Some filers believe the Client ID and Site ID are the same number, but the Client ID identifies the company while the Site ID identifies the location, and mixing them creates a record mismatch.
Section 3: Responsible Official and Contact Information
This section names the person legally accountable for the permit and the day-to-day contact. The responsible official must meet the definition in 25 Pa. Code Chapter 127, which for a corporation means a president, vice president, secretary, treasurer, or a person who performs similar policy or decision-making functions. Janet Cruz, Vice President of Operations is listed as the responsible official, with the plant’s environmental manager as the technical contact. If the official changes after filing, you must update DEP in writing, because the agency relies on this name for legal notices. The common mistake is naming a consultant or junior staffer as the responsible official, which makes the certification invalid. People often think any manager can sign, but only an official who fits the regulatory definition can certify a Title V permit.
Section 4: Source and Emission Unit Inventory
Here you list every air-emitting source at the facility with its identification number, description, capacity, and installation date. List each unit on its own line and tie it to its plan approval number so DEP can match construction to operation. Boiler No. 1, 25 MMBtu/hr natural gas, installed 06/2019, Plan Approval 06-05012 is one complete row. If a source was installed before permitting rules applied, note its grandfathered status rather than leaving the date blank. Forgetting a source is a major mistake, because an unpermitted unit found later can trigger enforcement and penalties. Many filers assume small or backup units do not count, but even emergency generators and small boilers usually must be listed.
Section 5: Emissions Inventory and Calculations
This is the technical heart of the form, where you report actual and potential emissions for each pollutant from each source. Show your math, including emission factors, throughput, and control efficiency, so a reviewer can follow how you reached each number. NOx: 2.1 tons/year actual, 8.4 tons/year potential, based on AP-42 factors and 5,000 hours of operation is a defensible entry. If you use stack test data instead of AP-42 factors, attach the test report and cite it. The most damaging mistake here is understating potential emissions to dodge Title V, which can void the permit and bring federal scrutiny. A frequent misconception is that “potential to emit” means actual output, but it means the maximum the source could emit running at full capacity without enforceable limits.
Section 6: Applicable Requirements and Compliance Status
This section lists every regulation that applies to each source, such as RACT, NSPS, NESHAP, and MACT standards, and states whether you currently comply. Match each requirement to the source it covers and give a clear compliance statement for each. Boiler No. 1 is subject to 40 CFR Part 60 Subpart Dc and is in compliance is a proper entry. If a source is not yet in compliance, you must attach a compliance schedule showing how and when you will get there. Leaving out an applicable requirement is a serious error, because the permit must capture all of them and omissions can reopen the permit. Many filers think state rules are enough, but federal Clean Air Act requirements under 40 CFR Part 70 also apply to Title V sources.
Section 7: Monitoring, Recordkeeping, and Reporting
This part describes how you will track compliance, including monitoring methods, record formats, and reporting frequency. Spell out what you measure, how often, and how you store the records, since DEP turns these into enforceable permit conditions. Pressure drop across the baghouse recorded daily; records kept on site for five years is a workable entry. For sources subject to Compliance Assurance Monitoring, you must address the CAM rule and propose monitoring for large control devices. A common mistake is proposing monitoring you cannot actually perform, which sets you up for violations later. Filers often believe monitoring is optional for small sources, but most permits require at least basic recordkeeping for every unit.
Section 8: Compliance Review Form
DEP requires the separate Compliance Review Form (2700-PM-AQ0004) with every operating permit application. This form discloses the applicant’s compliance history with environmental laws so DEP can judge fitness to hold a permit. List any past notices of violation, consent orders, or penalties for the company and its principals. If a related party has a compliance issue at another site, disclose it rather than hide it, because DEP checks its own records. The biggest mistake is leaving this form out entirely, which makes the whole package incomplete on arrival. People often assume only the current facility matters, but DEP can review the compliance history of affiliated companies and key individuals.
Section 9: Certification and Signature
The final section is the certification, where the responsible official swears the information is true, accurate, and complete. The responsible official must sign and date this block in ink for paper filings, or apply a verified electronic signature for online filings. Janet Cruz signs and dates the block 07/15/2026. If the official is out of the country, plan ahead, because a consultant cannot sign this certification in their place. The most serious mistake is letting an unauthorized person sign, which invalidates the certification and can void the submission. Many filers think a printed name is enough, but an actual signature from the qualifying responsible official is required for the permit to be valid.
Three Filled-Out Examples Using Real Scenarios
Below are three common facility types walking through the operating permit application. Each shows what the filer enters in the key sections.
Scenario 1: Maria runs a synthetic minor coating shop renewing a State-Only permit.
| Form Section | What Maria Enters |
|---|---|
| Application Type | Checks Renewal, State-Only (Subchapter F) |
| Facility Identification | ACME COATINGS LLC, READING, BERKS COUNTY |
| Responsible Official | Maria Lopez, President |
| Source Inventory | Two spray booths and one curing oven, with plan approval numbers |
| Emissions Inventory | VOC: 24 tons/year actual, capped below 50 by permit limit |
| Applicable Requirements | State VOC RACT and surface coating limits |
| Monitoring | Monthly coating usage logs kept on site |
| Fee Paid | $2,600 State-Only renewal fee |
Scenario 2: Marcus files a new Title V permit for a major manufacturing plant.
| Form Section | What Marcus Enters |
|---|---|
| Application Type | Checks New Application, Title V (Subchapter G) |
| Facility Identification | KEYSTONE METALS INC, JOHNSTOWN, CAMBRIA COUNTY |
| Responsible Official | Marcus Bell, Vice President of Operations |
| Source Inventory | Three boilers, a furnace, and a baghouse system |
| Emissions Inventory | NOx: 140 tons/year potential, above major threshold |
| Applicable Requirements | NSPS Subpart Dc, NESHAP, and CAM for the baghouse |
| Monitoring | Continuous emission monitoring on the main stack |
| Fee Paid | $6,300 Title V new application fee |
Scenario 3: Aisha applies under a General Permit for a small gas-fired boiler.
| Form Section | What Aisha Enters |
|---|---|
| Application Type | Checks General Permit BAQ-GPA/GP-1 |
| Facility Identification | RIVERSIDE LAUNDRY LLC, ERIE, ERIE COUNTY |
| Responsible Official | Aisha Khan, Owner |
| Source Inventory | One 8 MMBtu/hr natural gas boiler |
| Emissions Inventory | Low NOx and CO within GP-1 limits |
| Applicable Requirements | Conditions listed in the GP-1 general permit |
| Monitoring | Fuel records and tune-up logs |
| Filing Channel | GP ePermitting on GreenPort |
How to File the Completed Form
Pennsylvania accepts your operating permit application through more than one channel, and the right one depends on your permit type. Keep proof of whatever method you use.
- By mail or in person. Send the signed package to the DEP Regional Office that serves your county. Include the Compliance Review Form, proof of county and municipal notification, and a check for the correct fee. Keep a copy of the full package and the certified mail receipt as your proof of filing.
- Electronic upload. Submit through DEP’s OnBase Electronic Forms Upload tool. Save the confirmation screen and any tracking number the system gives you.
- ePermitting for General Permits. File GP-5 and GP-5A through the ePermitting system on GreenPort after creating an account and self-registering. The system date-stamps your submission as proof.
- Allegheny and Philadelphia counties. File with the Allegheny County Health Department or Philadelphia Air Management Services, which use their own forms and fees.
Current fees come from the Air Quality Fees Schedule (2700-PM-BAQ0030A-E). A new Title V application is $6,300 and a Title V renewal is $5,000, while a new State-Only permit under Subchapter F carries a smaller application fee with renewal at $2,600. Pay by check to the Regional Office, or use DEP’s Quick Pay system for annual fees. Processing a full Title V permit can take many months, so file early.
What Happens After You File
After DEP receives your application, it runs a completeness check first, then a technical review. If anything is missing, DEP issues a deficiency letter and pauses the clock until you respond. A complete Title V application also triggers a public comment period and a review by the U.S. EPA, which can object to the draft permit.
If you filed a timely and complete renewal at least 180 days before expiration, the application shield lets you keep operating under your existing permit while DEP finishes its review. This protection is one of the strongest reasons to never miss the 180-day mark. Once DEP approves the permit, you receive the final document with all conditions, and you must then meet every monitoring, recordkeeping, and reporting term inside it. Title V holders also owe an annual emission fee and an annual maintenance fee, which for 2026 through 2030 is $10,000 for Title V facilities, $5,000 for synthetic minors, and $2,500 for natural minors.
Mistakes to Avoid When Filling Out the Form
- Choosing the wrong permit type. Filing State-Only when you are a major source voids the permit and invites federal action.
- Understating potential to emit. Low-balling emissions to dodge Title V can reopen the permit and bring penalties.
- Forgetting a source. An unlisted emitting unit found during inspection can trigger enforcement and fines.
- Omitting the Compliance Review Form. Leaving out 2700-PM-AQ0004 makes the package incomplete on arrival.
- No proof of local notification. Without county and municipal notice proof, DEP cannot accept the application.
- Paying the wrong fee. An incorrect fee amount stops processing until you correct it.
- Wrong responsible official. A signature from someone who does not meet the definition invalidates the certification.
- Missing the 180-day renewal deadline. A late renewal can strip your authority to operate.
- Leaving out applicable requirements. Omitting a RACT, NSPS, or NESHAP rule can reopen the permit later.
- Using an outdated form version. An old revision can be rejected, costing you the resubmission time.
- Mismatched Client and Site IDs. Mixing the two creates a record error and delays routing.
- Skipping the compliance schedule. Reporting noncompliance without a schedule to fix it leaves the application incomplete.
Do’s and Don’ts
Do: – Do confirm the form revision date first, because an old version can be rejected outright. – Do calculate potential to emit honestly, since this number decides your permit type and your legal exposure. – Do list every source, because hidden units cause the worst enforcement problems. – Do file renewals 180 days early, so the application shield keeps you operating legally. – Do keep proof of filing, because you may need to prove the date you submitted. – Do contact your Regional Office with questions, since early guidance prevents costly resubmissions.
Don’t: – Don’t let a consultant sign the certification, because only a qualifying responsible official can certify it. – Don’t guess at emission factors, since unsupported numbers draw deficiency letters. – Don’t skip the Compliance Review Form, because it makes the package incomplete. – Don’t use a P.O. Box for the physical site, since DEP needs the real location for the county routing. – Don’t ignore federal requirements, because Title V sources must capture Clean Air Act rules too. – Don’t wait until the last week, since full Title V review can take many months.
Pros and Cons of Filing on Your Own vs. With Help
| Filing on Your Own | Filing With a Consultant |
|---|---|
| Saves consultant fees, helpful for small State-Only sources | Adds cost, but worth it for complex Title V plants |
| You learn your own facility’s emissions in detail | Brings expertise in emission calculations and applicability |
| Full control over timing and content | Reduces the risk of a deficiency letter or rejection |
| Works well for a simple General Permit boiler | Handles RACT, MACT, and CAM analysis you may not know |
| Direct contact with your Regional Office | Manages public comment and EPA review steps for you |
The right choice depends on facility size and complexity. A small natural minor source with one boiler can often self-file, while a major Title V plant with multiple control devices usually benefits from professional help to avoid expensive errors.
FAQs
Do I need a Title V permit or a State-Only permit? Yes if your facility is a major source with potential to emit at or above 100 tons per year of a regulated pollutant or major hazardous air pollutant thresholds, you need Title V; otherwise State-Only applies.
Do I have to file a renewal before my permit expires? Yes. You must submit a complete renewal application at least 180 days before expiration to keep operating under the application shield.
Do small backup generators need to be listed on the form? Yes. Even emergency generators and small boilers usually must appear in the source inventory, because unlisted units can trigger enforcement.
Do I write actual emissions or potential emissions in the inventory? Yes, you report both. Actual emissions show current output, while potential to emit shows the maximum at full capacity without limits and decides your permit class.
Do I list the company name or the location name in the facility field? Yes, you enter the legal facility name as it appears on prior DEP records, in all capital letters, with the physical site address.
Do I need to attach a Compliance Review Form? Yes. DEP requires Form 2700-PM-AQ0004 with every operating permit application, or the package is incomplete.
Do federal Clean Air Act rules apply to my Pennsylvania permit? Yes for Title V sources, which must capture applicable 40 CFR Part 70 and other federal requirements alongside state rules.
Do I put the Client ID and Site ID in the same box? No. The Client ID identifies your company and the Site ID identifies the location, so they go in separate fields.
Do I have to pay an annual fee after I get the permit? Yes. Title V facilities pay a $10,000 annual maintenance fee for 2026 through 2030 plus an annual emission fee, and minors pay lower maintenance fees.
Do I file in Allegheny or Philadelphia County with DEP? No. Those counties run their own air programs, so you file with the Allegheny County Health Department or Philadelphia Air Management Services.
Do I have to submit electronically? No. You may file on paper to your Regional Office or use the OnBase upload tool, though General Permits use the ePermitting system.
Do I need a plan approval before an operating permit? Yes, in most cases. You obtain a plan approval to construct or modify a source, then apply for the operating permit before normal operation begins.
Do I have to notify my county and municipality? Yes. You must notify local government and include proof of that notification, or DEP will treat the application as incomplete.
Do I have to sign the certification myself if I am the consultant? No. Only a responsible official who meets the 25 Pa. Code Chapter 127 definition can sign and certify the application.
Related reading
- How to Fill Out Florida DEP Air Operation Permit (w/Examples) + FAQs
- How to Fill Out the Pennsylvania DEP NPDES Construction Stormwater Permit (PAG-02, PAG-01 & Individual) + FAQs
- How to Fill Out the Pennsylvania DEP Solid Waste Permit Application (Form A, Form 20 & Form U) + FAQs
- How to Fill Out the Pennsylvania DEP Air Quality Operating Permit (Form 2700-PM-BAQ0013 & 2700-PM-BAQ0010) + FAQs
- How to Fill Out Pennsylvania DEP NPDES Industrial Stormwater Permit + FAQs
- How to Fill Out the Title V Air Operating Permit Application + FAQs
- How to Fill Out the Washington Ecology Water Quality Modification Permit + FAQs