How to Fill Out the Washington Ecology Underground Storage Tank 30-Day Notice + FAQs

The Washington 30-Day Notice (Form ECY 020-95, Revised May 2019) is the form every underground storage tank (UST) owner or operator files with the Washington State Department of Ecology before installing, permanently closing, or changing the service of a tank. You send it at least 30 days before any digging starts, and Ecology date-stamps it and mails it back so a state inspector can plan to watch your work.

This form is short, but a small slip can stall a fuel station for weeks or void your right to start a project. Ecology has tracked thousands of regulated tanks across the state, and the agency requires this advance notice on every install and closure so its inspectors can be present for the riskiest moments of the job. Get one box wrong, and the 30-day clock may never start.

Here is what you will learn in this guide:

  • 🛢️ What the 30-Day Notice does and exactly who must file it under Chapter 173-360A WAC.
  • 📋 The full list of documents and ID numbers to gather before you open the form.
  • ✍️ A line-by-line walkthrough of every box, from Tag/UBI number to the Tank Information grid.
  • 🧰 Three real filing scenarios for an install, a closure, and a change-in-service.
  • 🚫 The most common mistakes that delay or void a notice, and how to dodge each one.

What the Form Is and Who Must File It

The 30-Day Notice is Ecology’s advance-warning form for any project that disturbs a regulated underground storage tank or its piping. Under WAC 173-360A-0300, owners and operators must tell Ecology at least 30 days before they begin a UST install, a permanent closure (decommissioning), or a change-in-service. The form lets a regional Ecology inspector schedule a visit to observe the work, because installs and removals are the moments when leaks and spills are most likely to start.

The agency that receives the form is Ecology’s Underground Storage Tank Section, part of its Toxics Cleanup Program. The statutes that drive it are WAC 173-360A-0810 and WAC 173-360A-0820, which set the notice and project rules. The deadline that governs it is the 30-day waiting period, and the penalty for skipping it is steep: starting work without a validated notice is a regulatory violation that can bring enforcement action and block your facility compliance tag.

Who files it? The UST owner or operator is legally responsible, even when a hired contractor fills in the technical parts. A gas station owner, a fleet manager, a property owner, or a developer all count. The ICC-certified installer or decommissioner does the physical work and signs the certification section, but the owner’s name stays on the form as the party Ecology holds accountable.

Some tanks are exempt and need no notice at all. The form lists examples: farm or residential tanks of 1,100 gallons or less used for personal or farm motor fuel, tanks storing heating oil only for the building they sit under, tanks of 110 gallons or less, and emergency overflow tanks, catch basins, or sumps. If your tank fits one of these, you do not file. When in doubt, check the exemption list printed on the form before you assume you are exempt.

This Washington program runs alongside the federal EPA UST program under 40 CFR Part 280. Ecology runs a state-approved program, so the Washington form and rules are what you follow day to day, while the federal standards set the floor those rules must meet.

Before You Start: Documents and Information You Need

Gather everything below before you open the PDF. The form has no fee, but a missing number forces a refile, and each refile restarts your 30-day wait. Filers who walk in prepared often clear Ecology’s review in one pass.

  • Tag or UBI number. This is your Unified Business Identifier or facility compliance tag number; Ecology uses it to match the notice to your existing facility record, and a blank box on an active site can slow validation.
  • UST ID number. Ecology assigns this; for closures you copy it from your Business License, and a wrong ID can attach your project to the wrong tanks.
  • Site name and full site address. This is the physical location of the tanks, which the inspector uses to find the job; a mailing-only address sends the inspector to the wrong place.
  • Owner/operator legal name and business name. Ecology cross-checks these against its facility file, and a mismatch can stall the return of your stamped form.
  • Mailing address, phone, and email for the contact person. Ecology mails the validated form back here, so an error means you never receive your green light.
  • Certified service provider details. You need the company name, the certified person’s name, certification type, certification number, and expiration date, because uncertified work is not allowed under the rules.
  • Tank details for each tank. Capacity in gallons, substance stored, whether piping only, and the expected start date all go in the grid, and guesses here can misroute your project.
  • County name. A small box near the top, but Ecology routes the notice to the correct regional inspector by county, so a blank delays assignment.

Two more items help. Pull your local fire marshal and planning department contacts, because closures and installs often need city or county permits on top of this state notice. Also confirm your Pollution Liability Insurance is current, since you will need proof of it later to operate the new tanks.

Where to Get the Form and How to Access It

The official 30-Day Notice lives on Ecology’s publications page as Publication ECY 02095. The direct fillable PDF is the ECY 020-95 form, marked “Revised May 2019” in the bottom corner. Always confirm that revision date before you fill anything in, because an outdated copy can be rejected.

You can type directly into the PDF on a computer using free software like Adobe Acrobat Reader, then print it. You can also print it blank and write by hand in dark ink. The form is two pages: page one is the form itself, and page two holds the general instructions and the exemption list, so read page two first.

There is no online submission portal for this notice today. You complete the PDF, then send the paper to Ecology by mail or fax. Keep the page-two instructions handy while you work, since they spell out the 90-day project window and the closure site-assessment rule.

If you need the form in an accessible format for the visually impaired, you can call Ecology’s Toxics Cleanup Program at (360) 407-7170. People with hearing loss can use Washington Relay Service by dialing 711. Request the accessible version early, because waiting for it can eat into your project timeline.

Step-by-Step: How to Fill Out Form ECY 020-95 Line by Line

Work top to bottom. File a separate form for each project type, so an install and a closure at the same site need two forms. Below, each box gets its own walkthrough.

Top Header: UST ID # and County

What it asks in plain English. The top corner asks for your UST ID number and the county where the tanks sit.

How to answer it. Write your Ecology-assigned UST ID number if you have one, and spell out the full county name, such as King or Spokane. Leave UST ID blank only if Ecology has never issued one for a brand-new site.

Example. Carlos Rivera, opening a new station, writes the county Pierce and leaves UST ID blank because his site is new.

Nuance or edge case. For a closure, you almost always have a UST ID already, so copy it exactly from your Business License rather than guessing.

Common mistake and consequence. Leaving the county blank is a frequent slip, and it delays routing because Ecology assigns notices to regional inspectors by county.

Misconception. Some filers think the UST ID and the Tag/UBI number are the same; they are not, and mixing them can attach your notice to the wrong record.

Section I: Site Information

What it asks in plain English. This block asks where the tanks physically live and how Ecology can identify the facility.

How to answer it. Fill in the Tag or UBI # (if applicable), the UST ID # (if applicable), the Site Name, the Site Address, City, State, and Phone. Use the real street location of the tanks, not a billing address.

Example. Carlos enters Site Name Rivera Fuel Stop, Site Address 1420 Pacific Ave, City Tacoma, State WA, Phone (253) 555-0142.

Nuance or edge case. If the site has no street number yet because it is under construction, give the nearest cross-streets or parcel description in the Site Name area so the inspector can find it.

Common mistake and consequence. Filers often paste their corporate headquarters address here, which sends the inspector to the wrong city and burns days fixing it.

Misconception. Many believe the Tag or UBI box is optional for every filer; it is only optional if no tag or UBI exists yet, and active sites should always include it.

Section II: Owner/Operator Information

What it asks in plain English. This block names the legally responsible party and where Ecology mails the stamped form back.

How to answer it. Enter the Owner/Operator Name, Business Name, Mailing Address, City, Phone, and Email. Use the owner’s full legal name and the registered business name as they appear on state records.

Example. Carlos writes Owner/Operator Name Carlos Rivera, Business Name Rivera Fuel LLC, Mailing Address PO Box 88, City Tacoma, Email carlos@riverafuel.com.

Nuance or edge case. If the owner and operator are different people or companies, list the party who will receive mail and answer Ecology’s questions, since that contact must confirm the start date with the inspector.

Common mistake and consequence. A wrong or missing email and phone means Ecology cannot reach the contact, and the validated form may sit unreturned.

Misconception. People assume the contractor can list themselves as owner here; the owner/operator must appear, because the rules hold that party responsible, not the hired crew.

Section III: Certified Service Provider(s)

What it asks in plain English. This section names the certified pros doing the work and proves they are qualified.

How to answer it. Check Installer, Decommissioner, or Site Assessor as the role applies. Then enter Company Name, Certification Type, Service Provider Name, Cert. No., Exp. Date, Provider Phone, and Provider Email. If the job needs more than one provider, fill out both numbered blocks (1 and 2).

Example. For Carlos’s install, block 1 shows Installer checked, Company Name Cascade Tank Systems, Service Provider Name Dana Wu, Cert. No. ICC-44821, Exp. Date 08/15/2027.

Nuance or edge case. A closure that also needs a site assessment may require two providers, so use block 2 for the Site Assessor with that person’s own certification number and expiration date.

Common mistake and consequence. Listing a certification that has expired voids the qualification, because individuals performing UST services must be ICC-certified or hold another exam approved by Ecology, and uncertified work can trigger enforcement.

Misconception. Some think one company line covers everyone on site; each certified individual needs their own name and cert number, not just the company’s.

Project Type Checkboxes: Intent to Install, Intent to Close, Change-in-Service

What it asks in plain English. This row asks what kind of project you are giving notice for.

How to answer it. Check exactly one box: Intent to Install for a new tank or piping, Intent to Close for permanent removal or decommissioning, or Change-in-Service for switching the stored substance. File a separate form for each different project type.

Example. Carlos checks Intent to Install. Janet, removing an old tank, checks Intent to Close on her own form.

Nuance or edge case. A site doing both an install and a removal at once needs two forms, because each project type gets its own notice under the general instructions.

Common mistake and consequence. Checking two boxes on one form confuses the project record and forces Ecology to send it back, restarting your 30-day wait.

Misconception. Filers think switching from gasoline to diesel is just a paperwork edit; it is a Change-in-Service that needs its own notice before the swap.

Section IV: Tank and/or Piping Information

What it asks in plain English. This grid describes each tank or piping run in the project.

How to answer it. For each row, enter the TANK ID, TANK CAPACITY, SUBSTANCE STORED, whether it is PIPING INSTALLATION OR REPLACEMENT ONLY (Y/N), the DATE PROJECT IS EXPECTED TO BEGIN, and any COMMENTS. For installs, assign Tank ID numbers that have not been used before at the facility. For closures, use the Tank ID numbers listed on your Business License.

Example. Carlos enters TANK ID 001, TANK CAPACITY 10,000, SUBSTANCE STORED Gasoline, PIPING ONLY N, DATE EXPECTED TO BEGIN 07/15/2026.

Nuance or edge case. When only piping is being installed or replaced, mark Y in the piping-only column, since that triggers the Retrofit/Repair Checklist requirement instead of a full tank checklist.

Common mistake and consequence. Reusing an old Tank ID on a new install creates a duplicate in Ecology’s database, which scrambles your facility record and delays your compliance tag.

Misconception. People think the Comments box is throwaway; for closures it is where you note the date product was drawn down below one inch, which inspectors look for.

Three Filled-Out Examples Using Real Scenarios

Below are three named filers, each running a different project type through Form ECY 020-95.

Scenario 1: Carlos Installs a New Tank

Carlos Rivera is opening Rivera Fuel Stop in Tacoma and installing one new 10,000-gallon gasoline tank.

Form Section What Carlos Enters
County / UST ID # Pierce / left blank (new site)
Site Name Rivera Fuel Stop
Site Address 1420 Pacific Ave, Tacoma, WA
Owner/Operator Name Carlos Rivera
Business Name Rivera Fuel LLC
Section III Role Installer checked
Service Provider / Cert. No. Dana Wu / ICC-44821
Project Type Intent to Install
Tank ID / Capacity / Substance 001 / 10,000 / Gasoline
Piping Only (Y/N) / Begin Date N / 07/15/2026

Scenario 2: Janet Permanently Closes a Tank

Janet Cho owns a closed station in Spokane and is removing one old 8,000-gallon diesel tank for good.

Form Section What Janet Enters
County / UST ID # Spokane / 12345 (from Business License)
Site Name Cho Service Center
Site Address 905 Division St, Spokane, WA
Owner/Operator Name Janet Cho
Section III Role 1 Decommissioner checked
Section III Role 2 Site Assessor checked
Project Type Intent to Close
Tank ID / Capacity / Substance 003 / 8,000 / Diesel
Piping Only (Y/N) / Begin Date N / 08/01/2026
Comments Product drawn below 1 inch on 07/28/2026

Scenario 3: Marcus Files a Change-in-Service

Marcus Bell runs a fleet yard in Vancouver and wants to switch one 6,000-gallon tank from used oil to diesel.

Form Section What Marcus Enters
County / UST ID # Clark / 67890
Site Name Bell Fleet Yard
Site Address 200 Mill Plain Blvd, Vancouver, WA
Owner/Operator Name Marcus Bell
Business Name Bell Logistics Inc
Section III Role Installer checked
Service Provider / Cert. No. Priya Shah / ICC-50217
Project Type Change-in-Service
Tank ID / Capacity / Substance 002 / 6,000 / Diesel
Comments Converting from used oil to diesel

How to File the Completed Form

You can file the 30-Day Notice by mail or by fax; there is no online portal. Pick one channel, keep your proof, and wait for Ecology to return the stamped copy.

By mail. Send the completed form to the Department of Ecology, Underground Storage Tank Section, PO Box 47655, Olympia, WA 98504-7655. There is no fee for the notice itself. Use certified mail with return receipt so you have proof of the send date, and expect Ecology to date-stamp the form and mail it back to the owner/operator.

By fax. You can fax the notice to (360) 407-7154, per the state’s UST notification handbook. Keep the fax confirmation page as your proof of filing. Faxing can be faster than mail, but you still wait for the stamped return before any work begins.

The 30-day clock starts on the date Ecology stamps the form, not the day you mail it. Once returned, your project must begin within 90 days of that stamp date, and the notice stays valid for up to 60 days after the first 30 pass. If you cannot meet that window, you file a fresh 30-Day Notice.

You may request a waiver of the 30-day wait by contacting the regional Ecology UST inspector for the project’s county. The contact person on the form must also confirm the exact start date with that inspector at least three business days before work begins. Skipping that call can mean the inspector is not there to observe, which the rules require.

What Happens After You File

After Ecology receives your notice, it validates the form, date-stamps it, and mails a copy back to the owner/operator. For installs, that stamped form lets you take a one-time product drop for system testing only, which does not have to happen inside the 90-day window. For closures, Ecology stamps the date received and returns a copy so you can proceed.

Once a new tank holds more than one inch of product, leak detection and monitoring must already be in place. To receive regular deliveries and operate, you then submit the Business License Application, the UST Addendum, and the manufacturer’s installation checklists to the Department of Revenue within 30 days of finishing the install. That step triggers your Business License with tank endorsements and your Ecology facility compliance tag.

Closures carry their own follow-up. A site assessment is required at the time of closure, and if no contamination is found, you submit the site assessment report to Ecology within 30 days. If contamination is found or confirmed, you must report it to the regional Ecology office within 24 hours and file a site characterization report within 90 days. There is no appeal process for the notice itself.

Mistakes to Avoid When Filling Out the Form

  • Checking more than one project-type box; Ecology returns the form and your 30-day clock restarts.
  • Combining an install and a closure on one form; each project type needs its own notice, so the work cannot proceed.
  • Reusing an old Tank ID on a new install; it creates a duplicate record that delays your compliance tag.
  • Using the wrong Tank ID on a closure; the project attaches to the wrong tanks and confuses inspection.
  • Leaving the County box blank; Ecology cannot route the notice to the right regional inspector.
  • Listing an expired certification number in Section III; uncertified work is not allowed and risks enforcement.
  • Entering a mailing address as the site address; the inspector goes to the wrong location.
  • Forgetting the contact email or phone; Ecology cannot return the stamped form or reach you.
  • Filing for an exempt tank; you waste time on a notice that the rules never required.
  • Skipping the three-business-day start-date call to the inspector; the required observation may not happen.
  • Starting work before the 30-day stamp date without a waiver; this is a violation that can bring penalties.
  • Omitting the drawdown date in the Comments box on a closure; inspectors look for that one-inch confirmation.

Do’s and Don’ts

Do:

  • Read page two of the form first, because the instructions and exemption list there change how you fill page one.
  • File a separate form for each project type, since the rules demand it and mixing them causes rejection.
  • Confirm the May 2019 revision date, so you are not using an outdated copy that Ecology may refuse.
  • Use Tank IDs from your Business License for closures, because that keeps your facility record clean.
  • Call your local fire marshal and planning department early, since local permits often apply on top of this notice.
  • Keep your proof of filing, because the stamp date controls your entire 90-day project window.

Don’t:

  • Don’t start digging before the stamped 30-day date without a written waiver, because that is a violation.
  • Don’t list the contractor as the owner, since Ecology holds the owner/operator responsible.
  • Don’t guess at certification numbers, because an error can void the provider’s qualification.
  • Don’t leave applicable boxes blank, since incomplete forms get returned and reset your clock.
  • Don’t assume your tank is exempt, because only the specific categories on the form qualify.
  • Don’t skip the site assessment at closure, because the rules require it and contamination must be reported fast.

Pros and Cons of Filing on Your Own vs. With a Certified Contractor

Many owners let their certified installer or decommissioner handle the form, but you can file it yourself. Here is how the two paths compare.

Filing It Yourself Filing Through Your Contractor
Saves money, since you add no service markup for paperwork. Costs more, because the contractor builds form prep into the job.
Gives you direct control over every entry on the notice. Frees your time, as the pro completes the technical grid.
Risks errors, because the Tank ID and cert rules are easy to miss. Reduces errors, since the certified pro knows the fields well.
Forces you to learn the 90-day and waiver rules yourself. Leans on experience, as contractors track these deadlines daily.
Keeps you fully accountable for any mistake on the form. Still leaves you accountable, because the owner’s name stays on the form.
Slower if you are new, since first-timers often refile. Faster validation, because clean forms clear Ecology in one pass.

FAQs

Do I need to file a 30-Day Notice for a home heating oil tank?

No. Tanks storing heating oil used only to heat the building they sit under are exempt, so no notice is required for a typical residential heating oil tank.

Is there a fee to submit the 30-Day Notice?

No. Ecology charges nothing for the notice itself, though annual tank registration fees apply later and rise to $258.80 per tank on July 1, 2026.

Can I file the form online?

No. There is no online portal for this notice; you submit the completed PDF to Ecology by mail or by fax and wait for the stamped return.

Do I write the contractor’s name as the Owner/Operator in Section II?

No. Section II must show the owner or operator’s legal name, because Ecology holds that party responsible, not the hired contractor.

Do I assign a brand-new Tank ID for an install in Section IV?

Yes. For installs you assign Tank ID numbers that have never been used at the facility, which prevents duplicate records in Ecology’s database.

Do I use the same Tank ID for a closure as for an install?

No. For closures you copy the Tank ID numbers already listed on your Business License rather than creating new ones.

Can I check both Intent to Install and Intent to Close on one form?

No. Each project type needs its own separate form, so an install and a closure at the same site require two notices.

Do I leave the Cert. No. and Exp. Date blank if my installer is well known?

No. Section III still requires the certified person’s number and expiration date, because uncertified work is not allowed under the rules.

Can I start the project before the 30 days pass?

Yes. Only if a regional Ecology UST inspector waives the wait period; otherwise you must wait for the stamped 30-day date.

How long is my validated notice good for?

Yes. It controls a set window: projects must begin within 90 days of the stamp date, and the notice stays valid up to 60 days after the first 30.

Is a site assessment required when I close a tank?

Yes. A site assessment is required at closure, and the report goes to Ecology within 30 days if no contamination is found.

Do I have to call the inspector before work starts?

Yes. The contact person must confirm the exact start date with the regional UST inspector at least three business days before proceeding.

Is the County box at the top really necessary?

Yes. Ecology routes the notice to the correct regional inspector by county, so a blank County box delays your assignment.

Does the federal EPA program replace this Washington form?

No. Ecology runs a state-approved program, so you file this Washington form, while federal standards under 40 CFR Part 280 set the baseline the rules must meet.