A New Jersey Board of Public Utilities (NJBPU) tariff filing is the formal package a public utility submits to put its rates, charges, terms, and conditions of service on the public record, and every regulated electric, gas, water, wastewater, and telecommunications utility in the state must file and maintain one with the Board of Public Utilities. The filing pairs a petition written in numbered paragraphs with a set of tariff sheets, each carrying a strict header that names the issuer, the date of issue, the effective date, the revised sheet number, and the docket number, all governed by the Board’s Rules of Practice at N.J.A.C. 14:1.
Getting one line of that header wrong, or skipping the notice rules in N.J.A.C. 14:1-5.12, can stop the whole filing cold. The Board reviews thousands of tariff and rate documents each year, and a base rate case can run a statutory clock of up to nine months before the Board must decide, so a rejected sheet that pushes you back to the start of that clock is costly. This guide walks you through the filing field by field, the way a 30-year rate-case veteran would.
- ๐ What a tariff filing is, who must file it, and which statute forces the filing.
- ๐๏ธ Every document and number you must gather before you open a single sheet.
- โ๏ธ A line-by-line walkthrough of the tariff sheet header and the petition paragraphs.
- ๐งพ Three full filer scenarios, from a small water company to a large electric utility.
- โ ๏ธ The field-level mistakes that get sheets rejected and how to dodge each one.
What a Tariff Filing Is and Who Must File It
A tariff is the legal rulebook for a utility’s service, and a tariff filing is how that rulebook gets created, changed, or replaced on the Board’s record. The tariff states the price of each service classification, the rules for getting and keeping service, and the riders that adjust charges for things like the Societal Benefits Charge or Basic Gas Supply Service. When a utility wants to raise rates, add a charge, or reword a term, it files revised tariff sheets so the public, the Division of Rate Counsel, and the Board can see exactly what changed.
Every public utility in New Jersey must file. The Board’s power comes from Title 48 of the New Jersey Statutes, and N.J.S.A. 48:2-21 gives the Board authority over just and reasonable rates. This reaches investor-owned electric utilities like PSE&G and Jersey Central Power & Light, gas utilities like New Jersey Natural Gas, regulated water and wastewater companies, and competitive third-party suppliers that must file rate sheets under their own BPU numbers.
The filing solves a basic problem: a utility is a monopoly, so it cannot set its own prices in secret. Marcus, a rate analyst at a small water company, learns this the hard way when he tries to bill a new charge that never appeared on a filed sheet, and customers dispute it. A charge that is not in the filed tariff is not lawful to collect, and the utility may have to refund it. The tariff filing is the only path that makes a rate enforceable, which is why the field-level rules below matter so much.
Before You Start: Documents and Information You Need
Gather everything before you open the first sheet, because a missing piece is the top reason filings stall. The Board treats an incomplete filing as not properly filed, which means your effective-date clock does not start. Below is the pre-filing checklist.
- Your current effective tariff (the “BPU No.”). You need the exact BPU number and the latest sheet revisions, because new sheets must “supersede” the right prior sheet. Without it, your revised sheet numbering will be wrong and the sheet bounces.
- The proposed revised tariff sheets. These are the heart of the filing; missing or mislabeled sheets mean the Board cannot tell what you are changing.
- A petition in numbered paragraphs. This formal request tells the Board what relief you seek; without it the Board has no legal request to act on.
- Supporting testimony and schedules. A base rate case needs financial schedules and witness testimony; without them the case is deficient and the Board can reject the filing.
- The docket number, once assigned. You put it on every later document; using the wrong docket misroutes your filing.
- The $25 filing fee. A petition needs a check or money order to Treasurer, State of New Jersey; a missing fee delays docketing.
- Your service list, including Rate Counsel. You must serve the Division of Rate Counsel and any party; failure to serve voids proper notice.
- Proof of public/newspaper notice for rate increases. Rate-increase filings require customer notice; missing notice can delay or bar the increase.
- The authorizing officer’s name and title. Every sheet must be “Issued by” a real officer; a blank issuer line invalidates the sheet.
Pulling these together early lets Marcus file clean the first time instead of refiling weeks later.
Where to Get the Form and How to Access It
There is no single fill-in PDF for a tariff filing. Instead, you build the package from the Board’s rules and templates, and you model your tariff sheets on the format every NJ utility already uses. Start at the NJBPU Rules of Practice, N.J.A.C. 14:1, which sets the filing format, and review N.J.A.C. 14:1-5.12 for tariff filings that propose increases. For a sample of a properly formatted sheet, pull any current utility tariff, such as the New Jersey Natural Gas tariff, and copy its header layout exactly.
You access the live record and file through the Board’s public access docket portal, where filings, board orders, and existing tariffs are posted. The Board has moved most filing into this electronic system, so most filers now submit there. You can still mail paper copies to the Board Secretary when the matter or rule calls for it.
The clean-energy filing instructions confirm the baseline: under the Board’s petition filing procedure, you submit the original petition plus four copies to the Secretary, copy the relevant Division Director, and include the $25 fee. Janet, who runs regulatory affairs at a wastewater utility, keeps both the portal upload and a mailed paper set so she has proof in either channel.
Step-by-Step: How to Fill Out the NJBPU Tariff Filing Line by Line
This section is the spine of the filing. It covers the tariff sheet header fields first, because every sheet repeats them, then the petition paragraphs that carry the legal request. Use the exact labels printed on the official sheets.
1. Utility Name and “BPU No.” Line (Top of Each Sheet)
This top line asks which utility files the sheet and under which tariff number. Type your full legal company name in capitals, then the tariff designation, such as BPU No. 12 – Gas. For example, New Jersey Natural Gas Company enters its name and BPU No. 12 – Gas at the top right of every sheet. If your company holds separate gas and electric tariffs, use the matching BPU number for each; never mix them. The most common mistake is reusing an old BPU number after the Board has assigned a new one, which makes the sheet file into a dead tariff and the change never takes effect. Many filers wrongly believe the BPU number is just a label, but it is the legal identity of the whole tariff, and the wrong number means the wrong rulebook.
2. Sheet Number and Revision Status (“Original” / “First Revised Sheet No.”)
This field asks where the sheet sits in the tariff and whether it replaces an earlier version. Write the page as Original Sheet No. 3 the first time a sheet exists, then First Revised Sheet No. 3 the next time, then Second Revised Sheet No. 3, and so on. New Jersey Natural Gas shows this exactly when it files First Revised Sheet No. 3 and adds Superseding Original Sheet No. 3 beneath it. The edge case filers miss: if you skip a revision level, say jumping from Original straight to Second Revised, the Board cannot match the supersede chain and the sheet is rejected. The direct consequence of a wrong revision number is that your new rate has no lawful prior sheet to replace, so the old rate stays in force. The misconception here is that the number is cosmetic; in truth, the revision number is how the Board and the public track every change to a single page across decades.
3. “Superseding” Line
This line asks which exact prior sheet the new one cancels. Write Superseding [Original/First Revised] Sheet No. [X] directly under the new sheet’s own number. For example, a sheet labeled Second Revised Sheet No. 51 carries Superseding First Revised Sheet No. 51. If the prior version was withdrawn rather than replaced, note that the sheet supersedes the last live version, not a canceled one. A common error is naming a supersede target that does not match the current effective sheet on file, which breaks the chain and triggers a deficiency notice. Filers often assume the supersede line is optional on revised sheets, but leaving it off makes it unclear what the sheet replaces, and the Board treats that as an incomplete revision.
4. “Date of Issue”
This field asks the date the utility issues the sheet, not the date service changes. Enter the issue date in month-day-year form, such as March 19, 2026. Anne-Marie Peracchio, a Vice President, enters Date of Issue: March 19, 2026 on the New Jersey Natural Gas revised sheet. The nuance: the issue date should match or follow the Board order date that authorizes the change, never precede the authority for it. A frequent mistake is dating the issue earlier than the order that approves it, which makes the sheet look issued without authority and invites rejection. People wrongly think the issue date and the effective date can be the same casual entry, but they serve different legal jobs and the Board reads them separately.
5. “Effective for Service Rendered On and After” (Effective Date)
This field asks when customers actually start being billed under the new sheet. Enter the effective date plainly, such as and after April 1, 2026. The New Jersey Natural Gas sheet pairs a March 19 issue date with an and after April 1, 2026 effective date, leaving a notice gap between them. The critical edge case lives in N.J.A.C. 14:1-5.12: a tariff filing that proposes an increase generally cannot take effect on less than the required statutory notice, and the Board can suspend the effective date. If you set an effective date too soon, the Board suspends it and your increase is frozen until the case is decided. The big misconception is that you choose the effective date freely; for increases, the law and the Board control it, and an early date will be struck.
6. “Issued By” (Authorizing Officer Name and Title)
This field asks which company officer takes legal responsibility for the sheet. Print the officer’s full name and title, such as Mark G. Kahrer, Senior Vice President, with the company’s city and state below, like Wall, NJ 07719. Each sheet must name a real, authorized officer, not a clerk or an outside lawyer. The edge case: if the signing officer changes between filings, update the name; do not leave the prior officer’s name on new sheets. A blank or stale issuer line is a common defect, and the consequence is that the sheet has no accountable issuer, so the Board can refuse it. Filers often think any employee can be named here, but the issuer must be an officer with authority to bind the company to the tariff.
7. “Filed Pursuant to Order of the Board… in Docket No.”
This field ties the sheet to the Board decision that authorized it. Write Filed pursuant to Order of the Board of Public Utilities dated [date] in Docket No. [number], for example dated March 18, 2026 in Docket No. QO23030150. Use the docket number the Board assigned to your matter and the exact date the Board signed the order. The nuance: an original filing that has not yet been approved may instead reference that it is “filed pursuant to” the Rules of Practice rather than an order, until an order issues. The mistake filers make is citing the wrong docket or a non-existent order date, which makes the sheet look unauthorized and stalls it. The misconception is that this line is boilerplate; it is the legal hook proving the Board allowed the change.
8. Petition Caption and Numbered Paragraphs
The petition is the formal request that sits in front of the sheets, and this part asks who you are and what you want the Board to do. Open with a caption, In the Matter of the Petition of [Company] for [relief], then write the body in numbered paragraphs as the Board’s petition procedure requires. Paragraph 1 identifies the petitioner, the next paragraphs state the facts, and the closing paragraphs state the exact relief, such as approval of revised sheets and new rates. For example, Aisha, counsel for an electric utility, writes “Petitioner respectfully requests that the Board approve the attached revised tariff sheets effective June 1, 2026.” The edge case: in a contested case, a corporation must be represented by a New Jersey attorney, so a non-lawyer cannot sign the petition for the company. A vague relief paragraph is a common defect, and the consequence is that the Board may not grant what you never clearly asked for. Filers wrongly think the petition can be a casual letter, but unnumbered, request-free petitions get returned.
9. Verification, Service List, and Filing Fee Block
This final part asks you to verify the petition, prove service, and pay. Include a verification signed by an officer swearing the facts are true, a certification of service listing everyone served including the Division of Rate Counsel, and the $25 fee payable to Treasurer, State of New Jersey. Carlos, filing for a wastewater utility, lists the Board Secretary, Rate Counsel, and the Division Director on his certification. The edge case: electronic filings through the portal may handle the fee and service differently, so confirm the current portal rules before mailing a check. The mistake of leaving Rate Counsel off the service list voids proper notice and can delay the case. People assume the fee is waived for small utilities, but the $25 petition fee applies broadly, and a missing fee holds up docketing.
Three Filled-Out Examples Using Real Scenarios
Below are three common filer paths, each following one named person through the filing.
Scenario 1 โ Marcus files a base rate increase for a small water company
| Filing Section | What Marcus Enters |
|---|---|
| Utility Name / BPU No. | Clearbrook Water Company, BPU No. 4 – Water |
| Sheet number | First Revised Sheet No. 21 |
| Superseding line | Superseding Original Sheet No. 21 |
| Date of Issue | April 15, 2026 |
| Effective date | and after such date as the Board approves |
| Issued By | Marcus Reyes, President, Edison, NJ |
| Petition relief | “Approve a $1.2M base rate increase and revised sheets” |
| Fee and service | $25 check to Treasurer, State of New Jersey; serve Rate Counsel |
Scenario 2 โ Aisha files compliance tariff sheets after a BGS auction order
| Filing Section | What Aisha Enters |
|---|---|
| Utility Name / BPU No. | Garden State Electric, BPU No. 16 – Electric |
| Sheet number | Seventh Revised Sheet No. 69 |
| Superseding line | Superseding Sixth Revised Sheet No. 69 |
| Date of Issue | May 22, 2026 |
| Effective date | and after June 1, 2026 |
| Filed pursuant to | Order dated May 20, 2026 in Docket No. ER25040428 |
| Petition relief | “Implement Board-approved BGS auction rates” |
| Fee and service | Serve Board Secretary and Rate Counsel; portal upload |
Scenario 3 โ Janet files a clean-energy program rider tariff
| Filing Section | What Janet Enters |
|---|---|
| Utility Name / BPU No. | Coastal Gas Company, BPU No. 12 – Gas |
| Sheet number | Original Sheet No. 167 |
| Rider title | Rider “E” New Jersey’s Clean Energy Program |
| Date of Issue | March 19, 2026 |
| Effective date | and after April 1, 2026 |
| Filed pursuant to | Order dated March 18, 2026 in Docket No. QO23030150 |
| Issued By | Janet Okafor, Vice President, Trenton, NJ |
| Fee and service | $25 fee; copy Division of Clean Energy Director |
How to File the Completed Form
You can file through the electronic portal, by mail, or in person, and the right channel depends on the matter and the current Board rule.
- Electronic portal. Upload the petition and sheets through the BPU public access docket. This is now the primary channel for most filings. Keep the confirmation screen and assigned docket number as your proof of filing; processing of a base rate case can run up to the nine-month statutory period.
- By mail. Send the original petition plus four copies to the Secretary of the Board, New Jersey Board of Public Utilities, 44 South Clinton Avenue, P.O. Box 350, Trenton, NJ 08625-0350. Include the $25 fee by check or money order to Treasurer, State of New Jersey. Keep a date-stamped mailing receipt as proof.
- In person. Deliver the same paper set to the Trenton office during business hours and ask for a date stamp on your copy. The fee is paid by check; cash is not the accepted method. Your stamped copy is your proof of filing.
For every channel, you must also serve the Division of Rate Counsel and any named party, and you keep the certification of service as proof that notice was given.
What Happens After You File
Once filed, your matter receives a docket number, and you must put that number on every later document. The Board Secretary serves the petition on respondents and parties, and Rate Counsel reviews the filing on behalf of customers. For a rate increase, the Board can suspend the proposed effective date under N.J.A.C. 14:1-5.12 while it studies the request, so your new rate does not take effect on the date you wrote until the Board acts.
If the case is “contested,” meaning the parties dispute key facts, the Board or the Office of Administrative Law may hold evidentiary hearings, and a corporate party must appear through a New Jersey attorney. A base rate case commonly takes several months and can run the full statutory clock before a final Board Order issues. When the Board approves your rates, you file compliance tariff sheets that match the order exactly, with the order date and docket in the “Filed pursuant to” line, and those sheets become the new effective tariff.
Mistakes to Avoid When Filling Out the Form
- Reusing an old BPU number after a new one was assigned; the change files into a dead tariff and never takes effect.
- Skipping a revision level (Original to Second Revised); the supersede chain breaks and the sheet is rejected.
- Naming the wrong supersede target; the Board issues a deficiency notice and the old rate stays in force.
- Dating the issue line before the authorizing order; the sheet looks unauthorized and bounces.
- Setting an effective date inside the protected notice window for an increase; the Board suspends the date.
- Leaving the “Issued By” officer line blank or stale; the sheet has no accountable issuer and can be refused.
- Citing a wrong or non-existent docket or order date; the filing stalls as unauthorized.
- Writing the petition as an unnumbered letter; the Board returns it as improperly formatted.
- Omitting the relief paragraph; the Board cannot grant what you never clearly requested.
- Forgetting to serve the Division of Rate Counsel; proper notice is void and the case is delayed.
- Leaving out the $25 fee; the petition is not docketed on time.
- Filing without required testimony or schedules in a base rate case; the case is deficient and rejected.
Do’s and Don’ts
Do’s
- Do copy the header layout from a current, approved utility tariff, because the Board expects the exact format.
- Do confirm your latest effective sheet before numbering, because the supersede line must match it.
- Do cite the Board order date and docket precisely, because that line proves your authority to change rates.
- Do serve Rate Counsel every time, because their review is built into the process and notice depends on it.
- Do keep proof of filing for every channel, because you may need to show the date you filed.
- Do read N.J.A.C. 14:1-5.12 before setting an effective date, because increases follow special timing.
Don’ts
- Don’t guess the BPU number, because the wrong number files into the wrong tariff.
- Don’t backdate the issue line, because issuing before authority invites rejection.
- Don’t let a non-attorney sign for a corporation in a contested case, because the rules require NJ counsel.
- Don’t merge several rate changes into one vague sheet, because the Board needs to see each change clearly.
- Don’t assume small utilities skip the fee, because the $25 fee applies broadly.
- Don’t collect a charge that is not on a filed sheet, because unfiled charges are unlawful to bill.
Pros and Cons of Filing on Your Own vs. With Help
| Filing Approach | What It Means for You |
|---|---|
| Pro: Filing pro se costs less | You save on attorney fees, which helps a small water or wastewater company with a tight budget. |
| Pro: You know your own numbers | In-house staff understand the rate base and usage data better than an outsider. |
| Pro: Faster simple filings | A routine compliance sheet can move quickly without coordinating outside counsel. |
| Pro: Direct control | You manage the timeline and decisions without a third party in the loop. |
| Pro: Builds internal expertise | Each filing teaches your team the Board’s exact format for next time. |
| Con: Contested cases need an attorney | A corporation must use NJ counsel in a contested case, so pro se has a hard limit. |
| Con: Format errors are easy | One wrong revision number can sink the filing, and veterans catch these fast. |
| Con: Base rate cases are complex | Testimony and schedules are technical, and gaps make the case deficient. |
| Con: Notice and timing traps | N.J.A.C. 14:1-5.12 timing is unforgiving, and a missed window suspends your rate. |
| Con: Higher rejection risk | Without experience, deficiency notices can reset your effective-date clock. |
FAQs
Do I file one tariff sheet or replace the whole tariff for a small change?
No. You file only the revised sheets that change, each labeled with the next revision number and a supersede line, while the rest of your tariff stays in force.
Do I write “Original” or “First Revised” on a brand-new sheet?
No. A sheet that has never existed before is Original Sheet No. [X]; you use First Revised only the next time you change that same sheet.
Do I put the issue date or the effective date as the date I mail the filing?
No. Neither date is the mailing date. The Date of Issue is when you issue the sheet, and the effective date is when billing changes.
Do I name an outside attorney on the “Issued By” line?
No. That line must name a company officer with authority to bind the utility, such as a Vice President or President, not outside counsel.
Do I need a docket number before I file?
No. The Board assigns the docket number after you file; you then put that number on every later document in the matter.
Do I have to pay the $25 fee if I am a small utility?
Yes. The $25 petition fee, payable to Treasurer, State of New Jersey, applies broadly, and a missing fee delays docketing of your petition.
Do I have to serve the Division of Rate Counsel?
Yes. You must serve Rate Counsel and any named party, and you keep the certification of service as proof that proper notice was given.
Do I get to choose any effective date I want for a rate increase?
No. For increases, N.J.A.C. 14:1-5.12 and the statute control the timing, and the Board can suspend an effective date set too soon.
Do I need a lawyer to file?
No. Routine filings can be done in-house, but a corporation in a contested case must be represented by a New Jersey attorney.
Do I file through the portal or by mail?
Yes. The Board’s electronic public access docket is the primary channel, though paper filing to the Board Secretary remains available for some matters.
Do I cite the Board order in the “Filed pursuant to” line on a brand-new petition?
No. If no order exists yet, you reference the Rules of Practice; you cite the order date and docket only after the Board approves the change.
Do unfiled charges still count if customers already paid them?
No. A charge that is not on a filed tariff sheet is unlawful to collect, and the utility may be required to refund it to customers.
Do I list every changed sheet in the petition?
Yes. The petition’s relief paragraph should clearly identify the revised sheets you want approved so the Board grants exactly what you request.
Do I keep the old superseded sheet on file?
Yes. The superseded sheet stays part of the tariff history so the Board and the public can trace every change to that page over time.
Related reading
- How to Fill Out New Jersey Form CBT-100 (w/Examples) + FAQs
- How to Fill Out New Jersey Form CN-12190 (w/Examples) + FAQs
- How to Fill Out New Jersey Form NJ-PT-1 (w/Examples) + FAQs
- How to Fill Out Michigan MPSC Tariff Filing Cover Sheet + FAQs
- How to Fill Out New Jersey Form CN-10510 (w/Examples) + FAQs
- How to Fill Out the NJDEP Underground Storage Tank Registration (USTFCQ) + FAQs
- How to Fill Out New Jersey Form NJ-1080-C (w/Examples) + FAQs