The Washington Ecology Water Quality Modification Permit is filed using the Modification of Permit Coverage Form (ECY 070-361), the form a business uses to change its existing coverage under the Industrial Stormwater General Permit. You file it with the Washington State Department of Ecology when you add a new industrial process, add a new monitoring point, or ask to change a corrective-action deadline.
This form matters because stormwater that runs off your site carries oil, metals, and sediment into Washington’s rivers, lakes, and Puget Sound. If you change your operations and do not update your permit, Ecology can treat the discharge as unpermitted, which opens the door to penalties under the federal Clean Water Act of up to tens of thousands of dollars per day. Ecology processes thousands of stormwater permittees across the state, and a single missed public notice step is one of the most common reasons a modification request stalls.
Here is what you will learn in this guide:
- 📝 How to complete every box on Form ECY 070-361, line by line, using the exact labels printed on the current 11/2024 version.
- 🗺️ How to enter tricky fields like NAICS codes, discharge identifiers, and latitude/longitude without triggering a hold.
- 📰 How to run the two-week public notice and the 30-day comment period the right way.
- 📬 How to submit by email and hard-copy mail so Ecology accepts your request the first time.
- 🚫 The mistakes that get modification requests rejected and how to avoid each one.
What the Form Is and Who Must File It
Form ECY 070-361 is the Modification of Permit Coverage Form for the Industrial Stormwater General Permit (ISGP). The ISGP is a single, statewide permit that covers many sites with similar stormwater discharges, such as scrap yards, manufacturers, log yards, and recyclers. When your site already holds ISGP coverage and something about your operation changes, you do not apply for a brand-new permit. You file this modification form to tell Ecology what changed and to ask the agency to update your coverage.
You must file this form if you add a new industrial process to your site, because a new process can create new pollutants and new places where water leaves your property. You also file it when you add or change a monitoring point, change a receiving water body, or need to adjust a Level 2 or Level 3 corrective-action schedule. The legal backbone for the public-notice steps on this form is WAC 173-226-130, the state rule that governs how general permit coverage gets modified.
The agency that receives and decides on the form is Ecology’s Water Quality Program, Industrial Stormwater unit. The deadline that governs the form is tied to your public notice: you must submit the form on or before the date of your first public notice, and Ecology cannot grant the change until the 30-day comment period ends. The penalty for skipping the process is real, because operating a new process outside your permit terms can be treated as a Clean Water Act violation.
The current version is ECY 070-361 (11/2024), printed in the bottom corner of the form. Always confirm that date before you start, because Ecology updates forms and an old version can be returned to you.
Before You Start: Documents and Information You Need
Gather everything below before you open the form. Missing one item is the top reason a filer has to stop, hunt for a number, and restart. A clean packet moves through Ecology faster and avoids a back-and-forth that can add weeks.
- Your ISGP permit number (the WAR number). This is the number that starts with WAR on your existing coverage letter. Without it, Ecology cannot match your request to your file, and the form will likely be returned.
- The legal name of the operator and company. This must match the permit on file, because a name mismatch creates a hold while staff confirm who you are.
- A current mailing address, phone, and email. Ecology mails all permit correspondence to the address you list, so an old address means you miss key notices.
- The NAICS codes for any new industrial process. These six-digit codes describe your activity, and Ecology uses them to decide what the new process means for your discharge.
- A plain description of the new industrial activity. You need a short, honest summary of what the new process is and does.
- Monitoring point details: identifier, latitude, longitude, and location description. If you add a discharge point, you need its coordinates and a label, because Ecology maps where your water leaves the site.
- The name of a newspaper of general circulation in your county. You must publish your notice here, so confirm the paper and its publication schedule first.
- The technical basis for any deadline extension or waiver. If you ask to move a Level 2 or Level 3 deadline, you need a written timeline and the reasons, or Ecology has nothing to approve.
- The name and title of an authorized signer. Federal rules limit who can sign, so confirm your signer qualifies before you finish.
Where to Get the Form and How to Access It
You get the official form directly from Ecology so you know you have the current version. Download the Modification of Permit Coverage Form (ECY 070-361) as a PDF from Ecology’s publications library. The PDF is fillable, so you can type your answers on a computer, which is cleaner and easier to read than handwriting.
You can also reach the form through the main Industrial Stormwater permit page, which links the form along with permit guidance and your regional permit administrator’s contact details. If you prefer to talk to a person first, call Ecology’s Water Quality Program at 360-407-6600 and ask for the Industrial Stormwater unit. Staff can confirm you are using the right form for your situation.
Print the form only after you confirm the revision date reads 11/2024 in the lower corner. Keep a blank copy and a saved digital copy, because you will need a clean original for the mailed submission and a digital version for the email submission. People who request ADA accommodations, including materials for the visually impaired, can call the Water Quality Program at the number above or use Washington Relay Service at 711.
Step-by-Step: How to Fill Out Form ECY 070-361 Line by Line
Work through the form in the order it appears. Each section below matches a part of the official form, and the field names match what is printed on the 11/2024 version.
General Information: Permit # WAR
The form opens with a single line at the top labeled Permit #WAR, where you write your existing Industrial Stormwater General Permit number.
To answer it, copy the number exactly from your coverage letter, including the digits that follow the WAR prefix. Write it in all caps with no extra spaces.
For example, Riverside Metal Recycling enters WAR123456 on the Permit #WAR line, matching the number on its coverage letter word for word.
What if you hold coverage at more than one site? Then you file a separate form for each permit number, because each site has its own coverage and its own WAR number.
The most common mistake here is leaving this line blank or guessing the number from memory. If the number is wrong or missing, Ecology cannot match the request to your file, and the form gets set aside until staff track you down.
A common misconception is that the WAR number is the same as your business license or UBI number. It is not. The WAR number is unique to your stormwater permit coverage and appears only on Ecology paperwork.
Section I: Operator/Permittee Information
This section asks who holds the permit and where Ecology should send all mail. It includes the Operator/Permittee’s Name, Company Name, Phone Number, Street Address or P.O. Box, City, State, Zip + 4, and Email.
To answer it, write the operator name and company name exactly as they appear on your current permit, then add a phone number and email you check often. Use a full nine-digit Zip + 4 if you know it.
For example, Maria Chen, the plant manager at Riverside Metal Recycling, enters Maria Chen as the operator, Riverside Metal Recycling LLC as the company, 509-555-0147 as the phone, 412 River Road as the street, Spokane as the city, WA as the state, 99201-2204 as the Zip + 4, and mchen@riversidemetal.com as the email.
What if your mailing address is a P.O. Box, not a street address? The form allows either, so enter the box where you actually receive mail, because that is where Ecology sends every notice.
The most common mistake is listing a personal address or an old office that no longer receives mail. If Ecology mails a notice and it bounces, you can miss a deadline and lose your modification window.
A common misconception is that the email address replaces the mailing address. It does not. Ecology uses the mailing address for official correspondence, so both must be current and correct.
Section II: Modified Permit Information — Check All That Apply
This section is the heart of the form. It asks what you are changing and lets you check more than one box. The choices include a New Industrial Process (requires public notice) with space to list associated NAICS codes 1 through 5, the Type or Nature of New Industrial Activities, a question about new monitoring points, and a block of choices for the type of modification you are requesting.
To answer it, check every box that fits your situation. If you add a new process, list each NAICS code on its own numbered line and write a short, plain description of the activity in the Type or Nature of New Industrial Activities box.
For example, Riverside Metal Recycling adds a battery-crushing line. Maria checks New Industrial Process, writes 423930 on NAICS line 1, and describes the activity as lead-acid battery dismantling and crushing.
What if you have more than five NAICS codes? List the five most relevant codes on the form and attach a separate sheet with the rest, because the form gives only five numbered lines.
The most common mistake here is checking New Industrial Process but skipping the NAICS codes or the activity description. If you leave those blank, Ecology cannot judge the discharge risk, and the request stalls for more information.
A common misconception is that any small change needs the full new-process treatment. It does not. Only a true new industrial process triggers the public-notice requirement, so read the choices and check what actually applies.
Section II: New Monitoring Points and Discharge Identifiers
Inside Section II, the form asks: Are there new monitoring points associated with the new industrial process? No / Yes. If no, it asks you to list the previously established monitoring points tied to the new process, such as CB1 or DP4. If yes, it asks you to identify each new point with a Discharge identifier (no symbols, maximum of three characters, like 01A), a Latitude, a Longitude, and a Location description like Catch Basin 1.
To answer it, check No or Yes, then fill the matching block. For a new point, create a short identifier, find the coordinates, and describe the spot in everyday words.
For example, Riverside’s battery line drains to a new catch basin. Maria checks Yes, enters 02A as the discharge identifier, 47.6588 as the latitude, -117.4260 as the longitude, and Catch Basin near battery bay as the location description.
What if the new process drains to an existing monitoring point? Then check No and list that point’s existing identifier, because you do not need to invent a new one.
The most common mistake is using symbols or more than three characters in the discharge identifier, like #2-A. The form rejects symbols, so an entry like that can be kicked back for correction.
A common misconception is that latitude and longitude can be rough estimates. They should be accurate decimal coordinates, because Ecology maps your discharge point and uses it to track water quality near specific waters.
Section II: New Receiving Water (If Applicable)
The form provides a block for a New Receiving Water, with fields for the Receiving Water Body, its Latitude, and its Longitude. You complete this only if your change sends stormwater to a water body that was not on your permit before.
To answer it, name the water body the way it appears on maps, then add the latitude and longitude of the discharge location into that water.
For example, if the battery-bay catch basin ultimately drains to a creek not listed on the old permit, Maria writes Hangman Creek as the receiving water body and adds the coordinates of the outfall.
What if your discharge still goes to the same water body already on your permit? Leave this block blank, because it applies only to a new receiving water.
The most common mistake is naming a storm drain or pipe as the receiving water. The receiving water is the natural water body that finally gets the flow, so naming the pipe confuses where pollutants actually land.
A common misconception is that a municipal storm sewer counts as the receiving water. It usually does not. The receiving water is the creek, river, lake, or marine water the system eventually discharges to.
Section II: Type of Modification (Deadline Extension, Waiver, or Other)
This part asks What type of modification are you requesting? The choices are a Level 2 / Level 3 Deadline Extension (with a line for the new deadline in MM/DD/YYYY), a Level 2 / Level 3 Waiver, and Other (please explain). Level 2 and Level 3 refer to the corrective actions you must take when your monitoring shows pollutant levels above the permit’s benchmarks.
To answer it, check the box that matches your request and add the detail it calls for. A deadline extension needs the new date and an attached technical basis with a timeline. A waiver needs an attached technical basis explaining why corrective action is not feasible or not necessary.
For example, Cascade Lumber, a log-yard operator, cannot install a treatment system before its current deadline. Its environmental manager, David Olsen, checks Level 2 / Level 3 Deadline Extension, writes 09/30/2026 as the new deadline, and attaches a timeline showing permitting, design, and contracting steps.
What if you base a waiver on the claim that action is not necessary? Ecology recommends you attach an engineering report and sampling data, because the agency needs evidence the discharge will not violate water quality standards.
The most common mistake is checking the extension box but attaching no technical basis or timeline. Without that attachment, Ecology has nothing to evaluate and cannot grant the request.
A common misconception is that asking for an extension pauses your current deadline. It does not. Your existing deadline stays in force until Ecology approves the change in writing.
Section III: Public Notice
This section sets up the public notice you must run for a new industrial process. It states the rule plainly: you must publish a notice at least once a week for two consecutive weeks with seven days in between publications, in a single newspaper of general circulation in the county where the facility sits. Ecology cannot grant coverage sooner than the end of the 30-day public comment period, which begins on the date of the second public notice. The form asks for the Date of the first public notice, the Date of second public notice (Begins 30-day public comment period), and the Name of the newspaper that will publish the public notices.
To answer it, schedule both publication dates seven days apart, write them in MM/DD/YYYY format, and name the newspaper. Submit the form to Ecology on or before the date of the first public notice.
For example, the form’s own example shows a first notice of 01/01/2010 and a second notice of 01/08/2010. Following that pattern, Maria sets her first notice for 06/01/2026 and her second for 06/08/2026 in the Spokane Spokesman-Review.
What if your county has no daily newspaper? Use a weekly paper of general circulation in that county, because the rule requires county-level circulation, not a daily schedule.
The most common mistake is spacing the two notices wrong or starting the count from the first notice. The 30-day clock starts on the second notice, so a miscount delays your approval.
A common misconception is that you can publish first and file the form later. The form must reach Ecology on or before the first publication date, so filing late breaks the process.
Section III: Public Notice Template (WAC 173-226-130 Language)
The form includes a fill-in template for the actual notice text, and it warns that the bold language is required by WAC 173-226-130 and must be included in its entirety. You can use the fill-in template on the form or attach the notice on a separate sheet.
To answer it, drop your site-specific facts into the blanks: the company name, the site name, the site address and city, and a short list of the activities requiring modification. Keep every word of the bold, required language exactly as printed.
For example, Maria completes the template so it reads that Riverside Metal Recycling LLC is seeking modification of coverage at its site known as Riverside Metal Recycling, located at 412 River Road in Spokane, with activities including lead-acid battery dismantling and crushing.
What if your activities do not fit the small space? Attach the notice on a separate sheet, which the form expressly allows, and keep the required language intact.
The most common mistake is rewriting or trimming the bold required language. Changing it can make the notice legally insufficient, which can void the comment period and force you to republish.
A common misconception is that you can leave out the public-comment address. You cannot. The template must tell readers they may submit comments to Ecology in writing within 30 days of the last publication.
Section V: Certification of Permittee
The form ends with the Certification of Permittee, a sworn statement that the information is true, accurate, and complete, made under penalty of law including possible fine and imprisonment for knowing violations. It asks for the Printed Name/Company, Title, Signature, and Date.
To answer it, have an authorized person read the certification, then print their name and company, write their title, sign, and date the form. Federal rules require the signer to be a principal executive officer at least at the level of vice president for a corporation, a general partner for a partnership, the proprietor for a sole proprietorship, or a principal executive officer or ranking elected official for a municipal, state, or federal facility.
For example, Riverside Metal Recycling LLC is a corporation, so its vice president of operations, Robert Tran, prints his name and company, writes Vice President of Operations as the title, signs, and dates the form 05/30/2026.
What if the person who filled out the form is not an authorized signer? The authorized officer must still sign, because a signature from someone who does not qualify can invalidate the whole submission.
The most common mistake is letting a plant clerk or consultant sign in place of a qualified officer. If the wrong person signs, Ecology can reject the form and you start over.
A common misconception is that an electronic typed name always counts as a signature here. Because you must mail a signed original, treat the signature as a real, ink signature on the mailed copy.
Three Filled-Out Examples Using Real Scenarios
Below are three common situations, each following one filer through the most important parts of the form.
Scenario 1: Adding a New Industrial Process (Riverside Metal Recycling)
| Form Section | What Maria Enters |
|---|---|
| Permit #WAR | WAR123456 |
| Operator/Permittee’s Name | Maria Chen |
| Company Name | Riverside Metal Recycling LLC |
| Modification type checked | New Industrial Process (requires public notice) |
| NAICS code 1 | 423930 |
| Type or Nature of New Industrial Activities | Lead-acid battery dismantling and crushing |
| New monitoring point? | Yes — 02A, Catch Basin near battery bay |
| Date of first / second public notice | 06/01/2026 / 06/08/2026 |
| Certification signer | Robert Tran, Vice President of Operations |
Scenario 2: Level 2/Level 3 Deadline Extension (Cascade Lumber)
| Form Section | What David Enters |
|---|---|
| Permit #WAR | WAR098765 |
| Operator/Permittee’s Name | David Olsen |
| Company Name | Cascade Lumber Co. |
| Modification type checked | Level 2 / Level 3 Deadline Extension |
| New deadline requested | 09/30/2026 |
| Attachment included | Timeline covering design, permits, and contracting |
| New monitoring point? | No — existing point DP4 |
| Public notice required? | No — not a new industrial process |
| Certification signer | David Olsen, General Partner |
Scenario 3: Adding a New Monitoring Point Only (Harbor Boatworks)
| Form Section | What Janet Enters |
|---|---|
| Permit #WAR | WAR456789 |
| Operator/Permittee’s Name | Janet Reyes |
| Company Name | Harbor Boatworks Inc. |
| Modification type checked | Other (please explain): adding monitoring point |
| New monitoring point? | Yes — 03B |
| Latitude / Longitude | 47.2529 / -122.4443 |
| Location description | Catch Basin by paint shop |
| New receiving water? | No — same as current permit |
| Certification signer | Janet Reyes, President (sole proprietor’s officer) |
How to File the Completed Form
Ecology accepts this form through email and mail, and you must use both for a new-process modification. The form is explicit: email a signed copy first, then follow up with the signed original by mail.
- Email channel. Sign the form, scan it with attachments, and email the copy to ecyrewqianoi@ecy.wa.gov. There is no fee charged at submission for the modification form itself; your ongoing permit fee is billed separately under the Water Quality Permit Fee Schedule. Email gives Ecology a quick first look, and you should save the sent email and any read receipt as proof of filing.
- Mail channel. Mail the signed ORIGINAL document and attachments to: Department of Ecology, Attn: Water Quality Program, Industrial Stormwater, PO Box 47696, Olympia, WA 98504-7696. Use a mail service that gives you tracking or certified-mail proof, and keep the receipt, because the original signature on file is what completes your submission.
For any modification tied to a new industrial process, time your submission so the form reaches Ecology on or before the date of your first public notice. Processing is governed by the 30-day comment period, so the soonest Ecology can act is after that window closes. Your annual permit fees continue under your existing coverage during this time, and those fees fund the staff who process permit applications and modifications.
What Happens After You File
After Ecology receives your form, staff confirm it is complete and matched to your WAR number. For a new-process modification, they wait out the 30-day public comment period that starts on your second publication date, because the public has a right to weigh in. Ecology cannot grant the modified coverage before that period ends.
If comments raise concerns, Ecology may ask you for more information or adjust the conditions of your modified coverage. For a deadline extension or waiver, staff review your attached technical basis and either approve, deny, or ask for more support. You should keep your operation within your current permit terms until you get written confirmation that the modification is approved.
Once approved, Ecology updates your coverage, and you follow the new monitoring or schedule terms going forward. Keep the approval letter with your permit records, because you may need to show it during an inspection. If your request is denied, the denial usually explains what was missing, so you can fix it and refile.
Mistakes to Avoid When Filling Out the Form
- Leaving the Permit #WAR line blank, which means Ecology cannot match your request to your file and sets it aside.
- Using an old form version instead of ECY 070-361 (11/2024), which can cause Ecology to return it.
- Listing an outdated mailing address, which makes you miss notices Ecology mails to you.
- Checking New Industrial Process but omitting the NAICS codes, which leaves Ecology unable to judge the discharge.
- Using symbols or more than three characters in a Discharge identifier, which the form does not accept.
- Estimating latitude and longitude loosely, which misplaces your discharge point on Ecology’s maps.
- Naming a pipe or storm drain as the Receiving Water Body, which hides where pollutants really go.
- Requesting a deadline extension with no attached technical basis or timeline, which gives Ecology nothing to approve.
- Spacing the two public notices incorrectly or counting the 30 days from the first notice, which delays approval.
- Editing the bold required public-notice language, which can make the notice legally insufficient and force a republish.
- Filing the form after the first publication date, which breaks the required timing.
- Letting an unauthorized person sign the certification, which can void the entire submission.
- Emailing the form but never mailing the signed original, which leaves your filing incomplete.
Do’s and Don’ts
Do:
- Do confirm the form reads 11/2024 before you start, so you use the version Ecology accepts.
- Do copy your WAR number exactly from your coverage letter, because an exact match speeds processing.
- Do check every box in Section II that applies, since a modification can involve more than one change.
- Do attach a clear timeline for any deadline extension, because Ecology needs to see the path to completion.
- Do schedule both public notices seven days apart, so your 30-day clock starts correctly.
- Do save proof of your email and certified mail, because that proof protects you if a question comes up later.
Don’t:
- Don’t guess your WAR number from memory, because a wrong number stalls the whole request.
- Don’t use symbols in discharge identifiers, since the form rejects them.
- Don’t trim or reword the bold public-notice language, because it is required in full by rule.
- Don’t sign with someone who is not an authorized officer, since that can invalidate the form.
- Don’t assume your old deadline pauses while you wait, because it stays in force until approval.
- Don’t skip the mailed original after emailing, because both steps complete the filing.
Pros and Cons of Filing on Your Own vs. With Professional Help
| Filing on Your Own | Filing With a Consultant or Attorney |
|---|---|
| Costs less, since you avoid professional fees, which helps a small operator. | Costs more, because you pay for expertise, though it can prevent costly errors. |
| Builds your in-house knowledge of the permit, which helps with future filings. | Saves your time, since the expert handles the technical basis and coordinates the notice. |
| Works well for simple changes like adding one monitoring point, because the form is short. | Helps most with complex waivers, since the technical basis must persuade Ecology. |
| Gives you full control over timing, so you set the notice dates yourself. | Reduces the risk of a rejected technical basis, which protects your deadline. |
| Risks missing a nuance like the signer rule, which can void the form. | Adds a layer of review on coordinates, NAICS codes, and required language, which lowers error risk. |
Key Agencies, Statutes, and Related Forms
The Washington State Department of Ecology is the agency that issues and modifies the Industrial Stormwater General Permit. The permit exists under the federal Clean Water Act’s NPDES program, which Ecology runs in Washington, and under state water-quality law. The public-notice steps on this form come straight from WAC 173-226-130, the rule on modifying general permit coverage.
Related forms and processes interact with this one. A brand-new applicant files an application for ISGP coverage, not this modification form. A site that is closing files a Notice of Termination instead. Sites that need to report production or revenue for billing complete Annual Fee Calculation Forms, which feed the permit fee schedule. Knowing which form fits your situation keeps your filing on track.
FAQs
Is the Water Quality Modification Permit a separate permit from my stormwater permit?
No. It is not a new permit. Form ECY 070-361 modifies your existing Industrial Stormwater General Permit coverage, so you keep your same WAR number and your same overall permit.
Do I need to run a public notice for every modification?
No. Only a new industrial process requires public notice under the form. Deadline extensions, waivers, and simple monitoring-point changes generally do not trigger the two-week notice requirement.
Is the WAR number the same as my business license number?
No. The WAR number is unique to your stormwater permit coverage and appears only on Ecology paperwork, while your business license or UBI number is a separate state registration number.
Do I write symbols in the Discharge identifier box?
No. The form states the identifier cannot be symbols and must be a maximum of three characters, such as 01A, so use only letters and numbers.
Do I count the 30-day comment period from my first public notice?
No. The 30-day public comment period begins on the date of your second public notice, not the first, so count carefully to avoid delay.
Can I email the form and skip mailing the original?
No. The form requires you to email a signed copy and then follow up with the signed ORIGINAL by mail, so both steps are needed to complete your filing.
Do I name the storm drain as my Receiving Water Body?
No. You name the natural water body that finally receives the flow, like a creek or river, because the storm drain only carries water to that water body.
Can my consultant sign the Certification of Permittee?
No. Federal rules require an authorized officer to sign, such as a vice president for a corporation or the proprietor for a sole proprietorship, not a consultant.
Does asking for a deadline extension pause my current deadline?
No. Your current Level 2 or Level 3 deadline stays in force until Ecology approves your extension in writing, so keep working toward the original date.
Is there a fee charged when I submit the modification form?
No. The form itself does not carry a separate submission fee, though your ongoing annual permit fee is billed separately under Ecology’s Water Quality Permit Fee Schedule.
Can I edit the bold public-notice language to fit my space?
No. The bold language is required by WAC 173-226-130 and must appear in full, so attach a separate sheet if you need more room rather than trimming it.
Do I file a separate form for each site I operate?
Yes. Each site has its own coverage and its own WAR number, so you complete and submit a separate Form ECY 070-361 for each permitted location.
Can I list more than five NAICS codes on the form?
Yes. You list the five most relevant codes on the numbered lines and attach a separate sheet for any additional codes, since the form provides only five lines.
Is decimal latitude and longitude accuracy important for new monitoring points?
Yes. Ecology maps your discharge point using those coordinates, so accurate decimal latitude and longitude help the agency track water quality near specific receiving waters.
Related reading
- How to Fill Out the Washington Ecology NPDES Construction Stormwater General Permit + FAQs
- How to Fill Out the Washington Ecology NPDES Industrial Stormwater Permit (NOI) + FAQs
- How to Fill Out the Washington Ecology Underground Storage Tank 30-Day Notice + FAQs
- How to Fill Out the Washington Ecology Water Quality Modification Permit + FAQs
- How to Fill Out the Washington Ecology NPDES Construction Stormwater Permit (Notice of Intent) + FAQs
- How to Fill Out Washington Ecology NPDES Industrial Stormwater Permit (2025 ISGP) + FAQs